USDA Feasibility Study for Solar and Renewable Energy (REAP) in Rhode Island

    NAICS 221114

    USAspending records eight REAP grants in Rhode Island in FY2024 to FY2026, worth $740,286 in total, an average of $92,535.75, and no REAP guaranteed loans. Census counts only three solar and other renewable generators with paid employees in the state in 2023, and SBA has guaranteed one Rhode Island solar loan since FY2010. That is the whole local record a lender can see. A USDA solar feasibility study in Rhode Island now also has to work under the REAP rule that took effect on 16 October 2026, which moved the grant to after the project is built and operating, capped it at 25 percent of cost, and made the REAP guaranteed loan the tool that pays for construction. In a state where every county is metropolitan, the study must also settle whether the applicant and site meet REAP's eligibility rules before any energy modelling begins.

    Solar in Rhode Island: market evidence

    Rhode Island: solar and other renewable power generation, supply and rural footprint

    MeasureRhode IslandUnited States
    Establishments, 2019 → 20230 → 3 (n/a)405 → 942
    Per 100,000 residents (2023)0.30.3
    Share of state population in non-metro counties (2025)0.0%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    What three generators and eight grants tell a lender. Census counts businesses whose main activity is selling power from solar or other renewable sources (NAICS 221114, 221117, 221118), and Rhode Island had none with paid staff in 2019 and three in 2023, with employment suppressed. The figure says nothing about rooftop and behind-the-meter systems at farms and businesses, which are what REAP mostly funds, and those are the projects this page addresses. The useful local evidence is the REAP record: eight grants in three fiscal years, averaging $92,535.75, show that Rhode Island applicants have been funded at a modest scale, while the absence of REAP guaranteed loans means no Rhode Island lender has a REAP loan file to learn from. Under the new rule the guaranteed loan is the construction financing, so the study has to carry a lender who has not done one before.

    Regional comparison (neighbouring states' figures, labelled)

    MeasureRhode IslandMassachusettsConnecticutUnited States
    Number of establishments (2023)3229942
    Change since 2019n/a+83.3%+50.0%+132.6%
    Per 100k residents0.30.30.20.3
    Employees per establishmentsuppressed33.025.812.3
    Pay per employeen/a$164,497$162,957$138,631
    Non-metro share of population0.0%1.5%5.8%
    REAP grants, fiscal 2024 to 2026 (USAspending)8674
    SBA 7(a) loans, fiscal 2020 to 2026152138
    Average 7(a) loan, fiscal 2020 to 2026$700,000$217,000$1,458,500$478,591
    SBA 504 loans, fiscal 2020 to 2026020

    Source: Massachusetts and Connecticut solar packs (Census CBP 2019 and 2023; SBA FOIA as of 30 Sep 2026) and USAspending REAP counts in this project, shown as those states' figures.

    Massachusetts received 67 REAP grants in the same three years against Rhode Island's 8 and Connecticut's 4, so the Southern New England office has processed REAP applications at volume, mostly from Massachusetts. Per resident, Rhode Island's eight grants are close to Massachusetts' rate and well above Connecticut's. SBA solar lending is minimal across all three states.

    What the REAP rule effective 16 October 2026 changes

    TopicRule effective 16 October 2026Effect on a Rhode Island study
    TimingProject Period must end 12 to 24 months before the application (12 to 36 months in the first window)The study usually supports the guaranteed loan that builds the system
    Data12 months of actual production or savings and 12 months of pre-installation dataProduction estimates are reconciled with meter data
    Award size$1,500 minimum; $500,000 maximum for renewable systems, $250,000 for efficiencyGrants cover a small share of large systems
    Cost shareGrant at most 25% of costOwner funds at least 75%
    Combined REAP fundingGrant plus guaranteed loan at most 75% of costCaps the loan when a grant is planned
    CroplandGround-mount solar on Cropland (7 CFR 718.2) ineligibleSite screening comes first
    Foreign componentsSystems with any component from a foreign adversary under 15 CFR 791.4 ineligible, except those installed before publicationCountry-of-origin list for every component
    SizingGround-mount systems must match historical energy use; storage capped at 120% of prior annual useLoad analysis is mandatory
    EconomicsSimple payback must not exceed useful lifePayback is an eligibility test
    ExclusionsEV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projectsScope these out
    ApplicantOne application per federal fiscal year per highest-level owner; site owned or leased at least 12 months before the Project PeriodOwnership and site control evidence
    InstallersLicensed in the state, at least three similar installations; procurement under 2 CFR 200.318 to 200.327Installer qualifications
    CompetitionNo state competitions: one for requests of $20,000 or less, one national for the restScoring drives the case

    Source: FACTS_REAP_RULE.md, from 91 FR 62600 (1 Oct 2026). As of 7 November 2026 no new REAP funding notice under the rule had appeared in the Federal Register.

    Rural footprint and REAP eligibility in Rhode Island

    OMB's metro list leaves no part of Rhode Island outside a metropolitan county, which makes the county proxy useless for REAP siting. REAP guaranteed loans run under 7 CFR 5001, and for a rural small business the site must be in a rural area: outside Providence, Cranston, Warwick, Pawtucket and their contiguous urbanized area under 7 CFR 5001.3. Agricultural producers are treated differently in REAP and may be eligible regardless of location, a distinction the program rules set out and the study should confirm for the applicant. For a Rhode Island business, sites in the smaller western and southern towns, such as Foster (4,628), Glocester (10,612), West Greenwich (6,750), Exeter (6,540), Richmond (8,128) or Little Compton (3,535), are the likeliest to pass; USDA's eligibility map gives the answer for each parcel. The Rhode Island state guide lists the towns, and the cropland rule means a ground-mount array on farmland is out regardless of location.

    Program fit

    REAP's guaranteed loan carries an 80 percent guarantee, a 1.0 percent upfront fee and a 0.25 percent annual retention fee in fiscal 2026 (91 FR 11272), cheaper than B&I's 3.0 and 0.55 percent. The grant, if awarded, comes after the system has run for a year, so lenders should underwrite without it. A business outside the rural area can still finance solar through SBA 7(a) or 504 or conventional loans, and Rhode Island has one SBA solar 7(a) loan on record, for $700,000 in FY2020 to FY2023. As with any Part 5001 guarantee, the lender checks that no owner above 20 percent carries the federal debts, judgments or debarment that 5001.127(a) disqualifies.

    Financing benchmarks: REAP and B&I next to SBA

    Rhode Island: SBA lending to solar and other renewable power generation

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20160$00$0
    FY2017 to FY20190$00$0
    FY2020 to FY20231$700,0000$0
    FY2024 to FY20260$00$0

    Average 7(a) loan, FY2020 to FY2026: $700,000. Rhode Island had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    TermREAP guaranteed loan, fiscal 2026B&I, fiscal 2026Source
    Guarantee80%85% under $5 million91 FR 11272
    Upfront guarantee fee1.0%3.0%91 FR 11272
    Annual retention fee0.25%0.55%91 FR 11272
    Guarantee issued before construction is completeadditional 0.50%additional 0.50%91 FR 11272
    Grant plus guaranteed loanat most 75% of project costnot applicable91 FR 62600
    Termuseful life, 40 years at most, no balloonsame7 CFR 5001.402
    Interest ratenegotiated, fixed or variablesame7 CFR 5001.401
    Independent feasibility studyrequired above $1,000,000 to a new businesssame7 CFR 5001.306(a)(3)(i)
    SBA 7(a), for comparison85% up to $150,000, 75% above13 CFR 120.210

    A short and risky national record. Nationally, 12.9 percent of 31 seasoned solar 7(a) loans were charged off, on average 51 months after approval, the highest rate in this project's asset packs, though on a small sample of mostly merchant generators rather than behind-the-meter systems. For a REAP project the lender's real questions are whether the energy savings or sales are proven by the required 12 months of meter data, and whether the payback falls inside the system's life.

    Worked example (illustrative)

    An illustrative $1,000,000 behind-the-meter rooftop or carport system for an eligible Rhode Island business: 400 kW at an illustrative installed cost of $2.50 a watt, producing an illustrative 1,150 kWh per kW, or 460,000 kWh a year. Structure A finances 70 percent with a REAP guaranteed loan and no grant. Structure B plans the maximum 25 percent grant, which caps the loan at 50 percent so that grant plus loan stays at 75 percent. Both use an illustrative 7.00 percent fixed rate and a 20-year term within the system's useful life.

