Census County Business Patterns counted no refrigerated warehousing establishments in Rhode Island in 2019 and none in 2023, and SBA records no Rhode Island cold storage loans of either type since FY2010. At the national density of 0.4 per 100,000 residents, a state of 1,114,521 people would have about four or five. A USDA cold storage feasibility study in Rhode Island therefore begins with an absence: no local operators to benchmark against, no lending history, and a cold chain that, on this evidence, runs through in-house coolers at food businesses or through public warehouses in neighbouring states. That can be an opportunity or a warning, and the study's job is to show which, while finding a parcel that the Business and Industry (B&I) guarantee can reach.
Cold storage in Rhode Island: market evidence
Rhode Island: refrigerated warehousing, supply and rural footprint
| Measure | Rhode Island | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 0 (n/a) | 1,350 → 1,367 |
| Per 100,000 residents (2023) | 0.0 | 0.4 |
| Share of state population in non-metro counties (2025) | 0.0% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Reading a zero. A zero in this table means no establishment whose main activity is refrigerated warehousing for others (NAICS 493120) reported paid employees in Rhode Island. It does not mean the state has no cold storage: food processors, distributors, grocers and seafood businesses run their own coolers and freezers, and they report under their own industries. The demand base those businesses represent is real. Rhode Island had 129 food plants outside meat, 12 meat and poultry plants, 204 grocery stores and 2,068 restaurants in 2023, according to the sibling data packs and hub facts for the state. A third-party warehouse in Rhode Island would compete with in-house storage and with public warehouses in Massachusetts and Connecticut, and a reviewer will ask why customers would switch. With no local operators, the study cannot benchmark rates or occupancy inside the state; it must survey the regional warehouses that serve Rhode Island now and collect commitments from the businesses that would use the new space.
Regional comparison (neighbouring states' figures, labelled)
| Measure | Rhode Island | Massachusetts | Connecticut | United States |
|---|---|---|---|---|
| Number of establishments (2023) | 0 | 26 | 3 | 1,367 |
| Change since 2019 | n/a | -10.3% | -40.0% | +1.3% |
| Per 100k residents | 0.0 | 0.4 | 0.1 | 0.4 |
| Employees per establishment | n/a | 32.2 | 46.3 | 48.4 |
| Pay per employee | n/a | $72,044 | $76,317 | $56,901 |
| Non-metro share of establishments | n/a | 0.0% | n/a | |
| Non-metro share of population | 0.0% | 1.5% | 5.8% | |
| SBA 7(a) loans, fiscal 2020 to 2026 | 0 | 0 | 0 | 32 |
| Average 7(a) loan, fiscal 2020 to 2026 | none | none | none | $1,424,256 |
| SBA 504 loans, fiscal 2020 to 2026 | 0 | 0 | 0 |
Source: Massachusetts and Connecticut cold storage packs (Census CBP 2019 and 2023; SBA FOIA as of 30 Sep 2026), shown as those states' figures.
Massachusetts has 26 refrigerated warehouses, at the national density, with 32.2 employees each and pay of $72,044; Connecticut has three after losing two since 2019. Southern New England's public cold storage is therefore concentrated in Massachusetts and shrinking, and none of the three states recorded an SBA 7(a) or 504 cold storage loan in FY2020 to FY2026. Regional pay runs well above the national $56,901, which matters for a warehouse that runs two or three shifts.
Demand drivers, revenue and costs
Demand is the volume of chilled and frozen product moving through the region that needs third-party storage: food processors' finished goods, seafood landings and processing, meat, dairy and produce distributors, grocery and foodservice suppliers, and import or export flows. Revenue is pallet storage (per pallet per month), handling fees in and out, blast freezing, case picking, and value-added services. Costs are electricity for refrigeration, which in New England is a heavy line and must be modelled from the utility's tariff, labour on shifts, refrigeration maintenance, insurance (product liability and spoilage), property tax and racking and equipment upkeep. Capital items are land, an insulated building with dock doors, refrigeration plant, racking, blast cells, backup power, yard and trailer parking.
Rural footprint and B&I eligibility in Rhode Island
OMB's July 2023 delineation puts all five Rhode Island counties in the Providence-Warwick, RI-MA metropolitan area, so the non-metro proxy offers nothing. Under 7 CFR 5001.3, B&I excludes Providence, Cranston, Warwick and Pawtucket and their contiguous urbanized area, where most food distribution and port activity sit. A warehouse there is an SBA or conventional credit. Sites near highway interchanges in smaller towns, for example West Greenwich (6,750), Exeter (6,540), Hopkinton (8,393), Richmond (8,128), North Kingstown (27,885) or Burrillville (16,927), may pass the population test; whether a parcel is outside the urbanized area is answered on USDA's eligibility map. Population by town is on the Rhode Island page.
Program fit
B&I suits a third-party warehouse on an eligible parcel, financing land, building, refrigeration and racking over useful lives up to 40 years (5001.402), and loans of $5 million to $25 million carry an 80 percent guarantee in fiscal 2026. REAP can later help an operating warehouse with efficiency upgrades or solar after 12 months of energy data; efficiency grants are capped at $250,000 and 25 percent of cost under the rule effective 16 October 2026. A cold store tied to a meat, poultry or seafood processor might fall within SPUR, which the site's national meat page reports has no rural test; whether stand-alone storage qualifies depends on the SPUR notice. Section 5001.127(a) separately screens out a borrower if any owner above 20 percent owes the federal government, has a federal court judgment outstanding, or is debarred.
Financing benchmarks: USDA B&I next to SBA
Rhode Island has no SBA cold storage loans to report, so the pack has no SBA table for the state. Nationally, SBA approved 32 refrigerated warehousing 7(a) loans in FY2020 to FY2026, averaging $1,424,256, and 16 504 loans averaging $3,038,875; of 38 seasoned 7(a) loans from FY2010 to FY2016, two (5.3 percent) were charged off.
| Term | USDA B&I, fiscal 2026 | Source |
|---|---|---|
| Guarantee, loans under $5 million | 85% | 91 FR 11272 |
| Guarantee, $5 million to $25 million | 80% | 91 FR 11272 |
| Upfront guarantee fee | 3.0% of the guaranteed amount | 91 FR 11272; 7 CFR 5001.454 |
| Annual retention fee | 0.55% of the guaranteed share of principal outstanding on December 31 | 91 FR 11272; 7 CFR 5001.455 |
| Guarantee issued before construction is complete | additional 0.50% fee | 91 FR 11272 |
| Maximum loan per borrower | $25 million | 7 CFR 5001.406(c) |
| Term | useful life, 40 years at most, no balloon | 7 CFR 5001.402 |
| Interest rate | negotiated, fixed or variable | 7 CFR 5001.401 |
| Equity, new business with storage contracts adequate for debt service | 10% balance sheet equity (or 9:1), or 10% of project cost | 7 CFR 5001.105(d)(2) |
| Equity, new business, construction with guarantee before completion | 25% balance sheet equity (or 3:1), or 25% of project cost | 7 CFR 5001.105(d)(3) |
| Equity, other new businesses | 20% balance sheet equity (or 4:1), or 25% of project cost | 7 CFR 5001.105(d)(4) |
| Independent feasibility study | required above $1,000,000 to a new business | 7 CFR 5001.306(a)(3)(i) |
| SBA 7(a), for comparison | 85% guarantee up to $150,000, 75% above | 13 CFR 120.210 |
What no history means. With no Rhode Island or Southern New England SBA loans to compare, the lender will rely on the national benchmarks and on the study. Built to the national 7(a) average, a new operator's loan would exceed $1,000,000 and trigger the independent-study requirement, and anything past $5 million drops to the 80 percent guarantee tier. Storage contracts are worth more than usual here: under 5001.105(d)(2), a new business whose sales contracts cover debt service for the loan term needs 10 percent equity instead of 20 or 25 percent.
Worked example (illustrative)
Loan A is $1,425,000, the rounded national 7(a) average of $1,424,256 for FY2020 to FY2026, used because Rhode Island has none. Loan B is an illustrative $6,000,000 plant, which crosses into the 80 percent tier. Both use an illustrative 7.50 percent fixed rate and 25-year amortization for building and refrigeration plant.
| Input or result | Loan A (national 7(a) average) | Loan B (illustrative larger plant) |
|---|---|---|
| Loan amount | $1,425,000.00 | $6,000,000.00 |
| Program and fiscal 2026 guarantee | B&I, 85% | B&I, 80% |
| Guaranteed amount | $1,211,250.00 | $4,800,000.00 |
| Upfront guarantee fee | $36,337.50 (3.0%) | $144,000.00 (3.0%) |
| Upfront fee if the guarantee issues before construction is complete (+0.50%) | $42,393.75 | $168,000.00 |
| First annual retention fee (guaranteed share of the balance after 12 payments) | $6,567.55 (0.55%) | $26,026.20 (0.55%) |
| Interest rate (illustrative, fixed) | 7.50% | 7.50% |
| Amortization, years (no balloon) | 25 | 25 |
| Monthly payment | $10,530.62 | $44,339.47 |
| Annual debt service (NOI for 1.00x) | $126,367.49 | $532,073.65 |
| NOI for 1.25x coverage | $157,959.36 | $665,092.06 |
| Coverage at that NOI if the rate is 2 points higher | 1.06x | 1.06x |
| Coverage at that NOI on a term 5 years shorter | 1.15x | 1.15x |
| New business: equity at 25% of project cost (5001.105(d)(4)) | $475,000.00 | $2,000,000.00 |
| Total project cost on that basis | $1,900,000.00 | $8,000,000.00 |
| New business: 20% balance sheet route, loan as only liability | $356,250.00 | $1,500,000.00 |
| Existing business: 10% of project cost (5001.105(d)(1)) | $158,333.33 | $666,666.67 |
| SBA 7(a) guaranteed share of the same loan (13 CFR 120.210) | $1,068,750.00 (75%) | see text |
| Independent feasibility study | required for a new business (5001.306(a)(3)(i)) | required for a new business (5001.306(a)(3)(i)) |
Per-pallet test. For Loan A, take an illustrative 3,000 pallet positions at 80 percent average occupancy: 1.25x coverage needs $5.48 of NOI per occupied pallet per month, and at an illustrative 35 percent NOI margin, $15.67 of storage and handling revenue per occupied pallet per month. For Loan B, at 12,000 positions, the figures are $5.77 and $16.50. Those revenue figures are compared with rates quoted by the regional warehouses now serving Rhode Island customers. Loan B's guarantee covers 80 percent, so the lender holds $1,200,000 unguaranteed against $213,750 on Loan A, a reason lenders scrutinize larger cold storage loans more closely. A loan of Loan B's size would also exceed common SBA 7(a) sizes, so the 7(a) comparison is shown only for Loan A.
The evidence a Rhode Island cold storage study must build
With no in-state operators to benchmark, the study must assemble:
- A survey of public refrigerated warehouses serving Rhode Island from Massachusetts and Connecticut, with rates, occupancy, services and drive times.
- Letters of intent or storage contracts from Rhode Island food processors, seafood businesses, distributors and grocers, with pallet volumes by temperature zone and season.
- An inventory of in-house cold storage at prospective customers and why they would outsource.
- Electricity cost from the utility's tariff, with a load profile for the refrigeration plant.
- Refrigerant choice and compliance: the site's national cold storage page notes that EPA's risk management program and OSHA's process safety management rule apply above 10,000 pounds of anhydrous ammonia, and that from 1 January 2026 new cold storage warehouse systems of 200 pounds or more may not use refrigerants with a global warming potential of 150 or more.
- Construction and equipment budgets from qualified contractors, with backup power.
- Labour plan for shift work at regional wage levels, which run above $70,000 per employee in both neighbouring states.
- Parcel eligibility under 5001.3.
Risks and mitigants
Occupancy is the risk: a warehouse built on hope rather than contracts sits empty. Anchor contracts with terms matching the loan, a phased build and a working capital reserve are the mitigants. Power price spikes, refrigeration failure and product loss are the operating risks, covered by backup power, maintenance contracts and insurance. Regulatory risk sits in refrigerant choice. Specialized buildings appraise below cost, so equity and collateral coverage need margin (5001.202, 5001.203).
Process and documents
The B&I file goes from the lender to USDA's Southern New England Rural Development office, whose staff in Amherst cover Rhode Island. Sponsors provide the site and zoning, building and refrigeration design, refrigerant selection, contractor bids, customer contracts or letters of intent, a power cost estimate, personal financial statements and the guarantees required of 20 percent owners (5001.204). Studies are returned when occupancy is assumed, power costs are generic, or the refrigeration system could not lawfully be installed.
National program example (outside Rhode Island)
The site's national cold storage page cites Origo Cold Storage in Madera County, California: a $35 million USDA guaranteed loan paired with $17 million of C-PACE financing for a 254,000 square foot temperature-controlled facility, made under USDA's since-discontinued Food Supply Chain program. It is reported as that page states it and is outside Rhode Island. The site's protein-chain cold storage case study is an Arkansas example.
Hiring a USDA cold storage feasibility study consultant in Rhode Island
Where a newly formed warehouse company asks for a B&I guarantee on more than $1,000,000, USDA will want a study from an independent cold storage feasibility study consultant it considers qualified, scoped by the Agency (5001.306(a)(3)(i)); smaller and existing-business loans are at the Agency's or lender's discretion, and SBA lenders may ask too (13 CFR 120.160(b)). The cost page's complex tier, $10,500 to $14,500 over seven to nine weeks, covers projects with limited comparable data, which describes a Rhode Island cold store; simpler expansions may fit the standard $6,900 to $12,500 band over six to seven weeks. The engagement covers the regional warehouse survey, customer demand and commitments, a five to ten year projection with occupancy, rate and power-cost stresses, technical and management chapters, and the report with its Excel model and one revision. Refrigeration engineering and environmental work are separate. Ask any USDA feasibility study consultant how they will price competing warehouses across the state line before you engage.
Send the project outline through the contact page, with the town, pallet positions, temperature zones and lender status; the page says a senior analyst replies within one business day.