USDA Feasibility Study for General and Advanced Manufacturing in Rhode Island

    NAICS 31-33

    Rhode Island has 107.9 manufacturing establishments for every 100,000 residents, 28 percent more than the national 84.5, and its 1,188 plants paid an average of $70,230 per employee in 2023. Manufacturing is the state's largest SBA borrower group after restaurants, with 343 7(a) loans since FY2010. Yet the count fell 5.8 percent between 2019 and 2023, and one in ten of the state's seasoned manufacturing 7(a) loans was charged off. A USDA manufacturing feasibility study in Rhode Island has to work in that context: an industrial base that is dense, skilled and shrinking, a lending record with above-average losses, and a Business and Industry (B&I) program that only reaches plants outside the four largest cities and their urbanized area.

    Manufacturing in Rhode Island: market evidence

    Rhode Island: manufacturing establishments (all), supply and rural footprint

    MeasureRhode IslandUnited States
    Establishments, 2019 → 20231,261 → 1,188 (-5.8%)287,626 → 284,452
    Per 100,000 residents (2023)107.984.5
    Average employees per establishment33.843.4
    Average annual pay per employee$70,230$73,202
    Share of establishments in non-metro counties0.0% (0 in 0 counties)
    Share of state population in non-metro counties (2025)0.0%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Reading the manufacturing numbers. Rhode Island lost 73 plants in four years, a 5.8 percent decline against 1.1 percent nationally, while keeping a density well above the U.S. average. Its plants are smaller, 33.8 employees against 43.4, and pay slightly less, $70,230 against $73,202, so payroll per plant is about $2,377,066 against $3,174,395 nationally. That profile describes a state of small and mid-sized shops (job shops, specialty fabricators, contract manufacturers and suppliers) more than large branch plants. For underwriting, it cuts both ways. A new or expanding plant can draw on an experienced workforce and nearby suppliers, but the decline says some product lines and customers left, and a reviewer will ask whether the borrower's market is growing or is one of those that contracted. The study needs named customers, contracts or letters of intent, and a reason the plant will win share.

    Where the plants sit

    CountyManufacturing establishments, 2023Per 100k residentsAverage employees reported
    Providence751110.728.3
    Kent17399.731.9
    Washington131100.976.1
    Bristol75150.022.6
    Newport5869.831.1

    Source: Census County Business Patterns 2023 county file (NAICS 31-33; all 1,188 placed); Vintage 2025 county population estimates.

    Two counties break the pattern. Bristol County has 150.0 plants per 100,000 residents, the densest in the state, but they are small, 22.6 reported employees on average. Washington County's 131 plants average 76.1 employees, more than twice the state figure, which means a handful of large employers there set wage and labour-availability conditions for any newcomer. A study for a Washington County site should name them as competitors for labour, not just as context.

    Demand drivers and competition

    Demand for a plant's output is its customers' demand, so the study works from the order book: contracts, purchase orders, letters of intent, customer concentration, and the end markets those customers serve. It then sizes the market for the product, identifies competing suppliers inside and outside New England, and explains the plant's advantage in cost, lead time, quality certification or proximity. For suppliers to large regional buyers, the study tests what happens if the largest customer cuts orders.

    Revenue model, costs and capital items

    Revenue is units or machine hours times price, by product and customer. Costs are materials, direct labour at Rhode Island wage rates, energy (New England power prices are high, and the study should use the utility's actual tariff), maintenance, insurance, freight and overhead. Capital items are land and building or a lease, machinery and installation, tooling, IT and quality systems, permits, and working capital for inventory and receivables, often 60 to 90 days of sales for a contract manufacturer.

    Rural footprint and B&I eligibility in Rhode Island

    The OMB July 2023 delineation counts all five Rhode Island counties as central counties of the Providence-Warwick, RI-MA metro, so no plant is in a non-metro county. Eligibility is decided at the parcel under 7 CFR 5001.3: B&I cannot finance a plant in Providence, Cranston, Warwick or Pawtucket, each over 50,000 in the Vintage 2025 estimates, or in the urbanized area contiguous to them. Industrial land in the excluded cities and their inner suburbs, where much of the 751-plant Providence County base sits, is out.

    The parcels to test are industrial sites in towns under 50,000 that lie beyond the urbanized area: candidates include North Kingstown (27,885) and the other Washington County towns where the large plants are, Burrillville (16,927), North Smithfield (12,990) and Smithfield (22,625) in northern Providence County, and Coventry (36,281) and West Greenwich (6,750) in Kent County. Several of these may sit inside or next to the urbanized area, so the lender runs the address through USDA's eligibility map before the study is commissioned. A plant that fails is an SBA 7(a), SBA 504 or conventional credit, and the same study can support it. The Rhode Island hub lists every town's population.

    Program fit

    B&I suits a plant on an eligible parcel: land, building, machinery and working capital, each over its useful life up to 40 years, with loans up to $25 million (5001.406(c)). When a B&I loan exceeds $1,000,000 and the project will create more than 50 jobs, 5001.306(a)(1) requires Department of Labor concurrence, which a large Rhode Island plant expansion could trigger. REAP can fund efficiency equipment or on-site solar at an eligible operating plant after 12 months of energy data. Community Facilities does not finance private manufacturing. 7 CFR 5001.127 bars borrowers with principals holding federal judgments, delinquent federal debt or taxes, or debarment, and any business deriving income from illegal products.

    Financing benchmarks: USDA B&I next to SBA

    Rhode Island: SBA lending to manufacturing establishments (all)

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY2016190$60.2 million37$24.5 million
    FY2017 to FY201968$18.7 million11$7.3 million
    FY2020 to FY202346$29.3 million30$24.5 million
    FY2024 to FY202639$14.2 million8$3.9 million

    Average 7(a) loan, FY2020 to FY2026: $511,676. Average 504 loan: $748,368. Of the 190 7(a) loans approved in FY2010 to FY2016 for Rhode Island manufacturing establishments (all), 10.0% were charged off (national: 6.4% of 27,078), on average 79 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    TermUSDA B&I, fiscal 2026Source
    Guarantee, loans under $5 million85%91 FR 11272
    Guarantee, $5 million to $25 million80%91 FR 11272
    Upfront guarantee fee3.0% of the guaranteed amount91 FR 11272; 7 CFR 5001.454
    Annual retention fee0.55% of the guaranteed share of principal outstanding on December 3191 FR 11272; 7 CFR 5001.455
    Reduced-fee loans (criteria in 5001.454)1.0% fee, 0.50% retention, 80% guarantee91 FR 11272
    Maximum loan per borrower$25 million7 CFR 5001.406(c)
    Termuseful life, 40 years at most, no balloon7 CFR 5001.402
    Interest ratenegotiated; variable rates adjust no more often than quarterly7 CFR 5001.401
    Equity, existing business10% balance sheet equity (or 9:1), or 10% of project cost7 CFR 5001.105(d)(1)
    Equity, new business with adequate sales contracts10% balance sheet equity (or 9:1), or 10% of project cost7 CFR 5001.105(d)(2)
    Equity, other new businesses20% balance sheet equity (or 4:1), or 25% of project cost7 CFR 5001.105(d)(4)
    Independent feasibility studyrequired above $1,000,000 to a new business7 CFR 5001.306(a)(3)(i)
    SBA 7(a), for comparison85% guarantee up to $150,000, 75% above13 CFR 120.210
    SBA 504, for comparisonborrower 10%; 15% if new or single purpose; 20% if both13 CFR 120.910

    What the record says for a Rhode Island plant. The headline is loss: 19 of 190 seasoned Rhode Island manufacturing 7(a) loans, 10.0 percent, were charged off, against 6.4 percent of 27,078 nationally, on average 79 months after approval. Rhode Island's 85 7(a) loans in FY2020 to FY2026 were 0.42 percent of the national total, above its population share, and 504 is used heavily too, 86 loans since FY2010. Average 7(a) size peaked at $637,035 in FY2020 to FY2023 and fell to $363,818 since FY2024. For B&I, the equity rule matters more for manufacturers than for most assets: a new business with sales contracts covering debt service for the loan term needs only 10 percent equity under 5001.105(d)(2), against 20 percent balance sheet equity or 25 percent of cost otherwise. Contracts are worth money twice, in the projection and in the equity requirement.

    Worked example (illustrative)

    Two loans show the range. Loan A is $510,000, the rounded Rhode Island 7(a) average of $511,676 for FY2020 to FY2026 (85 loans), on a 10-year term for machinery. Loan B is an illustrative $4,000,000 for a new plant with building, on a 20-year blended term. Both use an illustrative 7.50 percent fixed rate.

    Input or resultLoan A (Rhode Island 7(a) average, equipment)Loan B (illustrative plant with building)
    Loan amount$510,000.00$4,000,000.00
    Program and fiscal 2026 guaranteeB&I, 85%B&I, 85%
    Guaranteed amount$433,500.00$3,400,000.00
    Upfront guarantee fee$13,005.00 (3.0%)$102,000.00 (3.0%)
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$15,172.50$119,000.00
    First annual retention fee (guaranteed share of the balance after 12 payments)$2,217.81 (0.55%)$18,280.52 (0.55%)
    Interest rate (illustrative, fixed)7.50%7.50%
    Amortization, years (no balloon)1020
    Monthly payment$6,053.79$32,223.73
    Annual debt service (NOI for 1.00x)$72,645.48$386,684.73
    NOI for 1.25x coverage$90,806.85$483,355.92
    Coverage at that NOI if the rate is 2 points higher1.15x1.08x
    Coverage at that NOI on a term 5 years shorter0.74x1.09x
    New business: equity at 25% of project cost (5001.105(d)(4))$170,000.00$1,333,333.33
    Total project cost on that basis$680,000.00$5,333,333.33
    New business: 20% balance sheet route, loan as only liability$127,500.00$1,000,000.00
    Existing business: 10% of project cost (5001.105(d)(1))$56,666.67$444,444.44
    SBA 7(a) guaranteed share of the same loan (13 CFR 120.210)$382,500.00 (75%)$3,000,000.00 (75%)
    Independent feasibility studyat the Agency's discretion (5001.306(a)(3)(ii)); streamlined path at $600,000 or less (5001.306(b))required for a new business (5001.306(a)(3)(i))

    Revenue and payroll test. At an illustrative 12 percent cash-flow margin (EBITDA before debt service), Loan A needs $756,723.78 of annual sales for 1.25x coverage and Loan B needs $4,027,965.97. Loan B's debt service of $386,684.73 equals 16.3 percent of the $2,377,066 payroll of an average Rhode Island plant, which shows how much operating scale a plant loan of that size assumes. Equipment loans are sensitive to term: squeezing Loan A into five years would cut coverage to 0.74x at the same cash flow, which is why 5001.402 ties term to useful life. If Loan B's borrower is new but holds sales contracts adequate to service the debt for the loan term, equity falls from $1,333,333.33 (25 percent of cost) to 10 percent of cost under 5001.105(d)(2).

    What a lender-grade manufacturing feasibility study in Rhode Island must prove

    1. Parcel eligibility under 5001.3, or an SBA scope from the start.
    2. Customers: contracts, purchase orders or letters of intent, with concentration risk measured.
    3. End-market demand for the product and the plant's competitive advantage over named rival suppliers.
    4. Production capacity, throughput and ramp schedule, with the equipment specifications behind them.
    5. Labour: hiring plan, wage rates at Rhode Island levels ($70,230 average in 2023) and competition for skilled workers from large local employers.
    6. Energy cost from the actual utility tariff and load profile.
    7. Working capital for inventory and receivables through the ramp.
    8. Environmental permits for air, water and waste, and the construction schedule and budget.
    9. Management: who has run a plant of this kind, and the quality certifications customers require.

    Risks and mitigants

    Customer concentration is the most common failure in small manufacturing credits; the mitigants are contracts with terms matching the loan, diversification targets and a downside case without the largest customer. Rhode Island's above-average loss record argues for stress tests that run beyond year six, since losses arrived on average 79 months after approval. Energy price spikes, skilled labour shortages and supply chain delays are the other risks. Specialized machinery has thin resale value, so the collateral discount under 5001.202 and 5001.203 will be steep, and the equity plan should allow for it.

    Process and documents

    B&I applications for Rhode Island are reviewed by the Southern New England State Office of USDA Rural Development, which works from Amherst, Massachusetts. The sponsor provides the parcel and site plan, building and equipment quotes, customer contracts or letters of intent, three years of financial statements for an existing company, interim statements, the hiring plan, permits status, personal financial statements and the 20 percent owners' guarantees (5001.204). Reviewers return studies whose sales projections lack customer evidence, whose wages come from national averages, or whose working capital ignores the receivables cycle.

    Program example

    The inputs record no Rhode Island manufacturer financed through USDA, and USAspending shows no B&I loans in the state in FY2024 to FY2026, so no precedent is named. The site's supply-chain plant case study is an Alabama project, outside Rhode Island.

    Hiring a USDA manufacturing feasibility study consultant in Rhode Island

    B&I makes an independent study compulsory for a new business borrowing more than $1,000,000, prepared by a qualified consultant acceptable to the Agency, with scope set by USDA (5001.306(a)(3)(i)); for smaller loans or existing companies, USDA or the lender may still require one, as can an SBA lender (13 CFR 120.160(b)). A manufacturing feasibility study consultant should be independent of the equipment vendor, the builder and the customers. The cost page puts standard B&I engagements, for loans of $1 million to $10 million with adequate comparables, at $6,900 to $12,500 over six to seven weeks, and complex ones (over $10 million, multi-site or thin data) at $10,500 to $14,500 over seven to nine weeks. The engagement delivers the five Part 5001 components, market and customer analysis, a five to ten year projection with sensitivity tables, management and technical chapters, and a report with its Excel workbook and one revision; engineering and environmental studies are separate. The sponsor provides contracts, quotes, statements and the hiring plan. Ask any USDA feasibility study consultant to show how they will test customer concentration before you engage.

    Request a fixed-fee proposal on the contact page with the town, product, loan size, job count and lender status; the contact page commits to an answer from a senior analyst by the next business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does USDA require a feasibility study for a manufacturing plant in Rhode Island?

    For a B&I loan above $1,000,000 to a newly formed business, the answer is yes under 5001.306(a)(3)(i). Rhode Island manufacturing 7(a) loans averaged $511,676 in FY2020 to FY2026, so many equipment loans sit below the line, where USDA and the lender decide. A new plant with a building usually exceeds it.

    What does a manufacturing feasibility study consultant cost?

    Standard B&I manufacturing work is listed on the cost page at $6,900 to $12,500; complex work, such as plants above $10 million or with limited comparable data, is listed at $10,500 to $14,500. A Rhode Island job shop expansion usually sits in the standard band. The price is fixed in the proposal before work starts.

    How long does it take?

    Six to seven weeks is the cost page's schedule for a standard B&I study and seven to nine for a complex one. Plants whose customer contracts are still being negotiated take longer, because the study's revenue build depends on them, and the lender will want the signed documents before conditional commitment.

    Who can prepare it?

    A qualified, independent consultant whom USDA accepts (5001.306(a)(3)(i)), without a stake in the plant, its equipment suppliers or its customers. An equipment maker's throughput estimate or a customer's forecast is evidence for the study, not the study itself. USDA publishes no roster of approved firms, and acceptability is settled file by file in Amherst.

    How long does a manufacturing study remain valid?

    Part 5001 does not fix a validity period. The cost page works to data inside about 18 months for USDA files, and appraisals used by USDA may be no more than a year old (5001.203). Losing or gaining a major customer before closing changes the revenue build and should trigger an update.

    Can the same study serve SBA and USDA?

    Yes, if the engagement names both lenders and keeps one set of assumptions. Many Rhode Island plants sit in the excluded cities or their urbanized area and finance through SBA 7(a) or 504, which together have funded 429 Rhode Island manufacturing loans since FY2010, so a dual-use study is common.

    Why is Rhode Island's manufacturing loss rate above the national rate?

    The pack shows 19 of 190 seasoned loans charged off, 10.0 percent against 6.4 percent nationally, but not the reasons. The decline of 73 plants between 2019 and 2023 suggests some end markets shrank. A study should show that the borrower's customers are not in those markets, and stress test beyond year six.

    Can sales contracts reduce the equity a new Rhode Island plant needs?

    Yes. Under 5001.105(d)(2), a new business with sales contracts adequate to service the debt, with terms at least as long as the loan, can close with 10 percent balance sheet equity or 10 percent of project cost instead of the 20 or 25 percent other new businesses need. The study should analyse those contracts.

    Does a large plant expansion need Department of Labor sign-off?

    If the B&I loan is over $1,000,000 and the project creates more than 50 jobs, 5001.306(a)(1) requires Department of Labor concurrence. A Rhode Island plant expanding on that scale should build the review into its timeline, show the job count and wage levels in the study, and explain where the new workers will come from.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county, incorporated places and towns): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, December 11, 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USAspending.gov, prime award data by assistance listing (10.768, 10.766, 10.868), FY2024 to FY2026: https://www.usaspending.gov
    10. Site pages: /usda-feasibility-study-cost, /contact, /industrial-feasibility-study-usda

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.