    Input or resultStructure A (loan, no grant)Structure B (loan plus 25% grant)
    Total project cost$1,000,000.00$1,000,000.00
    REAP grant (at most 25% of cost and $500,000)$0.00$250,000.00
    REAP guaranteed loan$700,000.00$500,000.00
    Grant plus loan as share of cost (75% cap)70.0%75.0%
    Owner funds at closing$300,000.00$500,000.00 (grant arrives after 12 months of operation)
    Guaranteed amount (80%)$560,000.00$400,000.00
    Upfront guarantee fee (1.0%)$5,600.00$4,000.00
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$8,400.00$6,000.00
    First annual retention fee (0.25% of the guaranteed share of the balance after 12 payments)$1,366.69$976.21
    Interest rate (illustrative, fixed)7.00%7.00%
    Amortization, years (no balloon)2020
    Monthly payment$5,427.09$3,876.49
    Annual debt service (savings for 1.00x)$65,125.11$46,517.94
    Net savings or revenue for 1.25x coverage$81,406.39$58,147.42
    Coverage at that level if the rate is 2 points higher1.08x1.08x
    Coverage at that level on a 15-year term1.08x1.08x
    Debt service per kWh produced$0.1416$0.1011
    Net value per kWh needed for 1.25x$0.1770$0.1264
    SBA 7(a) guaranteed share of the same loan (13 CFR 120.210)$525,000.00 (75%)$375,000.00 (75%)
    Independent feasibility studyat the Agency's discretion (5001.306(a)(3)(ii))at the Agency's discretion; streamlined path at $600,000 or less (5001.306(b))

    Per-kWh and payback tests. Structure A needs each kWh to save or earn $0.1770 net of operating costs for 1.25x coverage; Structure B needs $0.1264, because the grant lowers the loan. If the business's avoided electricity cost were an illustrative $0.20 per kWh with $0.02 of operating cost, coverage would be 1.27x under A and 1.78x under B. The rule's payback test is separate: at $92,000 of annual savings (460,000 kWh at $0.20), simple payback is 10.9 years, inside a typical panel life, but a system with weaker savings could fail it. Structure B's catch is timing: the owner must fund $500,000 at closing, half of it bridged until the grant arrives at least a year after operation, so the study models that bridge and a case in which the grant is not awarded.

    The evidence a Rhode Island solar study must build

    1. Applicant and site eligibility: business type, the 5001.3 rural test for a rural small business, and site ownership or lease for at least 12 months before the Project Period.
    2. Twelve months of pre-installation energy data and a load analysis showing the system is sized to historical use.
    3. A production estimate reconciled, once operating, with 12 months of meter data.
    4. Avoided-cost or sales value per kWh from the utility tariff and any applicable crediting arrangements, with the source stated.
    5. A component list with country of origin, to clear the foreign-adversary rule.
    6. Installer licensing in Rhode Island and three similar installations, with procurement under 2 CFR 200.318 to 200.327.
    7. Site screening for cropland, roof condition or carport structure, and interconnection approval.
    8. Simple payback within useful life, and coverage with and without the grant.

    Risks and mitigants

    Tariff and crediting changes are the largest risk to savings; the study stresses the value per kWh. Production can fall short of modelled output, which the 12 months of meter data will reveal. Grant uncertainty is real under a national competition with no state allocation, so the lender underwrites without it. Equipment failure and roof issues are covered by warranties, a maintenance reserve and insurance. The national SBA loss record for solar generators, 12.9 percent, is a reminder that projects selling power, rather than offsetting the owner's use, carry more market risk.

    Process and documents

    REAP guaranteed loan applications for Rhode Island go through a lender to USDA Rural Development's Southern New England State Office in Amherst, Massachusetts; grant applications enter the national or small-request competitions under the rule. Sponsors provide 12 months of utility bills, the site lease or deed, system design and component list, installer qualifications and bids, interconnection status, financial statements and guarantees from 20 percent owners (5001.204). Applications fail when sizing exceeds historical use, payback exceeds useful life, a component comes from a listed foreign adversary, or the array sits on cropland.

    National program example (outside Rhode Island)

    The site's national renewable energy page cites a $781,897 REAP grant for a 1 MW ground-mounted array at The Chef's Garden in Huron, Ohio, and a $4,275,000 REAP loan guarantee for the 3.991 MW RP Napa Solar 1 facility in California. Both are outside Rhode Island and were made under the earlier rules; ground-mounted or export-oriented projects of that kind may not qualify for a grant under the 2026 rule. The site's Pennsylvania rooftop solar case study is linked below.

    Hiring a USDA solar feasibility study consultant in Rhode Island

    Because REAP loan guarantees sit inside Part 5001, the same trigger applies: a start-up borrowing over $1,000,000 must hire a qualified, independent solar feasibility study consultant the Agency accepts, and USDA defines the scope (5001.306(a)(3)(i)). Smaller loans leave the choice to USDA and the lender. The site's cost page lists REAP work at $4,900 to $8,500 over four to five weeks for loans under $600,000, and $7,500 to $11,500 over five to seven weeks for guaranteed loans above $600,000 with full projections and debt service analysis. Engineering, interconnection design and grant application drafting are separate. The study covers eligibility, load and production analysis, value per kWh, payback, a five to ten year projection with sensitivity tables and the management and technical chapters. The sponsor provides utility bills, the design, bids, component list and site documents. Because the 2026 rule changed so much, ask any USDA feasibility study consultant to show how they will apply each new eligibility test before you engage.

    Describe the system on the contact page: town, kW size, applicant type and lender status. The page says a senior analyst responds within one business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does USDA require a feasibility study for a solar project in Rhode Island?

    For a REAP or B&I guaranteed loan above $1,000,000 to a new business, yes, under 5001.306(a)(3)(i). Most Rhode Island systems are smaller: the state's eight REAP grants in FY2024 to FY2026 averaged $92,535.75. Below the line USDA or the lender decides, and the rule's payback and sizing tests require much of the same analysis anyway.

    What changed for REAP solar on 16 October 2026?

    The rule effective that day makes the grant available only after the system has operated for 12 months, caps it at 25 percent of cost and $500,000, caps grant plus guaranteed loan at 75 percent, bars ground-mount systems on cropland and components from listed foreign adversaries, and requires payback within useful life. The guaranteed loan now finances construction.

    What does a solar feasibility study consultant cost?

    The site's cost page prices REAP studies at $4,900 to $8,500 for loans under $600,000 and $7,500 to $11,500 for larger guaranteed loans needing full projections and coverage analysis. A typical Rhode Island rooftop system sits in the lower band. Grant application drafting is a separate service, and the fee is fixed in a written proposal before any work begins.

    How long does a REAP study take?

    Four to five weeks for smaller REAP scopes and five to seven for guaranteed loans over $600,000, on the cost page. The pace usually depends on getting 12 months of utility bills, the installer's design and component list with countries of origin, and interconnection status, so assemble those first; a rush option exists at a premium.

    Who can prepare it?

    Someone qualified, with no stake in the installer, the equipment supplier or the lender, whom USDA accepts (5001.306(a)(3)(i)). An installer's production estimate is an input that the study tests against the site, shading and tariff, not a substitute for it. USDA keeps no approved list of consultants and judges acceptability on each application.

    How long is a solar study valid?

    No shelf life is written into Part 5001, and the site treats USDA data as current for roughly a year and a half. Under the new rule the grant application follows 12 months of operation, so the study supporting the loan is often refreshed with actual meter data before that later grant application, which also tests the original production estimate.

    Can the same study serve SBA and USDA?

    One report can do both jobs when each lender is named in the engagement and the savings projection is the same. A Rhode Island business in Providence, Cranston, Warwick or Pawtucket fails REAP's rural test for small businesses and may finance solar through SBA or a conventional loan instead, so writing the study for either route avoids paying twice.

    Can a Rhode Island farm put a solar array on its fields?

    Not with REAP: the 2026 rule makes ground-mount solar or wind on Cropland under 7 CFR 718.2 ineligible, including retrofits of such systems. A farm can still consider rooftops, carports or non-cropland ground, sized to its historical energy use, and the study should document the land classification with the farm's records before design work is paid for.

    Should a lender count the REAP grant in underwriting?

    No. Under the rule the grant is competitive, awarded nationally and paid after a year of operation, so the lender should size the loan on savings alone. In the worked example, Structure B covers debt at 1.78x on illustrative savings without the grant, but the owner must bridge $250,000 until it arrives.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county, incorporated places and towns): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. USDA RBCS, Rural Energy for America Program final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026: https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    6. USDA RBCS, Notice of Rescission of Funding Opportunity for REAP, 91 FR 20090 (15 Apr 2026): https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm
    7. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    8. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    9. USAspending.gov, prime award data by assistance listing (10.868), FY2024 to FY2026: https://www.usaspending.gov
    10. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    11. Massachusetts and Connecticut solar data packs in this project (same Census and SBA sources), used for the regional comparison.
    12. Site pages: /renewable-energy-feasibility-study-usda, /usda-feasibility-study-cost, /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation