USDA Feasibility Study for Gas Stations and C-Stores in Vermont

    NAICS 457110

    Vermont has 385 gas stations and fuel-convenience stores, 59.4 for every 100,000 residents, nearly twice the national density of 32.4, and 71.0 percent of them sit in non-metro counties. Many are the only store in their village. For a USDA feasibility study of a Vermont fuel and convenience project, that density is evidence on both sides: low-volume village sites clearly survive here, yet nearly every new pump island will draw its gallons and its sandwich sales away from a store a few miles down the road. Labour has become the swing cost; pay per employee rose 38.2 percent between 2019 and 2023, from $22,063 to $30,491, among the steepest wage increases of any Vermont asset type covered on this site.

    Gas stations and c-stores in Vermont: market evidence

    Vermont: gas stations and fuel-convenience stores, supply and rural footprint

    MeasureVermontUnited States
    Establishments, 2019 → 2023388 → 385 (-0.8%)112,630 → 109,174
    Per 100,000 residents (2023)59.432.4
    Average employees per establishment9.29.3
    Average annual pay per employee$30,491$29,193
    Share of establishments in non-metro counties71.0% (269 in 10 counties)
    Share of state population in non-metro counties (2025)64.7%

    Non-metro counties with the most gas stations and fuel-convenience stores (2023): Rutland County (53); Washington County (49); Windsor County (34); Bennington County (26); Windham County (25); Caledonia County (21).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Reading the fuel and convenience numbers. Vermont held its station count almost steady (388 to 385, -0.8 percent) while the U.S. lost 3.1 percent, so the network has not been thinning the way it has elsewhere. Staffing is national-typical at 9.2 employees per site, and employment edged up from 3,423 to 3,537 (+3.3 percent). What changed is cost: payroll per site rose from $194,647 to $280,117, now slightly above the national $271,933, because pay per employee jumped from $22,063 to $30,491. A pro forma that uses pre-2020 wage ratios, or national c-store labour percentages, will understate the largest controllable expense by roughly a third.

    The size profile shows a mix of village stores and highway sites. Of 384 sites with a size class, 111 (28.9 percent) have fewer than five employees, 132 have five to nine, 108 have 10 to 19 and 33 have 20 to 49; none is larger. A new travel-centre format with food service and 20-plus staff would be at the very top of the Vermont range, and its study has to justify that scale from traffic counts rather than from state averages.

    Coverage by county, per 10,000 residents

    Rutland County has the densest coverage, 53 sites for 59,653 residents (8.88 per 10,000), followed by Washington (49; 8.21), Bennington (26; 7.10), Caledonia (21; 6.90) and Grand Isle (5; 6.66). Chittenden County has the most sites, 77, but the thinnest coverage of any large county at 4.55 per 10,000, with Addison (16; 4.21) and Lamoille (13; 4.94) also low. Essex County does not appear in the county file, which publishes no cell below three establishments. Low coverage in a growing area can signal room for a site; high coverage in Rutland or Washington means the study must name every competitor on the same routes.

    Regional comparison (other states' packs)

    Maine's pack shows 48.2 sites per 100,000 residents after a 9.4 percent drop (746 to 676), with pay of $30,261; New Hampshire's shows 39.3 (550 to 551) with pay of $32,589. Vermont is denser than both and, unlike Maine, has not been closing sites. Their FY2020 to FY2026 SBA 7(a) averages for the industry were $245,479 (New Hampshire) and $581,286 (Maine).

    Demand, revenue and cost structure

    Demand is traffic past the site (average daily traffic, turning movements, the share of through trips against local trips), the resident population within a few minutes' drive, and seasonal visitors, which on Vermont's ski and foliage routes can double some months. Revenue has three engines: fuel gallons times cents-per-gallon margin, inside sales times gross margin (with food service the highest-margin line), and ancillary income such as car wash, propane, lottery commissions and ATM fees. Costs are labour, card processing (charged on fuel and inside sales), utilities, insurance, environmental compliance, maintenance and property tax. The project budget covers the lot, the tank system and its piping, pumps and the canopy over them, the store and its kitchen, paving and drainage, plus the cash tied up in a fuel load and shelf stock.

    Rural footprint and B&I eligibility in Vermont

    Fuel retail leans rural: 269 of 379 placed sites (71.0 percent) are in non-metro counties, against 64.7 percent of residents, or 64.5 sites per 100,000 non-metro residents compared with 48.3 in the Chittenden, Franklin and Grand Isle metro counties. For B&I, metro status does not decide anything; 7 CFR 5001.3 excludes cities and towns above 50,000 people and urbanized areas contiguous with them, and Burlington, Vermont's largest city, counts 44,019 in the Vintage 2025 estimates. Interstate interchanges near Burlington or South Burlington are therefore not excluded for population, though USDA confirms each site. The Vermont state guide explains the rural test.

    The borrower test in 5001.127 is sharper for c-stores than for most businesses. Beyond screening the company and anyone owning 20 percent or holding control for federal judgments, delinquent federal debts or taxes and debarment, the rule disqualifies a store whose gambling activity, machine lease income included, exceeds 15 percent of yearly gross revenue. The study should state lottery commissions and any gaming machine income as a share of gross revenue, and the lender should confirm with USDA how lottery income is counted.

    Program fit

    B&I suits a new or rebuilt fuel and convenience site in rural Vermont, including land, tanks, building and equipment, and acquisitions of existing stores. SBA has carried more of the state's fuel retail lending, 30 7(a) and 7 504 loans since FY2010, though the 7(a) count fell to five in FY2020 to FY2026. REAP money can go into a store's coolers, lighting, heat pumps or a rooftop array, yet the October 2026 REAP rule shuts out retail energy dispensing and EV charging, so neither the fuel island nor a charger belongs in a REAP request. Community Facilities does not finance private fuel retail. Fuel supply agreements with a branded jobber often include incentives that act like equity, and the study should show them separately from the sponsor's cash.

    Financing benchmarks: USDA B&I next to SBA

    Vermont: SBA lending to gas stations and fuel-convenience stores

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY201620$3.2 million1$404,000
    FY2017 to FY20195$364,0002$485,000
    FY2020 to FY20233$1.8 million4$1.3 million
    FY2024 to FY20262$65,0000$0

    Average 7(a) loan, FY2020 to FY2026: $373,340. Average 504 loan: $317,750. Vermont had fewer than 30 seasoned 7(a) loans for gas stations and fuel-convenience stores; nationally, 4.0% of 4,095 FY2010 to FY2016 loans were charged off, on average 74 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    TermUSDA B&I, fiscal 2026Source
    Guarantee, loans under $5 million85%91 FR 11272
    Upfront guarantee fee3.0% of the guaranteed amount91 FR 11272; 7 CFR 5001.454
    Annual retention fee0.55% of the guaranteed share of principal outstanding on 31 December91 FR 11272; 7 CFR 5001.455
    Extra fee, guarantee before construction completion0.50%91 FR 11272
    Maximum loan per borrower$25 million7 CFR 5001.406(c)
    Termuseful life, 40 years at most, no balloon7 CFR 5001.402
    Ratenegotiated, fixed or variable7 CFR 5001.401
    Equity, existing business10% balance sheet equity (or 9:1), or 10% of project cost7 CFR 5001.105(d)(1)
    Equity, new business20% balance sheet equity (or 4:1), or 25% of project cost7 CFR 5001.105(d)(4)
    Gambling revenue limitmore than 15% of gross revenue makes the borrower ineligible7 CFR 5001.127(b)
    Independent feasibility studyrequired above $1,000,000 for a new business7 CFR 5001.306(a)(3)(i)
    Appraisalreal estate over $250,000; going concern value deducted before discounting7 CFR 5001.203
    SBA 504, for comparisonborrower injection 10%; 15% if new or single purpose; 20% if both13 CFR 120.910

    What it means for a Vermont fuel site. SBA activity has faded: 20 Vermont 7(a) loans in FY2010 to FY2016, five in FY2020 to FY2026, and the two most recent averaged $32,500, which look like working capital or equipment rather than store purchases. The three FY2020 to FY2023 loans averaged $600,567 and the four 504 loans $317,750. Nationally, the FY2020 to FY2026 7(a) average was $1,603,159, which reflects new-build travel centres; a Vermont rebuild with new tanks and a larger store lands closer to that figure than to the state average. Of the 20 Vermont 7(a) fuel loans from FY2010 to FY2016, two were charged off, a sample too small to read as a rate; the national seasoned figure is 4.0 percent with losses at 74 months. Because 5001.203 strips going concern value out of the appraisal before the lender discounts it, a fuel site's collateral often falls short of its cost, and the owner's cash and personal guarantees carry the gap.

    Worked example (illustrative)

    With just five Vermont loans to go on, Loan A uses the U.S. figure instead: $1,603,159 averaged over FY2020 to FY2026, rounded to $1,600,000. Loan B, $375,000, rounds Vermont's five-loan average of $373,340. Both use an assumed 7.50 percent fixed rate over 20 years.

    Input or resultLoan ALoan B
    Loan amount$1,600,000.00$375,000.00
    Guarantee percentage (fiscal 2026 tier)85%85%
    Guaranteed amount$1,360,000.00$318,750.00
    Upfront guarantee fee (3.0%)$40,800.00$9,562.50
    Upfront fee if issued before construction completion (3.5%)$47,600.00$11,156.25
    First annual retention fee (0.55% of the guaranteed share after 12 payments)$7,312.21$1,713.80
    Interest rate (illustrative, fixed)7.50%7.50%
    Amortization (years)2020
    Monthly payment$12,889.49$3,020.97
    Annual debt service (NOI for 1.00x)$154,673.89$36,251.69
    NOI for 1.25x coverage$193,342.37$45,314.62
    Coverage at that NOI with a rate 2 points higher1.08x1.08x
    Coverage if NOI falls 20%1.00x1.00x
    Equity, new business, 25% of project cost (5001.105(d)(4))$533,333.33$125,000.00
    Total project cost on that basis$2,133,333.33$500,000.00
    Equity, new business, 20% balance sheet route (loan as sole liability)$400,000.00$93,750.00
    Equity, existing business, 10% of project cost$177,777.78$41,666.67
    Independent study under 5001.306(a)(3)required for a new businessAgency discretion

    Per-day test. A store open every day but Christmas (364 days) needs $531.16 of net operating income a day on Loan A to reach 1.25x, and $424.93 a day to cover debt; Loan B needs $124.49 and $99.59. The study builds that daily figure from gallons times fuel margin plus inside sales times inside margin, minus daily operating costs, and checks it against traffic counts. Because fuel margin per gallon is volatile, the sensitivity case should cut fuel margin alone, not just total NOI: if fuel supplies most of the gross profit, a margin squeeze can take coverage below 1.00x even while inside sales hold.

    What a lender-grade gas station and c-store feasibility study in Vermont must prove

    1. Traffic counts for the road and turning movements into the site, with seasonal peaks on ski and foliage routes separated from year-round local traffic.
    2. Every competing fuel and convenience site on the same routes, given Vermont's 59.4 sites per 100,000 residents, with prices, hours and brand.
    3. Gallons by month and a fuel margin assumption supported by the supply agreement and local history.
    4. Inside sales and margin by category, with food service projections tied to the store's kitchen and staffing.
    5. Labour priced at current Vermont pay ($30,491 in 2023, up 38.2 percent since 2019) and a staffing plan that covers long opening hours.
    6. Environmental condition of the site, tank compliance, and the cost of tank replacement where tanks are near the end of their life.
    7. Lottery and any gaming revenue as a share of gross, tested against the 15 percent limit in 5001.127(b).
    8. Capital budget, including tanks, dispensers, canopy, building and site work, and the incentives in the fuel supply agreement.
    9. For an acquisition, three years of fuel and inside sales history reconciled with tax returns.

    Risks and mitigants in Vermont

    Fuel margin volatility is the main earnings risk; diversified inside sales and food service are the mitigants. Labour cost and availability in villages can limit hours. Contamination from aging tanks stays with the land, so the lender will want a Phase I report and the tank history, both bought separately from the study. Winter road conditions and mud season cut traffic on some routes, and a new bypass or interchange can shift volume overnight. Electric vehicle adoption is a long-term risk to gallons that the study should address with a sensitivity case rather than ignore; REAP cannot fund chargers under the 2026 rule. Act 250, Vermont's land use permit law, and town zoning can apply to new sites or major expansions.

    Process, documents and common reasons for return

    After the lender completes its credit analysis, the B&I application and study go to USDA Rural Development's Vermont state office. The sponsor provides the site plan, traffic data, fuel supply agreement, building and equipment quotes, environmental reports and tank records, three years of financial statements and tax returns for an existing store, monthly gallon and inside sales reports, and personal financial statements. Reviewers reject fuel studies that guess at gallons instead of deriving them from counts, that cost staff at pre-2020 pay, or that leave lottery and machine income out of the 15 percent calculation.

    Program example

    None. No USDA-guaranteed Vermont fuel site appears in the sources used here; the federal award file shows only a pair of B&I loans statewide in the three fiscal years to 2026.

    Hiring a USDA gas station and c-store feasibility study consultant in Vermont

    When the borrower is a newly formed company and the B&I loan exceeds $1,000,000, 5001.306(a)(3)(i) leaves no choice: USDA defines the scope and an independent consultant writes it; Loan A in the example is in that group and Loan B is not. For acquisitions by existing operators and smaller loans, the Agency and lender decide, and a lender looking at a new-build in a dense Vermont market will usually ask. A gas station feasibility study consultant needs to be independent of the fuel supplier, the seller, the contractor and the lender.

    The cost page prices a standard B&I job between $6,900 and $12,500, delivered in roughly six or seven weeks, and has a higher band for large or multi-site projects; SBA-only studies are quoted lower and faster. What you pay for is the five-part study USDA expects, the spreadsheet model, the report itself, changes requested in the lender's review, and the written acceptance commitment; Phase I environmental work, engineering and appraisals are separate contracts. Choose a USDA feasibility study consultant who will build gallons from traffic counts and price fuel margin from your supply agreement, since a Vermont reviewer will test both.

    Send the site location, format, loan size and lender status through the contact page; a senior analyst answers within one business day according to that page.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a Vermont gas station need a feasibility study for a USDA loan?

    It becomes compulsory when a start-up company's B&I loan is above $1,000,000 (5001.306(a)(3)(i)). Most new-builds qualify, since U.S. fuel-site 7(a) loans averaged $1,603,159 over FY2020 to FY2026. For an established operator buying a store, or a smaller loan, USDA decides case by case, and dense Vermont routes make a lender likely to want one.

    How much does a gas station feasibility study consultant cost in Vermont?

    The site's cost page puts a standard B&I engagement at $6,900 to $12,500 and lists separate, lower pricing for SBA-only studies, with the fee fixed in the proposal. A single store with a clear trade area usually fits the standard band. For a $1,600,000 B&I loan, the upfront guarantee fee is $40,800.00.

    How long will a c-store study take?

    Six to seven weeks is the cost page's usual delivery time for a standard B&I engagement; paying the rush premium shortens it. A Vermont fuel site study can take longer if traffic counts have to be commissioned in a peak and an off-peak month, or if tank records and environmental reports are slow to arrive.

    Who can write the study a USDA lender will accept?

    A qualified, independent consultant whom the Agency accepts, working to the Agency's scope. The fuel jobber's site survey is helpful input, but because the supplier benefits from the deal it cannot be the independent study. The lender reviews the study as part of its credit evaluation under 5001.202. Equipment and canopy vendors are excluded too.

    How long does a gas station study stay current?

    No expiry is written into Part 5001. Data older than about 18 months is generally a problem for USDA, according to the cost page, and 5001.203 requires appraisals less than a year old. Fuel margins and competitor prices move quickly, so a study older than a year should be updated before a Vermont lender submits it.

    Will one study work for both SBA and USDA?

    In most cases, as long as the report lists the SBA lender and the B&I lender as users and models each loan. Under 13 CFR 120.160(b) SBA may itself require one. Vermont fuel sites took four 504 loans averaging $317,750 in FY2020 to FY2023, so 504 is a realistic comparison for owner-occupied real estate.

    Does lottery income affect B&I eligibility for a Vermont c-store?

    It can. Under 5001.127(b), gambling that brings in more than 15 percent of a year's gross revenue, counting rent from machines, makes the borrower ineligible. The study should show lottery commissions and any gaming income as a share of gross revenue, and the lender should confirm with USDA how lottery income is treated.

    Can REAP pay for EV chargers at a Vermont fuel station?

    No. The rule in force since 16 October 2026 lists EV chargers and retail energy dispensing among REAP's excluded projects. REAP can still help with store efficiency projects such as refrigeration or a rooftop solar system, subject to the 12-month operating data requirement and the 25 percent grant cap. Fuel pumps are excluded for the same reason.

    Why are Vermont fuel wages rising so fast?

    The data show the size of the change, not its cause: pay per employee rose from $22,063 in 2019 to $30,491 in 2023, a 38.2 percent increase, while employment grew only 3.3 percent. For a pro forma, the point is that labour benchmarks from before 2020 or from national ratios understate current Vermont costs.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition, including 5001.127 (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. USDA RBCS, Rural Energy for America Program final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026: https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    8. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USAspending.gov, prime award data by assistance listing (10.768, 10.766, 10.868), FY2024 to FY2026: https://www.usaspending.gov/
    10. Site pages: /gas-station-feasibility-study-usda, /usda-feasibility-study-cost, /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours