New Hampshire had four refrigerated warehouses with paid employees in 2023, the same four as in 2019, employing 47 people between them. SBA's loan file records no 7(a) or 504 loan to a New Hampshire refrigerated warehouse at any point from FY2010 to FY2026. For a cold storage project, that scarcity is the central fact a feasibility study has to deal with: there are almost no local comparables for rates, occupancy or operating costs, no local lending history, and a lender who will ask where the evidence for demand comes from. The answer has to be primary evidence (anchor tenants, producer volumes, distributor commitments) and regional and national benchmarks, clearly labelled.
What follows is what the state data can and cannot tell a lender, a comparison with Vermont, Maine and Massachusetts, the guarantee terms, a pair of worked loans and the primary evidence that has to fill the gap.
Cold storage in New Hampshire: market evidence
New Hampshire: refrigerated warehousing, supply and rural footprint
| Measure | New Hampshire | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 4 → 4 (+0.0%) | 1,350 → 1,367 |
| Per 100,000 residents (2023) | 0.3 | 0.4 |
| Average employees per establishment | 11.8 | 48.4 |
| Average annual pay per employee | $55,106 | $56,901 |
| Share of state population in non-metro counties (2025) | 36.9% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
What four warehouses tell a lender. Density is 0.3 per 100,000 residents against 0.4 nationally, so the state is under-supplied relative to its population on paper, but the figure rests on four businesses. They are small: 11.8 employees on average against 48.4 nationally, with combined payroll of $2,590,000, or $647,500 per warehouse against $2,753,160 nationally. Pay per employee, $55,106, is close to the national $56,901. The Census county file shows no refrigerated warehouse in any New Hampshire county, because cells with so few businesses are not published at county level, so there is no non-metro share to report. Cold storage space inside food plants, grocery distribution centres and farms is not counted here at all, which means the true competitive supply, and the main alternative for potential customers, is larger than four.
Regional comparison (neighbouring states' figures)
| Measure, 2023 | New Hampshire | Vermont | Maine | Massachusetts |
|---|---|---|---|---|
| Refrigerated warehouses with paid staff | 4 | 3 | 5 | 26 |
| Change since 2019 | 0 | 0 | -1 | -3 |
| Density per 100k residents | 0.3 | 0.5 | 0.4 | 0.4 |
| Average employees each | 11.8 | 5.0 | 8.6 | 32.2 |
| Average pay per employee | $55,106 | $37,867 | $56,605 | $72,044 |
| SBA 7(a) and 504 loans, fiscal 2010 to 2026 | 0 | 0 | 2 | 11 |
Figures for Vermont, Maine and Massachusetts are from those states' packs and are labelled as theirs. Northern New England as a whole has 12 refrigerated warehouses with paid staff, all small; Massachusetts has 26, larger on average, and the Massachusetts pack places none in its non-metro counties. A New Hampshire project of any scale would be among the larger cold stores in the three northern states, so the study cannot rely on local operating comparables and must draw on national data and on the project's own contracts.
National benchmarks
Nationally, 1,367 refrigerated warehouses average 48.4 employees, and SBA made 32 7(a) loans averaging $1,424,256 and 16 504 loans averaging $3,038,875 to the industry from FY2020 to FY2026. The seasoned loss record covers only 38 national loans from FY2010 to FY2016, of which 5.3 percent were charged off, on average 76 months after approval. Those are the benchmarks a reviewer will apply, and they are thin too.
The evidence a study must build when local comparables are missing
- Anchor customers. Letters of intent or contracts from producers, processors or distributors for pallet positions, with volumes, terms and rates.
- Product flows. Volumes of frozen and chilled product produced in or shipped through the market area, from producers and distributors interviewed directly.
- Existing cold space. A survey of public and private refrigerated space, including space inside processors and distribution centres, and its availability to third parties.
- Drive-time logistics. Distances to producers, ports, distribution centres and customers, and the freight savings the facility offers.
- Operator interviews. Rates, utilisation and costs from operators in neighbouring states and nationally, labelled by source.
- Energy and engineering. Refrigeration design, power supply and utility rates, from engineers and the utility.
Rural footprint and B&I eligibility in New Hampshire
With no county data for refrigerated warehouses, the non-metro share cannot be measured. The B&I test is the parcel test in 7 CFR 5001.3: a site in Manchester (116,818) or Nashua (92,435), or in the urbanized area contiguous to either, is ineligible, and any other site can qualify. Concord (44,597) is under the threshold. Cold storage often wants highway access near larger places, which is where the urbanized-area boundary falls, so sites near the two cities need a mapped check. New Hampshire's non-metro counties hold 36.9 percent of residents; the New Hampshire state page lists places near the line.
Program fit for New Hampshire cold storage
A refrigerated warehouse on an eligible parcel can be built, enlarged or bought with B&I money; the fiscal 2026 guarantee is 85 percent below $5 million and 80 percent from there to the $25 million cap. The site's national cold storage page notes that the USDA Food Supply Chain Guaranteed Loan Program, used for some larger cold storage projects, has been discontinued, so B&I is the guaranteed route. With no SBA history in the state, SBA 7(a) or 504 is possible but untested here; 504 would require 15 to 20 percent injection for a new business or special-purpose building. REAP can fund efficient refrigeration, controls or rooftop solar at an operating facility, but under the rule effective 16 October 2026 the grant is at most 25 percent of cost, is paid only after 12 months of data, and projects at more than one location are ineligible. Community Facilities could apply only to a facility owned by a public body or non-profit, such as a food hub. A warehouse leased entirely to one unrelated tenant may raise Part 5001's rental-property question; an operator providing storage and handling services is on firmer ground.
Financing benchmarks: USDA B&I next to SBA
The New Hampshire pack contains no SBA lending table because SBA's FOIA data record no 7(a) or 504 loans to New Hampshire refrigerated warehouses from FY2010 to FY2026. The national figures above are the reference.
| Term | USDA B&I, fiscal 2026 | Source |
|---|---|---|
| Guarantee, loans under $5 million | 85% | 91 FR 11272 |
| Guarantee, $5 million to $25 million | 80% | 91 FR 11272 |
| Upfront guarantee fee | 3.0% of the guaranteed amount | 91 FR 11272; 7 CFR 5001.454 |
| Annual retention fee | 0.55% of the guaranteed share of principal outstanding on December 31 | 91 FR 11272; 7 CFR 5001.455 |
| Reduced-fee loans (criteria in 5001.454) | 1.0% fee, 0.50% retention, 80% guarantee | 91 FR 11272 |
| Guarantee issued before construction is complete | additional 0.50% fee | 91 FR 11272; 7 CFR 5001.454 |
| Maximum loan per borrower | $25 million | 7 CFR 5001.406(c) |
| Term | useful life of the collateral, 40 years at most, no balloon | 7 CFR 5001.402 |
| Interest rate | negotiated, fixed or variable, no higher than the lender's similar non-guaranteed loans | 7 CFR 5001.401 |
| Equity, existing business | 10% balance sheet equity (or debt to equity of 9:1), or 10% of project cost | 7 CFR 5001.105(d)(1) |
| Equity, new business | 20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) when the guarantee issues before construction is complete | 7 CFR 5001.105(d)(3), (d)(4) |
| Independent feasibility study | required above $1,000,000 for a new business; at the Agency's discretion otherwise | 7 CFR 5001.306(a)(3) |
| SBA 7(a), for comparison | 85% guarantee up to $150,000, 75% above | 13 CFR 120.210 |
| SBA 504, for comparison | borrower injection 10%; 15% if new or single purpose; 20% if both | 13 CFR 120.910 |
What the absence of history means. With no SBA loans in the state for 17 years and no B&I loans of any kind recorded in New Hampshire by USAspending for FY2024 to FY2026, a cold storage application will be judged almost entirely on its own evidence. The worked example uses the national average 7(a) loan, rounded, and an illustrative larger facility above $5 million where the guarantee falls to 80 percent.
Worked example (illustrative)
Loan A, $1,420,000, rounds the national FY2020 to FY2026 average refrigerated warehousing 7(a) loan. Loan B, $5,500,000, is an illustrative regional cold store in the 80 percent tier. The illustrative pricing is 7.25 percent fixed (5001.401), repaid over 25 years (5001.402) to suit an insulated building with a long life.
| Input or result | Loan A (national average) | Loan B (illustrative regional cold store) |
|---|---|---|
| Loan amount | $1,420,000.00 | $5,500,000.00 |
| Guarantee percentage (fiscal 2026 tier) | 85% | 80% |
| Guaranteed amount | $1,207,000.00 | $4,400,000.00 |
| Unguaranteed amount (lender's own risk) | $213,000.00 | $1,100,000.00 |
| Upfront guarantee fee (3.0% of the guaranteed amount) | $36,210.00 | $132,000.00 |
| Upfront fee if the guarantee issues before construction is complete (3.5%) | $42,245.00 | $154,000.00 |
| First annual retention fee (0.55% of the guaranteed share of the balance after 12 payments) | $6,540.78 | $23,843.79 |
| Interest rate (illustrative, fixed) | 7.25% | 7.25% |
| Amortization (years, no balloon) | 25 | 25 |
| Monthly payment | $10,263.86 | $39,754.38 |
| Annual debt service (NOI at 1.00x) | $123,166.29 | $477,052.53 |
| NOI needed for 1.25x coverage | $153,957.86 | $596,315.66 |
| Coverage at that NOI if the rate is 2 points higher | 1.06x | 1.06x |
| Coverage at that NOI if amortization is 5 years shorter | 1.14x | 1.14x |
| New business equity, 25% of project cost (5001.105(d)(4)) | $473,333.33 | $1,833,333.33 |
| Total project cost on that basis | $1,893,333.33 | $7,333,333.33 |
| New business equity, 20% balance sheet route if this loan is the only liability | $355,000.00 | $1,375,000.00 |
| Existing business equity, 10% of project cost (5001.105(d)(1)) | $157,777.78 | $611,111.11 |
| Independent feasibility study | required for a new business (5001.306(a)(3)(i)) | required for a new business (5001.306(a)(3)(i)) |
Per-pallet targets. If Loan B builds 6,000 pallet positions, 1.25x coverage needs $99.39 of net operating income per position per year, or $9.74 per occupied position per month at an illustrative 85 percent utilisation; debt service alone is $79.51 per position per year. Loan A on 1,500 positions needs $102.64 per position per year, $10.06 per occupied position per month at 85 percent. Those figures are what anchor contracts must cover after power, labour and maintenance. With the rate two points higher the same income gives 1.06x, and over 20 years 1.14x. Loan B leaves $1,100,000 unguaranteed, and a new company needs $1,833,333.33 of equity on a $7,333,333.33 project under the 25 percent test. Pallet counts and utilisation are illustrative.
What a lender-grade cold storage feasibility study in New Hampshire must prove
- Anchor customers with signed or credible commitments for a large share of capacity.
- Product volumes in the market area, from producers and distributors interviewed directly.
- Why existing cold space, including space inside food businesses, does not meet the demand.
- Rates and utilisation from regional and national operators, labelled by source.
- Refrigeration design, power capacity and energy costs, with engineering support.
- Labour and operating costs for a facility of the planned size, given that New Hampshire's four warehouses average 11.8 staff.
- Safety and environmental compliance for the refrigeration system chosen.
- Parcel eligibility under 5001.3 for highway sites near Manchester or Nashua.
Risks and mitigants
Utilisation is the main risk when demand rests on a few customers; long-term contracts with creditworthy tenants, staggered expiries and a diversified customer base mitigate it. Energy cost and power reliability affect every month's margin, so the study should test higher power prices. Refrigeration failure risks product loss and liability, requiring maintenance, backup and insurance. Construction cost overruns on insulated buildings are common. An insulated cold store has few alternative buyers, and its USDA appraisal excludes going-concern value before the discount is taken (5001.203).
Process and documents
Rural Development's New Hampshire office reviews the study inside the lender's B&I application. The sponsor provides site control, engineering and refrigeration design, the construction budget, customer letters or contracts, utility commitments, financial statements and owner guarantees. Reviewers push back when demand is inferred from population, customers are unnamed, or rates come from markets with different costs.
Program example
National program example (outside New Hampshire): the site's national cold storage page cites Origo Cold Storage in Madera County, California, reported as a $35 million USDA guaranteed loan with $17 million of C-PACE financing for a 254,000 square foot temperature-controlled facility, made under the since-discontinued Food Supply Chain program. A protein-chain cold store in Arkansas, $3 million to $20 million, is the subject of a site case study linked below. Nothing comparable in New Hampshire appears in the inputs.
Hiring a USDA cold storage feasibility study consultant in New Hampshire
A new cold storage company seeking a B&I guaranteed loan over $1,000,000 must provide an independent study by a qualified consultant acceptable to USDA, scoped by the Agency (5001.306(a)(3)(i)); both worked loans cross that line. Existing operators expanding fall under 5001.306(a)(3)(ii), where the Agency may require one. With no local comparables, a USDA feasibility study consultant for cold storage has to build the case from customer interviews and contracts, and must be independent of the builder, the refrigeration contractor and the anchor tenants.
The site's cost page says that when comparable operators must be contacted directly, the timeline extends and the fee reflects the extra analyst hours, and it places projects with limited comparable data in the complex B&I tier: $10,500 to $14,500 over seven to nine weeks. Loans over $10 million also fall in that tier. Engineering and construction cost estimates beyond high-level benchmarks are separate engagements. Sponsors should have customer letters, product volumes and the refrigeration design ready at kickoff.
Ask for a cold storage study proposal on the contact page. The page promises a senior analyst's response within one business day to a request that gives the location, program, estimated cost and lender status.