Wood products are one of the most rural industries in New Hampshire. Of the state's 109 wood product manufacturers with paid staff in 2023, 73, or 67.0 percent, were in non-metro counties, and the state's density of 7.8 plants per 100,000 residents is 1.88 times the national figure. The count held steady from 2019 to 2023 while the industry shrank 2.3 percent nationally. A USDA feasibility study for a New Hampshire sawmill, pallet plant, millwork shop or engineered wood producer has to show log or lumber supply at a sustainable price, buyers for every product stream including residuals, equipment economics that justify the term, and a workforce in counties where the mill is often a leading employer.
What follows covers the state's wood plants by county, their SBA history, B&I terms, two worked loans, and what USDA Rural Development will expect a lender-grade study to establish.
Wood products in New Hampshire: market evidence
New Hampshire: wood product manufacturing, supply and rural footprint
| Measure | New Hampshire | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 108 → 109 (+0.9%) | 14,223 → 13,899 |
| Per 100,000 residents (2023) | 7.8 | 4.1 |
| Average employees per establishment | 18.7 | 31.1 |
| Average annual pay per employee | $62,136 | $57,420 |
| Share of establishments in non-metro counties | 67.0% (73 in 7 counties) | |
| Share of state population in non-metro counties (2025) | 36.9% |
Non-metro counties with the most wood product manufacturing (2023): Merrimack County (17); Cheshire County (16); Grafton County (15); Sullivan County (11); Coos County (6); Carroll County (5).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Reading the wood products data. The Census category covers sawmills, planing and treating, veneer and engineered wood, millwork, containers and pallets, and manufactured and prefabricated wood buildings, so the 109 plants are a mix. They are small: 18.7 employees on average against 31.1 nationally, and payroll of $1,159,495 per plant against $1,785,760. Pay per employee is $62,136, 8.2 percent above the national $57,420. A small mill paying above-average wages has thin room for error in its cost per thousand board feet, and a reviewer will ask whether the project's throughput gains justify the capital. The stable count in a shrinking national industry is a point in the state's favour, but it says nothing about whether a specific mill has secure log supply and buyers.
Wood plants by county
| County | OMB 2023 status | Wood product plants, 2023 | Residents, 2025 | Per 10,000 residents |
|---|---|---|---|---|
| Merrimack County | not metro | 17 | 158,078 | 1.08 |
| Cheshire County | not metro | 16 | 78,269 | 2.04 |
| Grafton County | not metro | 15 | 93,225 | 1.61 |
| Rockingham County | metro | 14 | 324,077 | 0.43 |
| Hillsborough County | metro | 13 | 433,415 | 0.30 |
| Sullivan County | not metro | 11 | 43,961 | 2.50 |
| Strafford County | metro | 9 | 135,043 | 0.67 |
| Coos County | not metro | 6 | 31,343 | 1.91 |
| Carroll County | not metro | 5 | 52,784 | 0.95 |
| Belknap County | not metro | 3 | 65,147 | 0.46 |
Sullivan County is the densest at 2.50 plants per 10,000 residents, followed by Cheshire (2.04), Coos (1.91) and Grafton (1.61). Merrimack has the most plants, 17, with Cheshire at 16 and Grafton at 15. In Hillsborough the density falls to 0.30. For lenders, the pattern means wood plants are usually sited where timber is close and labour markets are small, so recruitment and the plant's role in the local economy both belong in the study.
Supply, markets and the mill's economics
A wood products study begins with raw material: timber supply within the haul radius, competing mills and their consumption, stumpage and delivered log prices, and the reliability of loggers and truckers. On the market side it documents buyers for lumber grades, timbers, pallets, millwork or building components, plus outlets for chips, sawdust, bark and shavings, whose loss can turn a profitable mill into a loss-making one. Revenue is volume by product and grade times net price; costs are logs or lumber, labour, energy, saw and equipment maintenance, kiln fuel, trucking, insurance and overhead. Capital items are the site, buildings, headrig or scanning and optimising equipment, kilns, planers, material handling, mobile equipment and working capital for log and lumber inventory.
Rural footprint and B&I eligibility in New Hampshire
At 14.0 plants per 100,000 non-metro residents against 4.0 in Hillsborough, Rockingham and Strafford, wood products are 1.81 times as concentrated in the non-metro counties as the population is. All seven non-metro counties have plants: Merrimack (17), Cheshire (16), Grafton (15), Sullivan (11), Coos (6), Carroll (5) and Belknap (3).
The B&I test itself, 7 CFR 5001.3, is about the parcel: a mill is ineligible only inside a city or town above 50,000 residents or inside the urbanized area attached to one. Manchester (116,818) and Nashua (92,435) are the only New Hampshire places over the threshold, and Concord (44,597) is the only other place above 40,000. Few mills operate in those cities, so eligibility rarely blocks a wood products project; the 36 plants in the metro counties are mostly in smaller towns. Confirm the site anyway, using the place list on the New Hampshire state page.
Program fit for a New Hampshire wood products plant
B&I is a natural fit: acquisition of a mill, new lines, scanning and optimisation equipment, kilns, expansion and working capital, with guarantees up to $25 million. SBA has played a small role, 15 7(a) loans and 4 504 loans since FY2010, the most recent a single 7(a) loan of $462,500 in FY2024 to FY2026, so B&I is likely to be the larger tool for a serious capital programme. REAP can fund biomass boilers for kilns, solar or efficiency upgrades at an operating mill, though the grant is now a reimbursement after a year of operating data. Mills, as private manufacturers, sit outside Community Facilities. Under Part 5001, a lender should be ready to show that the project does not simply move jobs or capacity from another mill and that added capacity is not going into an oversupplied market.
Financing benchmarks: USDA B&I next to SBA
New Hampshire: SBA lending to wood product manufacturing
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 7 | $1.1 million | 4 | $1.1 million |
| FY2017 to FY2019 | 5 | $1.2 million | 0 | $0 |
| FY2020 to FY2023 | 2 | $1.1 million | 0 | $0 |
| FY2024 to FY2026 | 1 | $462,500 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $518,833. New Hampshire had fewer than 30 seasoned 7(a) loans for wood product manufacturing; nationally, 7.1% of 1,015 FY2010 to FY2016 loans were charged off, on average 65 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
| Term | USDA B&I, fiscal 2026 | Source |
|---|---|---|
| Guarantee, loans under $5 million | 85% | 91 FR 11272 |
| Guarantee, $5 million to $25 million | 80% | 91 FR 11272 |
| Upfront guarantee fee | 3.0% of the guaranteed amount | 91 FR 11272; 7 CFR 5001.454 |
| Annual retention fee | 0.55% of the guaranteed share of principal outstanding on December 31 | 91 FR 11272; 7 CFR 5001.455 |
| Reduced-fee loans (criteria in 5001.454) | 1.0% fee, 0.50% retention, 80% guarantee | 91 FR 11272 |
| Guarantee issued before construction is complete | additional 0.50% fee | 91 FR 11272; 7 CFR 5001.454 |
| Maximum loan per borrower | $25 million | 7 CFR 5001.406(c) |
| Term | useful life of the collateral, 40 years at most, no balloon | 7 CFR 5001.402 |
| Interest rate | negotiated, fixed or variable, no higher than the lender's similar non-guaranteed loans | 7 CFR 5001.401 |
| Equity, existing business | 10% balance sheet equity (or debt to equity of 9:1), or 10% of project cost | 7 CFR 5001.105(d)(1) |
| Equity, new business | 20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) when the guarantee issues before construction is complete | 7 CFR 5001.105(d)(3), (d)(4) |
| Independent feasibility study | required above $1,000,000 for a new business; at the Agency's discretion otherwise | 7 CFR 5001.306(a)(3) |
| SBA 7(a), for comparison | 85% guarantee up to $150,000, 75% above | 13 CFR 120.210 |
| SBA 504, for comparison | borrower injection 10%; 15% if new or single purpose; 20% if both | 13 CFR 120.910 |
What the SBA history tells a wood products lender. With 19 SBA loans in 17 years, 0.71 percent of the U.S. total for the asset, New Hampshire's record shows lenders financing wood plants occasionally and at modest size. The three 7(a) loans since FY2020 averaged $518,833, a sample too thin to anchor an example; Loan A below therefore starts from the national mean for the same years, $766,800, rounded to $770,000. The industry's national loss record is poor, 7.1 percent of 1,015 seasoned loans written off, typically five and a half years after approval, so a reviewer will look closely at raw material and market risk. Federal award data add little: USAspending, which can miss awards, shows no B&I loan of any kind in New Hampshire in the last three fiscal years.
Worked example (illustrative)
Loan A, $770,000, rounds the national average wood products 7(a) loan. Loan B, $3,500,000, is an illustrative modernisation of an existing mill: scanning, optimising and kiln capacity. Each is priced at an illustrative 7.25 percent, fixed (5001.401), and amortized over 15 years (5001.402) because saws, scanners and kilns wear out well before the mill building.
| Input or result | Loan A (national average) | Loan B (illustrative modernisation) |
|---|---|---|
| Loan amount | $770,000.00 | $3,500,000.00 |
| Guarantee percentage (fiscal 2026 tier) | 85% | 85% |
| Guaranteed amount | $654,500.00 | $2,975,000.00 |
| Unguaranteed amount (lender's own risk) | $115,500.00 | $525,000.00 |
| Upfront guarantee fee (3.0% of the guaranteed amount) | $19,635.00 | $89,250.00 |
| Upfront fee if the guarantee issues before construction is complete (3.5%) | $22,907.50 | $104,125.00 |
| First annual retention fee (0.55% of the guaranteed share of the balance after 12 payments) | $3,461.88 | $15,735.82 |
| Interest rate (illustrative, fixed) | 7.25% | 7.25% |
| Amortization (years, no balloon) | 15 | 15 |
| Monthly payment | $7,029.04 | $31,950.20 |
| Annual debt service (NOI at 1.00x) | $84,348.53 | $383,402.41 |
| NOI needed for 1.25x coverage | $105,435.66 | $479,253.01 |
| Coverage at that NOI if the rate is 2 points higher | 1.11x | 1.11x |
| Coverage at that NOI if amortization is 5 years shorter | 0.97x | 0.97x |
| New business equity, 25% of project cost (5001.105(d)(4)) | $256,666.67 | $1,166,666.67 |
| Total project cost on that basis | $1,026,666.67 | $4,666,666.67 |
| New business equity, 20% balance sheet route if this loan is the only liability | $192,500.00 | $875,000.00 |
| Existing business equity, 10% of project cost (5001.105(d)(1)) | $85,555.56 | $388,888.89 |
| Independent feasibility study | Agency discretion (5001.306(a)(3)(ii)) | required for a new business (5001.306(a)(3)(i)) |
Income per thousand board feet. If Loan B supports an illustrative 8 million board feet a year, 1.25x coverage needs $59.91 of net operating income per thousand board feet, of which $47.93 goes to debt service. Loan A at an illustrative 2.5 million board feet needs $42.17 per thousand. For a plant of the state's average size, 18.7 employees, Loan B's target equals $25,628.50 per employee, 41.3 percent of the average New Hampshire plant's payroll. Term is critical: if the lender holds Loan B to 10 years because most collateral is machinery, the same income covers debt service only 0.97 times, below break-even. A two-point rate rise at 15 years leaves 1.11x. An existing mill meeting the 10 percent of cost test puts in $388,888.89 on a $3,888,888.89 project. Volumes are illustrative.
What a lender-grade sawmill and wood products feasibility study in New Hampshire must prove
- Timber or lumber supply within the haul radius, with competing consumption and delivered price history.
- Buyers for each product and grade, with contracts or letters where they exist.
- Outlets and prices for chips, sawdust, bark and shavings, and the effect on margin if one closes.
- Throughput and recovery gains from new equipment, verified against vendor specifications.
- Labour at New Hampshire pay ($62,136 per employee on average) in counties with small labour pools.
- Working capital for log and lumber inventory through seasonal harvest patterns.
- An equipment-life schedule that supports the requested amortization under 5001.402.
- Environmental, air and fire safety permitting for kilns, boilers and dust collection.
- Evidence that the project adds net capacity or jobs rather than moving them from another location.
Risks and mitigants in New Hampshire
Raw material risk comes first: log prices and availability move with weather, harvesting conditions and competing demand, so the study should test a higher delivered log cost. Market risk follows, because lumber and pallet prices swing with construction and freight cycles. Loss of a residuals buyer can turn a mill's by-products from income into a disposal cost. Fire, dust and equipment failure are operational risks requiring insurance and maintenance budgets. Labour availability in rural counties limits shifts. Used sawmill machinery sells into a thin market, and USDA's appraisal rules (5001.203) take out going-concern value before any discount, which pushes lenders toward real estate and personal guarantees for security.
Process, documents and what gets a study returned
The study travels with the lender's B&I request to Rural Development's state office for New Hampshire. A mill operator supplies historical financial statements, production and recovery records, log supply agreements or procurement history, customer and residuals contracts, equipment quotes and installation schedule, permits held, and the owners' financial statements and guarantees. USDA's questions usually follow when they assume recovery gains without evidence, ignore residuals markets, treat lumber price peaks as normal, or request a term longer than the equipment's life.
Program example
National program example (outside New Hampshire): one of the site's published case studies follows a hardwood mill modernisation in the Pennsylvania Wilds financed with USDA support, in the $2 million to $15 million range, linked below. No New Hampshire wood products loan under B&I is documented in the inputs.
Hiring a USDA sawmill and wood products feasibility study consultant in New Hampshire
Under 5001.306(a)(3)(i), a start-up wood company borrowing above $1,000,000 on a B&I guarantee has to file a study whose author is independent, qualified and accepted by USDA, which also decides what it covers. A modernisation by an operating mill is in USDA's discretion under 5001.306(a)(3)(ii), and given the industry's national loss rate a lender will usually want one for a project like Loan B. The right USDA feasibility study consultant for a mill understands timber supply and residuals markets as well as lumber prices, and has no tie to the equipment vendor.
The site's cost page lists what is included: the five Part 5001 components, a five to ten year projection with sensitivity analysis, market area and demand drivers, competitive supply and capture modelling, comparable operator benchmarks, the management assessment, a PDF and Word report, the Excel workbook, a kickoff call and a midpoint review, one round of revisions and the written acceptance guarantee. Engineering and construction cost estimating beyond high-level benchmarking are separate. A standard B&I study is fixed at $6,900 to $12,500 and runs six to seven weeks; projects over $10 million or with limited comparable data move to the complex tier.
To scope a mill study, use the contact page. Describe the plant's location, program, cost and lender status, and a senior analyst follows up within one business day under the page's stated standard.