USAspending records eight REAP grants in Rhode Island in FY2024 to FY2026, worth $740,286 in total, an average of $92,535.75, and no REAP guaranteed loans. Census counts only three solar and other renewable generators with paid employees in the state in 2023, and SBA has guaranteed one Rhode Island solar loan since FY2010. That is the whole local record a lender can see. A USDA solar feasibility study in Rhode Island now also has to work under the REAP rule that took effect on 16 October 2026, which moved the grant to after the project is built and operating, capped it at 25 percent of cost, and made the REAP guaranteed loan the tool that pays for construction. In a state where every county is metropolitan, the study must also settle whether the applicant and site meet REAP's eligibility rules before any energy modelling begins.
Solar in Rhode Island: market evidence
Rhode Island: solar and other renewable power generation, supply and rural footprint
| Measure | Rhode Island | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 3 (n/a) | 405 → 942 |
| Per 100,000 residents (2023) | 0.3 | 0.3 |
| Share of state population in non-metro counties (2025) | 0.0% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
What three generators and eight grants tell a lender. Census counts businesses whose main activity is selling power from solar or other renewable sources (NAICS 221114, 221117, 221118), and Rhode Island had none with paid staff in 2019 and three in 2023, with employment suppressed. The figure says nothing about rooftop and behind-the-meter systems at farms and businesses, which are what REAP mostly funds, and those are the projects this page addresses. The useful local evidence is the REAP record: eight grants in three fiscal years, averaging $92,535.75, show that Rhode Island applicants have been funded at a modest scale, while the absence of REAP guaranteed loans means no Rhode Island lender has a REAP loan file to learn from. Under the new rule the guaranteed loan is the construction financing, so the study has to carry a lender who has not done one before.
Regional comparison (neighbouring states' figures, labelled)
| Measure | Rhode Island | Massachusetts | Connecticut | United States |
|---|---|---|---|---|
| Number of establishments (2023) | 3 | 22 | 9 | 942 |
| Change since 2019 | n/a | +83.3% | +50.0% | +132.6% |
| Per 100k residents | 0.3 | 0.3 | 0.2 | 0.3 |
| Employees per establishment | suppressed | 33.0 | 25.8 | 12.3 |
| Pay per employee | n/a | $164,497 | $162,957 | $138,631 |
| Non-metro share of population | 0.0% | 1.5% | 5.8% | |
| REAP grants, fiscal 2024 to 2026 (USAspending) | 8 | 67 | 4 | |
| SBA 7(a) loans, fiscal 2020 to 2026 | 1 | 5 | 2 | 138 |
| Average 7(a) loan, fiscal 2020 to 2026 | $700,000 | $217,000 | $1,458,500 | $478,591 |
| SBA 504 loans, fiscal 2020 to 2026 | 0 | 2 | 0 |
Source: Massachusetts and Connecticut solar packs (Census CBP 2019 and 2023; SBA FOIA as of 30 Sep 2026) and USAspending REAP counts in this project, shown as those states' figures.
Massachusetts received 67 REAP grants in the same three years against Rhode Island's 8 and Connecticut's 4, so the Southern New England office has processed REAP applications at volume, mostly from Massachusetts. Per resident, Rhode Island's eight grants are close to Massachusetts' rate and well above Connecticut's. SBA solar lending is minimal across all three states.
What the REAP rule effective 16 October 2026 changes
| Topic | Rule effective 16 October 2026 | Effect on a Rhode Island study |
|---|---|---|
| Timing | Project Period must end 12 to 24 months before the application (12 to 36 months in the first window) | The study usually supports the guaranteed loan that builds the system |
| Data | 12 months of actual production or savings and 12 months of pre-installation data | Production estimates are reconciled with meter data |
| Award size | $1,500 minimum; $500,000 maximum for renewable systems, $250,000 for efficiency | Grants cover a small share of large systems |
| Cost share | Grant at most 25% of cost | Owner funds at least 75% |
| Combined REAP funding | Grant plus guaranteed loan at most 75% of cost | Caps the loan when a grant is planned |
| Cropland | Ground-mount solar on Cropland (7 CFR 718.2) ineligible | Site screening comes first |
| Foreign components | Systems with any component from a foreign adversary under 15 CFR 791.4 ineligible, except those installed before publication | Country-of-origin list for every component |
| Sizing | Ground-mount systems must match historical energy use; storage capped at 120% of prior annual use | Load analysis is mandatory |
| Economics | Simple payback must not exceed useful life | Payback is an eligibility test |
| Exclusions | EV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projects | Scope these out |
| Applicant | One application per federal fiscal year per highest-level owner; site owned or leased at least 12 months before the Project Period | Ownership and site control evidence |
| Installers | Licensed in the state, at least three similar installations; procurement under 2 CFR 200.318 to 200.327 | Installer qualifications |
| Competition | No state competitions: one for requests of $20,000 or less, one national for the rest | Scoring drives the case |
Source: FACTS_REAP_RULE.md, from 91 FR 62600 (1 Oct 2026). As of 7 November 2026 no new REAP funding notice under the rule had appeared in the Federal Register.
Rural footprint and REAP eligibility in Rhode Island
OMB's metro list leaves no part of Rhode Island outside a metropolitan county, which makes the county proxy useless for REAP siting. REAP guaranteed loans run under 7 CFR 5001, and for a rural small business the site must be in a rural area: outside Providence, Cranston, Warwick, Pawtucket and their contiguous urbanized area under 7 CFR 5001.3. Agricultural producers are treated differently in REAP and may be eligible regardless of location, a distinction the program rules set out and the study should confirm for the applicant. For a Rhode Island business, sites in the smaller western and southern towns, such as Foster (4,628), Glocester (10,612), West Greenwich (6,750), Exeter (6,540), Richmond (8,128) or Little Compton (3,535), are the likeliest to pass; USDA's eligibility map gives the answer for each parcel. The Rhode Island state guide lists the towns, and the cropland rule means a ground-mount array on farmland is out regardless of location.
Program fit
REAP's guaranteed loan carries an 80 percent guarantee, a 1.0 percent upfront fee and a 0.25 percent annual retention fee in fiscal 2026 (91 FR 11272), cheaper than B&I's 3.0 and 0.55 percent. The grant, if awarded, comes after the system has run for a year, so lenders should underwrite without it. A business outside the rural area can still finance solar through SBA 7(a) or 504 or conventional loans, and Rhode Island has one SBA solar 7(a) loan on record, for $700,000 in FY2020 to FY2023. As with any Part 5001 guarantee, the lender checks that no owner above 20 percent carries the federal debts, judgments or debarment that 5001.127(a) disqualifies.
Financing benchmarks: REAP and B&I next to SBA
Rhode Island: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 0 | $0 | 0 | $0 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 1 | $700,000 | 0 | $0 |
| FY2024 to FY2026 | 0 | $0 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $700,000. Rhode Island had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
| Term | REAP guaranteed loan, fiscal 2026 | B&I, fiscal 2026 | Source |
|---|---|---|---|
| Guarantee | 80% | 85% under $5 million | 91 FR 11272 |
| Upfront guarantee fee | 1.0% | 3.0% | 91 FR 11272 |
| Annual retention fee | 0.25% | 0.55% | 91 FR 11272 |
| Guarantee issued before construction is complete | additional 0.50% | additional 0.50% | 91 FR 11272 |
| Grant plus guaranteed loan | at most 75% of project cost | not applicable | 91 FR 62600 |
| Term | useful life, 40 years at most, no balloon | same | 7 CFR 5001.402 |
| Interest rate | negotiated, fixed or variable | same | 7 CFR 5001.401 |
| Independent feasibility study | required above $1,000,000 to a new business | same | 7 CFR 5001.306(a)(3)(i) |
| SBA 7(a), for comparison | 85% up to $150,000, 75% above | 13 CFR 120.210 |
A short and risky national record. Nationally, 12.9 percent of 31 seasoned solar 7(a) loans were charged off, on average 51 months after approval, the highest rate in this project's asset packs, though on a small sample of mostly merchant generators rather than behind-the-meter systems. For a REAP project the lender's real questions are whether the energy savings or sales are proven by the required 12 months of meter data, and whether the payback falls inside the system's life.
Worked example (illustrative)
An illustrative $1,000,000 behind-the-meter rooftop or carport system for an eligible Rhode Island business: 400 kW at an illustrative installed cost of $2.50 a watt, producing an illustrative 1,150 kWh per kW, or 460,000 kWh a year. Structure A finances 70 percent with a REAP guaranteed loan and no grant. Structure B plans the maximum 25 percent grant, which caps the loan at 50 percent so that grant plus loan stays at 75 percent. Both use an illustrative 7.00 percent fixed rate and a 20-year term within the system's useful life.
| Input or result | Structure A (loan, no grant) | Structure B (loan plus 25% grant) |
|---|---|---|
| Total project cost | $1,000,000.00 | $1,000,000.00 |
| REAP grant (at most 25% of cost and $500,000) | $0.00 | $250,000.00 |
| REAP guaranteed loan | $700,000.00 | $500,000.00 |
| Grant plus loan as share of cost (75% cap) | 70.0% | 75.0% |
| Owner funds at closing | $300,000.00 | $500,000.00 (grant arrives after 12 months of operation) |
| Guaranteed amount (80%) | $560,000.00 | $400,000.00 |
| Upfront guarantee fee (1.0%) | $5,600.00 | $4,000.00 |
| Upfront fee if the guarantee issues before construction is complete (+0.50%) | $8,400.00 | $6,000.00 |
| First annual retention fee (0.25% of the guaranteed share of the balance after 12 payments) | $1,366.69 | $976.21 |
| Interest rate (illustrative, fixed) | 7.00% | 7.00% |
| Amortization, years (no balloon) | 20 | 20 |
| Monthly payment | $5,427.09 | $3,876.49 |
| Annual debt service (savings for 1.00x) | $65,125.11 | $46,517.94 |
| Net savings or revenue for 1.25x coverage | $81,406.39 | $58,147.42 |
| Coverage at that level if the rate is 2 points higher | 1.08x | 1.08x |
| Coverage at that level on a 15-year term | 1.08x | 1.08x |
| Debt service per kWh produced | $0.1416 | $0.1011 |
| Net value per kWh needed for 1.25x | $0.1770 | $0.1264 |
| SBA 7(a) guaranteed share of the same loan (13 CFR 120.210) | $525,000.00 (75%) | $375,000.00 (75%) |
| Independent feasibility study | at the Agency's discretion (5001.306(a)(3)(ii)) | at the Agency's discretion; streamlined path at $600,000 or less (5001.306(b)) |
Per-kWh and payback tests. Structure A needs each kWh to save or earn $0.1770 net of operating costs for 1.25x coverage; Structure B needs $0.1264, because the grant lowers the loan. If the business's avoided electricity cost were an illustrative $0.20 per kWh with $0.02 of operating cost, coverage would be 1.27x under A and 1.78x under B. The rule's payback test is separate: at $92,000 of annual savings (460,000 kWh at $0.20), simple payback is 10.9 years, inside a typical panel life, but a system with weaker savings could fail it. Structure B's catch is timing: the owner must fund $500,000 at closing, half of it bridged until the grant arrives at least a year after operation, so the study models that bridge and a case in which the grant is not awarded.
The evidence a Rhode Island solar study must build
- Applicant and site eligibility: business type, the 5001.3 rural test for a rural small business, and site ownership or lease for at least 12 months before the Project Period.
- Twelve months of pre-installation energy data and a load analysis showing the system is sized to historical use.
- A production estimate reconciled, once operating, with 12 months of meter data.
- Avoided-cost or sales value per kWh from the utility tariff and any applicable crediting arrangements, with the source stated.
- A component list with country of origin, to clear the foreign-adversary rule.
- Installer licensing in Rhode Island and three similar installations, with procurement under 2 CFR 200.318 to 200.327.
- Site screening for cropland, roof condition or carport structure, and interconnection approval.
- Simple payback within useful life, and coverage with and without the grant.
Risks and mitigants
Tariff and crediting changes are the largest risk to savings; the study stresses the value per kWh. Production can fall short of modelled output, which the 12 months of meter data will reveal. Grant uncertainty is real under a national competition with no state allocation, so the lender underwrites without it. Equipment failure and roof issues are covered by warranties, a maintenance reserve and insurance. The national SBA loss record for solar generators, 12.9 percent, is a reminder that projects selling power, rather than offsetting the owner's use, carry more market risk.
Process and documents
REAP guaranteed loan applications for Rhode Island go through a lender to USDA Rural Development's Southern New England State Office in Amherst, Massachusetts; grant applications enter the national or small-request competitions under the rule. Sponsors provide 12 months of utility bills, the site lease or deed, system design and component list, installer qualifications and bids, interconnection status, financial statements and guarantees from 20 percent owners (5001.204). Applications fail when sizing exceeds historical use, payback exceeds useful life, a component comes from a listed foreign adversary, or the array sits on cropland.
National program example (outside Rhode Island)
The site's national renewable energy page cites a $781,897 REAP grant for a 1 MW ground-mounted array at The Chef's Garden in Huron, Ohio, and a $4,275,000 REAP loan guarantee for the 3.991 MW RP Napa Solar 1 facility in California. Both are outside Rhode Island and were made under the earlier rules; ground-mounted or export-oriented projects of that kind may not qualify for a grant under the 2026 rule. The site's Pennsylvania rooftop solar case study is linked below.
Hiring a USDA solar feasibility study consultant in Rhode Island
Because REAP loan guarantees sit inside Part 5001, the same trigger applies: a start-up borrowing over $1,000,000 must hire a qualified, independent solar feasibility study consultant the Agency accepts, and USDA defines the scope (5001.306(a)(3)(i)). Smaller loans leave the choice to USDA and the lender. The site's cost page lists REAP work at $4,900 to $8,500 over four to five weeks for loans under $600,000, and $7,500 to $11,500 over five to seven weeks for guaranteed loans above $600,000 with full projections and debt service analysis. Engineering, interconnection design and grant application drafting are separate. The study covers eligibility, load and production analysis, value per kWh, payback, a five to ten year projection with sensitivity tables and the management and technical chapters. The sponsor provides utility bills, the design, bids, component list and site documents. Because the 2026 rule changed so much, ask any USDA feasibility study consultant to show how they will apply each new eligibility test before you engage.
Describe the system on the contact page: town, kW size, applicant type and lender status. The page says a senior analyst responds within one business day.
Last updated 2026-11-08