New Hampshire's rural businesses and farms took 94 REAP grants and no REAP guaranteed loans in FY2024 to FY2026, according to USAspending. Those grants were made under rules that ended on 16 October 2026, when USDA's new REAP rule took effect. Under it, a REAP grant pays at most 25 percent of a project's cost, up to $500,000 for a renewable system, and only once the system is built and has a year of operating data behind it. For a New Hampshire farm or small business planning solar, that changes the role of a feasibility study: it now mainly supports the loan that builds the system, a REAP guaranteed loan or a B&I loan, and it must show the project carries its debt without the grant, which may or may not come later.
This page explains what the state data show, the REAP rule, regional and national benchmarks, a worked loan and what USDA Rural Development will expect from the study.
Solar and renewable generation in New Hampshire: market evidence
New Hampshire: solar and other renewable power generation, supply and rural footprint
| Measure | New Hampshire | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 9 → 3 (-66.7%) | 405 → 942 |
| Per 100,000 residents (2023) | 0.2 | 0.3 |
| Average employees per establishment | 9.3 | 12.3 |
| Average annual pay per employee | $83,107 | $138,631 |
| Share of state population in non-metro counties (2025) | 36.9% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
New Hampshire: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 1 | $150,000 | 0 | $0 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 0 | $0 | 3 | $498,000 |
| FY2024 to FY2026 | 0 | $0 | 0 | $0 |
| New Hampshire had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval. |
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
Why the Census count is not the REAP market. The Census category counts businesses whose business is generating electricity from solar, biomass and other renewable sources: power producers, not the farms, stores and manufacturers that put solar on their own roofs. New Hampshire had nine such businesses in 2019 and three in 2023, with 28 employees, while the national count more than doubled. Average pay of $83,107 is 40.1 percent below the national $138,631, reflecting small operators rather than utility-scale developers. SBA's file shows four loans to the category in New Hampshire since FY2010, one 7(a) loan and three 504 loans, 1.75 percent of the 229 national loans. None of that measures REAP demand. The REAP market is rural small businesses and agricultural producers reducing their own energy costs, and the 94 REAP grants recorded in New Hampshire in FY2024 to FY2026 are the better indicator of activity.
Regional comparison (neighbouring states' figures)
| Measure | New Hampshire | Vermont | Maine | Massachusetts |
|---|---|---|---|---|
| Renewable generation businesses with paid staff, 2023 | 3 | 0 | 5 | 22 |
| Change since 2019 | -6 | 0 | -2 | +10 |
| SBA 7(a) loans, fiscal 2010 to 2026 | 1 | 0 | 1 | 7 |
| SBA 504 loans, fiscal 2010 to 2026 | 3 | 5 | 1 | 8 |
The three neighbouring columns are taken from each state's own pack. Across northern New England the category is tiny; Massachusetts, with 22 businesses averaging 33.0 employees, is the only neighbour with a meaningful count. For a REAP project, the relevant comparables are not these businesses but similar on-site systems at farms and businesses, whose production and savings the study must document.
National benchmarks
SBA made 138 7(a) loans to renewable generation businesses nationally in FY2020 to FY2026, averaging $478,591, and 17 504 loans averaging $638,588. Seasoned losses were high: 4 of 31 seasoned loans from FY2010 to FY2016, 12.9 percent, were written off, typically a little over four years in, though 31 loans is a small sample. A lender will read that as a reason to require realistic production estimates and conservative energy prices.
The REAP rule effective 16 October 2026
The rule appeared in the Federal Register as a final rule with comment period at 91 FR 62600 on 1 October 2026 and took effect on 16 October; it followed USDA's April 2026 withdrawal of the funding notice covering FY2025 to FY2027. These are the terms a New Hampshire solar sponsor now plans around:
| Topic | Rule effective 16 October 2026 | What the study must address |
|---|---|---|
| Timing | Project period must end 12 to 24 months before the grant application (12 to 36 months in the first window) | The study supports the construction loan, not the grant |
| Data | 12 months of actual production or savings and 12 months of pre-installation data | Production estimates reconciled with meter data |
| Grant size | Minimum $1,500; maximum $500,000 for renewable systems, $250,000 for efficiency | Grants cover a small share of large projects |
| Cost share | Grant at most 25 percent of project cost | Owner and lender fund at least 75 percent |
| Combined REAP funding | Grant plus guaranteed loan at most 75 percent of project cost | Caps the loan when a grant is planned |
| Cropland | Ground-mount solar on cropland ineligible | Site screening first |
| Foreign components | Systems with components from a foreign adversary ineligible, except projects installed before publication | Country-of-origin list for every component |
| Sizing | Ground-mount systems must show commensurate historical energy use; storage limited to 120 percent of prior annual use | Load analysis from utility bills |
| Payback | Simple payback must not exceed useful life | Payback calculated as an eligibility test |
| Locations | One location per application | One site per application |
| Exclusions | EV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projects | Scope these out |
| Applicant | One application per federal fiscal year per highest-level owner; site owned or leased 12 months before the project period | Ownership and site-control evidence |
| Installers | Licensed in the state with at least three similar installations; procurement under 2 CFR 200.318 to 200.327 | Installer qualifications |
| Competition | No state competitions: one competition for requests of $20,000 or less and one national competition for others | Scoring factors in the notice |
Two consequences matter most. The grant no longer finances construction, so the REAP guaranteed loan under 7 CFR 5001, or B&I, carries the up-front cost. And because the grant is competitive and paid later, a lender should underwrite without it. The Federal Register carried no funding notice under the new rule as of 7 November 2026, so application windows are not yet known.
The evidence a REAP solar study must build
- Load history. Twelve months or more of utility bills, and interval data where available, to show energy use commensurate with the system.
- Production estimate. Modelled output for the site, orientation and shading, then reconciled with meter data after 12 months.
- Energy value. Avoided cost and any export compensation under the utility's current tariffs, with a lower-price case.
- Site screening. Roof condition or ground-mount site, with the cropland test and site control for at least 12 months before the project period.
- Component origin. A list of every major component and its country of origin.
- Installer qualifications. State licensing and at least three similar installations, with procurement documented.
Rural footprint and eligibility in New Hampshire
The pack has no county data for renewable generation businesses. Both REAP and B&I need a rural site, meaning one beyond the limits of any community above 50,000 people and beyond the urbanized area that grows out of it. In New Hampshire that excludes Manchester (116,818) and Nashua (92,435) and their urbanized fringe; Concord (44,597) is below the threshold. Agricultural producers may have different location rules under REAP, which the study should confirm against the rule. Non-metro counties hold 36.9 percent of residents, but the parcel decides. The New Hampshire state page lists the places near the line.
Program fit for a New Hampshire solar project
The REAP guaranteed loan, under 7 CFR 5001, is the natural construction lender for an eligible farm or rural small business, with a fiscal 2026 guarantee of 80 percent, a 1.0 percent fee and 0.25 percent annual retention (91 FR 11272). B&I can finance renewable systems as part of a larger business project, or for a renewable energy business, with an 85 percent guarantee under $5 million and a 3.0 percent fee. SBA 504 has been used for renewable projects in New Hampshire (three loans in FY2020 to FY2023) and in Vermont (five). The REAP grant, if awarded later, can reimburse up to 25 percent of cost. Community Facilities can fund renewable systems on public or non-profit essential facilities. Ineligible items under REAP, such as EV chargers and stand-alone storage, must be financed separately.
Financing benchmarks: REAP and B&I terms
| Term | REAP guaranteed loan, fiscal 2026 | B&I, fiscal 2026 | Source |
|---|---|---|---|
| Guarantee | 80% | 85% under $5 million; 80% from $5 million to $25 million | 91 FR 11272 |
| Upfront guarantee fee | 1.0% of guaranteed amount | 3.0% of guaranteed amount | 91 FR 11272 |
| Annual retention fee | 0.25% of guaranteed principal outstanding | 0.55% of guaranteed principal outstanding | 91 FR 11272 |
| Guarantee issued before construction is complete | additional 0.50% | additional 0.50% | 91 FR 11272 |
| Combined REAP grant and guaranteed loan | at most 75% of project cost | not applicable | REAP rule, 91 FR 62600 |
| Term | useful life, 40 years at most, no balloon | same | 7 CFR 5001.402 |
| Rate | negotiated, fixed or variable | same | 7 CFR 5001.401 |
| Equity, new business | 20% balance sheet or 25% of project cost (B&I tests in 5001.105(d)) | same | 7 CFR 5001.105(d)(4) |
| Independent feasibility study | required for a new business above $1,000,000 | same | 7 CFR 5001.306(a)(3)(i) |
What it means in New Hampshire. The 94 REAP grants and zero REAP loans recorded for FY2024 to FY2026 show that New Hampshire projects have relied on grants. Under the new rule that model reverses: the loan, or the owner's cash, builds the system and the grant comes later, if at all. Lenders here have little REAP loan history to draw on, so the study's production and energy-value analysis carries most of the weight.
Worked example (illustrative)
The illustrative project costs $640,000, sized so that a 75 percent loan, $480,000, is close to the national average SBA 7(a) loan to renewable generation businesses ($478,591). The rate is an illustrative 7.25 percent fixed (5001.401) over 15 years (5001.402).
| Item | Structure A: REAP loan only | Structure B: REAP loan plus later grant | Basis |
|---|---|---|---|
| Total project cost | $640,000.00 | $640,000.00 | Illustrative |
| REAP guaranteed loan | $480,000.00 | $320,000.00 | Loan plus grant at most 75% of cost |
| REAP grant, applied for 12 to 24 months after completion | $0.00 (no room under the 75% cap) | $160,000.00 | At most 25% of cost and $500,000 |
| Owner cash at construction | $160,000.00 | $320,000.00 | Owner bridges the future grant in B |
| Owner cash net of grant, if awarded | $160,000.00 | $160,000.00 | Grant is competitive, not assured |
| Guaranteed amount (80%) | $384,000.00 | $256,000.00 | 91 FR 11272 |
| Upfront guarantee fee (1.0%) | $3,840.00 | $2,560.00 | 91 FR 11272 |
| Fee if guarantee issues before completion (1.5%) | $5,760.00 | $3,840.00 | 91 FR 11272 |
| First annual retention fee (0.25%) | $923.23 | $615.49 | Balance after 12 payments x 80% x 0.25% |
| Monthly payment | $4,381.74 | $2,921.16 | 7.25%, 15 years |
| Annual debt service | $52,580.90 | $35,053.93 | |
| Annual energy value for 1.25x coverage | $65,726.13 | $43,817.42 | Savings plus export value, net of operating cost |
| Simple payback at that energy value | 9.74 years | 14.61 years | Project cost divided by annual energy value |
| Coverage at that value if the rate is 2 points higher | 1.11x | 1.11x | |
| Coverage at that value over 10 years | 0.97x | 0.97x |
| Same $480,000 loan as a B&I guarantee | Value |
|---|---|
| Guarantee (85%) and guaranteed amount | $408,000.00 |
| Unguaranteed amount | $72,000.00 |
| Upfront fee (3.0%), or 3.5% if issued before completion | $12,240.00, or $14,280.00 |
| First annual retention fee (0.55%) | $2,158.06 |
| Annual debt service and 1.25x energy value | $52,580.90 and $65,726.13 |
| New business equity, 25% of cost, or 20% balance sheet route | $160,000.00, or $120,000.00 |
| Existing business equity, 10% of project cost | $53,333.33 on a $533,333.33 project |
Reading the example. Structure A borrows the full 75 percent and leaves no room for a grant. Structure B borrows less, plans a $160,000 grant, and asks the owner to fund $320,000 at construction, falling to $160,000 only if the grant is awarded. A lender should underwrite B on its debt service alone. Both require an energy value well above debt service, and payback within the system's useful life is now an eligibility test for the grant. The B&I version costs more in fees, $12,240.00 against $3,840.00 upfront, but may suit a larger business project. A 10-year term drops coverage below 1.0, so the term should match the system's useful life. The project cost and energy values are illustrative.
What a lender-grade solar feasibility study in New Hampshire must prove
- Twelve months or more of energy use, showing a system commensurate with the load.
- A production estimate and energy value with a lower-price case.
- Coverage without the REAP grant, and the owner's ability to bridge it.
- Site eligibility: rural location, site control for 12 months before the project period, and the cropland test for ground mounts.
- Component origin and installer qualifications under the 2026 rule.
- Simple payback within useful life.
- Exclusion of ineligible items such as EV chargers and stand-alone storage.
Risks and mitigants
Production shortfall is the main risk; conservative modelling and a production guarantee or warranty mitigate it. Energy price and tariff changes affect value; the study should show coverage at a lower avoided cost. Snow and roof condition matter in New Hampshire winters, so roof assessment and snow losses belong in the model. Grant risk is now structural: the study must assume the grant may not arrive. Equipment failure and inverter replacement need a reserve.
Process and documents
Lenders file REAP guaranteed loan and B&I applications with Rural Development's office for New Hampshire, with the study attached. The applicant provides utility bills, the site plan and roof or ground assessment, the installer's quote and qualifications, component origin, financial statements and owner guarantees. Expect questions back if production is overstated, energy use does not support the system size, ineligible items are included, or the grant is counted as construction funding.
Program example
National program examples (outside New Hampshire, awarded under earlier rules): two awards cited on the site's national renewable page, a $781,897 REAP grant toward a 1 MW ground-mounted array at The Chef's Garden in Huron, Ohio, and a $4,275,000 REAP loan guarantee behind the 3.991 MW RP Napa Solar 1 project in California. Under the 2026 rule, projects shaped like these, ground-mounted or built mainly to export power, might not win a grant today. The site's illustrative REAP rooftop solar case study in Pennsylvania is linked below.
Hiring a USDA solar feasibility study consultant in New Hampshire
The study rule in 5001.306(a)(3)(i) covers REAP guaranteed loans as well as B&I: a new business borrowing above $1,000,000 must file an independent analysis by a qualified author USDA accepts, to USDA's scope. Smaller loans fall under 5001.306(a)(3)(ii), and the REAP rule sets its own technical and financial evidence requirements for the grant. A USDA feasibility study consultant for solar should model production and energy value independently of the installer, and understand the 2026 REAP rule.
REAP work has its own lines on the cost page: $4,900 to $8,500 and four to five weeks where the loan is below $600,000, and $7,500 to $11,500 and five to seven weeks for a REAP guaranteed loan above it, with full financial projections, debt service coverage, and interconnection and utility rate modelling for larger projects. Fees are fixed in the proposal. The site also offers a REAP grant calculator and a REAP study page for applicants. Sponsors should gather utility bills, the installer quote and site information before kickoff.
Request a REAP or solar study proposal on the contact page. Pick REAP as the program and add the town, cost range and lender status; the page says a senior analyst answers within one business day.