Mississippi businesses and farms received 91 Rural Energy for America Program (REAP) grants in FY2024 to FY2026, more than any of the four neighbouring states, yet none took a REAP guaranteed loan, and Census counts only eight solar and other renewable generating companies in the state, all utility-scale by their pay. Under the REAP rule effective 16 October 2026, that history matters less than it used to: grants now arrive only after a system has run for 12 months and cover at most 25 percent of cost, so the loan that builds the project carries the risk. A USDA solar feasibility study in Mississippi now has to show that a specific array or efficiency project pays for itself from metered savings, with or without a grant.
Solar and renewable energy in Mississippi: market evidence
Mississippi: solar and other renewable power generation, supply and rural footprint
| Measure | Mississippi | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 8 (n/a) | 405 → 942 |
| Per 100,000 residents (2023) | 0.3 | 0.3 |
| Average employees per establishment | 12.9 | 12.3 |
| Average annual pay per employee | $150,689 | $138,631 |
| Share of state population in non-metro counties (2025) | 50.0% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Why the Census data do not describe the REAP market. Eight generating companies, with 103 employees paid $150,689 on average, are power producers selling into the grid. REAP serves something else: a poultry grower's roof array, a mill's efficiency retrofit, a rural store's lighting and refrigeration upgrade, all sized to the owner's own historical energy use. Those projects show up in USDA award records, not in the Census count. The real Mississippi evidence is therefore the 91 REAP grants in FY2024 to FY2026, which rank Mississippi 24th of the 51 jurisdictions (the states and the District of Columbia) in USAspending's count, against 6,722 nationally, and the absence of REAP guaranteed loans: zero in Mississippi and only 75 nationwide in those three years. Under the new rule the guaranteed loan becomes the financing that matters, so a Mississippi lender will be underwriting a product it has rarely, if ever, used.
Regional comparison
| State | Payroll establishments 2023 | Per 100k residents | Staff per site | Average pay | SBA 7(a) loans, 2020-26 | Average 7(a) loan, 2020-26 |
|---|---|---|---|---|---|---|
| Mississippi | 8 | 0.3 | 12.9 | $150,689 | 1 | $97,300 |
| Alabama | 4 | 0.1 | 5.8 | $92,087 | 0 | none |
| Louisiana | 7 | 0.2 | 12.1 | $139,553 | 0 | none |
| Tennessee | 15 | 0.2 | 0.3 | $841,400 | 0 | none |
| Arkansas | 11 | 0.4 | 20.0 | $134,800 | 1 | $14,100 |
| United States | 942 | 0.3 | 12.3 | $138,631 | 138 | $478,591 |
Computed from each state's own pack (Census County Business Patterns 2023; SBA 7(a) FOIA data as of 30 Sep 2026); the figures for Alabama, Louisiana, Tennessee and Arkansas are theirs. All five states had zero or near-zero establishments in 2019.
Every state in the region went from zero or nearly zero payroll generators in 2019 to a handful in 2023 (Alabama's four existed in both years), and Tennessee's staffing and pay figures rest on five reported employees, so they are not usable benchmarks. SBA lending is negligible: one Mississippi loan of $97,300 in FY2024 to FY2026 and one Arkansas loan of $14,100 in FY2020 to FY2026. REAP grant counts in FY2024 to FY2026, from USAspending, tell more: Mississippi 91, Tennessee 85, Louisiana 72, Arkansas 70 and Alabama 61, with no REAP guaranteed loans in any of the five. Nationally SBA made 138 renewable generation loans averaging $478,591 in FY2020 to FY2026, and of 31 seasoned loans from the first period, 12.9 percent ended in charge-off, on average 51 months after approval, the highest national loss rate on this site's Mississippi pages, from a small sample.
Eligibility and program rules in Mississippi
B&I. The hub states that since an August 2025 USDA letter, wind and solar projects are ineligible for B&I, and routes farm and small-business solar to REAP. That letter is not among this page's verified sources, but no Mississippi solar project should be planned on a B&I guarantee without confirming it.
REAP guaranteed loans follow the OneRD rural definition in 7 CFR 5001.3, which leaves out large cities (over 50,000 at the last full census) and the urbanized land joined to them. On the Mississippi hub, Jackson, Gulfport and Southaven exceeded 50,000 in 2020, and their suburbs are presumed out. The borrower screens of 5001.127 apply as for any guaranteed loan, and the hub adds that under the 2026 rule any applicant with gambling income is ineligible for REAP.
The REAP rule effective 16 October 2026 sets the project tests. The study has to address each one:
| Topic | Rule effective 16 October 2026 | What it means in Mississippi |
|---|---|---|
| Timing | Project Period ends 12 to 24 months before the application (12 to 36 in the first window) | The study supports the loan that builds the system; the grant comes later |
| Data | 12 months of actual production or savings and 12 months of pre-installation data | Utility bills before and meter data after are part of the file |
| Award size | Minimum $1,500; maximum $500,000 renewable, $250,000 efficiency | A large poultry or mill project may hit the cap |
| Cost share | Grant at most 25% of project cost | Owner and lender finance at least 75% |
| Combined REAP funding | Grant plus guaranteed loan at most 75% of cost | A full 75% REAP loan leaves no room for a grant |
| Cropland | Ground-mount solar or wind on Cropland (7 CFR 718.2) ineligible | Delta and Black Prairie field sites are screened out; roofs and non-cropland sites remain |
| Foreign components | Components from a foreign adversary under 15 CFR 791.4 ineligible | A country-of-origin list for every component |
| Sizing | Ground-mount sized to historical use; storage at most 120% of prior annual use | Load analysis from the owner's bills |
| Economics | Simple payback no longer than useful life | Payback is an eligibility test, not just a ratio |
| Exclusions | EV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projects | Fuel stations cannot fund dispensing or chargers |
| Applicant | One application per federal fiscal year per highest-level owner group; site owned or leased 12 months before the Project Period | Ownership charts and site control evidence |
| Installers | Licensed in the state, at least three similar installations; procurement under 2 CFR 200.318 to 200.327 | Installer credentials in the file |
| Competition | One national competition (plus one for requests of $20,000 or less); no state competitions | Mississippi applicants compete nationally |
Summarised from the REAP final rule, 91 FR 62600 (1 October 2026), as recorded on the site's national renewable energy page.
Financing benchmarks: USDA REAP and B&I next to SBA
Mississippi: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 0 | $0 | 0 | $0 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 0 | $0 | 0 | $0 |
| FY2024 to FY2026 | 1 | $97,300 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $97,300. Mississippi had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
The REAP guaranteed loan in FY2026 carries an 80 percent guarantee, a 1.0 percent upfront fee and a 0.25 percent annual retention fee, with an extra 0.50 percent if the guarantee issues before construction is complete (91 FR 11272), against 3.0 and 0.55 percent for B&I. Term follows useful life under 7 CFR 5001.402. The study requirement in 5001.306(a)(3)(i) bites only above $1,000,000 for a new business; most farm and small-business REAP loans are smaller, so the Agency's discretion and the lender's credit policy decide.
Worked example (illustrative)
The project is an illustrative $640,000 solar array for an agricultural or rural business owner. The REAP loan in Structure A is $480,000, the national FY2020 to FY2026 average SBA renewable generation loan ($478,591) rounded, which is also exactly 75 percent of cost, the combined REAP ceiling. Structure B borrows $320,000 (50 percent) and plans a 25 percent grant of $160,000 after 12 months of operation. Both assume 7.00 percent over 20 years.
| Input or result | Structure A: REAP loan at 75% of cost | Structure B: REAP loan at 50% plus later grant |
|---|---|---|
| Loan amount | $480,000.00 | $320,000.00 |
| Program and fee schedule | REAP guaranteed loan, fiscal 2026 | REAP guaranteed loan, fiscal 2026 |
| Guarantee percentage | 80% | 80% |
| Guaranteed amount | $384,000.00 | $256,000.00 |
| Upfront guarantee fee rate | 1.00% | 1.00% |
| Upfront guarantee fee | $3,840.00 | $2,560.00 |
| Annual retention fee rate | 0.25% | 0.25% |
| First annual retention fee (guaranteed share of the balance after 12 payments) | $937.16 | $624.77 |
| Interest rate (illustrative, fixed) | 7.00% | 7.00% |
| Amortization, years (no balloon) | 20 | 20 |
| Monthly payment | $3,721.43 | $2,480.96 |
| Annual debt service | $44,657.22 | $29,771.48 |
| NOI needed for 1.25x coverage | $55,821.52 | $37,214.35 |
| Coverage on that 1.25x NOI if the rate were 2 points higher | 1.08x | 1.08x |
Computed in Python from the inputs shown; REAP guaranteed loan guarantee, fee and retention rates from 91 FR 11272 (FY2026); cost-share limits from the REAP rule effective 16 October 2026.
What the structures mean. Structure A uses the whole 75 percent REAP allowance as debt, so no grant is possible on this project; the owner puts in $160,000. Structure B leaves room for the maximum $160,000 grant, but the owner must fund $320,000 at construction and wait at least a year for a competitive award that may not come. A lender should underwrite B as if the grant never arrives.
Savings and payback test. For 1.25x coverage, Structure A needs $55,821.52 a year of energy savings or sales net of operating costs; Structure B needs $37,214.35. At those minimum levels, simple payback on the full $640,000 is 11.47 years for A and 17.20 years for B. Both are shorter than an illustrative 25-year useful life, which the rule requires, but B's case depends on actual savings well above its minimum. A two-point higher rate would cut either structure's coverage to 1.08x.
Evidence a Mississippi REAP study must assemble
- Twelve months of pre-installation utility bills and the load profile, from the owner's utility.
- Site evidence: proof that ground-mount sites are not Cropland under 7 CFR 718.2, or roof structural reports.
- Installer credentials: state licensing and at least three similar installations, with procurement records.
- Component origin list for panels, inverters and racking.
- Utility interconnection and tariff terms, including any net metering or buy-back rate the savings depend on.
- Production estimates reconciled later with meter data, as the rule requires for the grant.
- Ownership chart showing the highest-level owner group and any other REAP application in the fiscal year.
What a lender-grade solar feasibility study in Mississippi must prove
- Savings or revenue from the owner's own bills and tariff, not a regional average.
- System size commensurate with historical use.
- Payback within useful life under the rule's definition.
- Debt service coverage without the grant.
- Eligibility: rural area for the REAP loan, applicant tests, Cropland and foreign-component screens, no gambling income per the hub.
- Installer and equipment qualification.
- Operating costs, inverter replacement and insurance.
Risks, process and returned studies
Tariff changes are the chief risk to savings; the study tests a lower credit rate. Storms and hail require insurance. The grant is competitive and paid late, so financing must stand without it. The lender sends the REAP guaranteed loan application to the Rural Development state office that the hub places in Jackson; the applicant files any later grant in the national competition. Studies are returned for oversized systems, missing pre-installation data or payback calculated net of a grant not yet awarded.
National program examples (outside Mississippi)
Two awards are cited on the site's national renewable energy page: a $781,897 REAP grant for a 1 MW ground-mounted array at The Chef's Garden in Huron, Ohio, and a $4,275,000 REAP loan guarantee for the 3.991 MW RP Napa Solar 1 facility in California. Both were made under the earlier rules; ground-mounted or export-oriented projects of that kind may not qualify for a grant under the 2026 rule. Both appear here exactly as the national page reports them and are not this firm's work. The hub records no Mississippi solar financing.
Hiring a USDA solar feasibility study consultant in Mississippi
A REAP guaranteed loan of more than $1,000,000 to a new business requires a feasibility study by an independent, qualified consultant acceptable to the Agency (7 CFR 5001.306(a)(3)(i)); smaller loans and existing businesses are at the Agency's discretion, and the rule's own tests, payback within useful life and sizing to historical use, must be documented either way.
The cost page prices REAP studies for loans under $600,000, like both structures here, at $4,900 to $8,500 over four to five weeks, and REAP guaranteed loans over $600,000 at $7,500 to $11,500 over five to seven weeks, including debt service and utility rate modelling. Engineering design, interconnection applications and grant drafting are outside the study's scope.
A solar feasibility study consultant should ask for your last 12 months of power bills before anything else. REAP is one of several programs a USDA feasibility study consultant covers, as the homepage explains. Start on the contact page with your location, annual energy use, system concept, budget and lender; you receive a fixed-fee scope in writing.
Last updated 2026-11-08