Census counts 25 self-storage facilities in Vermont, down from 28 in 2019, or 3.9 per 100,000 residents against 5.5 nationally. That figure badly understates the real supply, because it includes only facilities with paid employees; unstaffed and owner-run storage, which is common in small towns, does not appear. What the data do show clearly is how Vermont storage gets financed: 14 SBA 504 loans since FY2010, seven of them in FY2020 to FY2026, against only two 7(a) loans in 17 years. A USDA self-storage feasibility study in Vermont must start by building the competitor count that Census cannot provide, unit by unit and drive by drive, and then show that a new facility leases up fast enough to carry its debt in a market of small towns.
Self-storage in Vermont: market evidence
Vermont: self-storage facilities, supply and rural footprint
| Measure | Vermont | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 28 → 25 (-10.7%) | 16,904 → 18,564 |
| Per 100,000 residents (2023) | 3.9 | 5.5 |
| Average employees per establishment | 2.7 | 2.6 |
| Average annual pay per employee | $43,294 | $40,550 |
| Share of establishments in non-metro counties | 43.8% (7 in 2 counties) | |
| Share of state population in non-metro counties (2025) | 64.7% |
Non-metro counties with the most self-storage facilities (2023): Windham County (4); Washington County (3).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Why 25 is not the supply. County Business Patterns covers establishments with payroll. A storage facility run by its owner, managed remotely, or operated as one of several sites under a single staffed office will often not appear as its own establishment. The decline from 28 to 25, and from 82 to 68 employees (-17.1 percent), may reflect consolidation or automation as much as closures. The staffed facilities that are counted are tiny operations, 21 of the 24 with a size class having fewer than five employees, with pay of $43,294 per employee, 6.8 percent above the national $40,550. For a pro forma, the useful benchmark is staffing per facility (2.7, close to the national 2.6), not the count.
Where the counted facilities are
The county file places 16 of the 25: nine in Chittenden County (0.53 per 10,000 residents), four in Windham (0.88 per 10,000) and three in Washington (0.50 per 10,000). The remaining nine are in counties whose staffed storage count is too small for Census to publish. Because unstaffed facilities are missing, these placements say where the larger, staffed operations are, not where storage capacity is.
Regional comparison (other states' packs)
New Hampshire's pack shows 104 staffed facilities (7.4 per 100,000 residents), up 22.4 percent from 85, with pay of $36,869 and ten 7(a) loans averaging $607,400 plus 12 504 loans averaging $1,022,500 in FY2020 to FY2026. Maine's shows 72 (5.1 per 100,000), down slightly from 74, with five 7(a) loans averaging $1,113,660 and 12 504 loans averaging $701,250. Massachusetts has 330 (4.7 per 100,000), up 17.0 percent. Vermont's staffed count is the lowest per resident of the four and the only one that fell more than slightly; New Hampshire's growth shows what a building cycle in the region looks like.
National benchmarks
Nationally, 975 SBA 7(a) self-storage loans in FY2020 to FY2026 averaged $1,441,053 and 496 504 loans averaged $1,136,224. No other asset in the Vermont packs has a lower national loss record: only 0.7 percent of 574 storage 7(a) loans approved in FY2010 to FY2016 went to charge-off, at a typical 49 months. Lenders like the asset class, which is why the feasibility question in Vermont is about local demand and lease-up rather than the business model.
Demand, revenue and costs
Demand comes from households within a short drive (typically a few miles in town, farther in rural areas), with drivers such as moves, home sizes, seasonal residents and second homes, students, and businesses storing inventory or equipment; vehicle, boat and RV storage is a separate rural segment. Revenue is occupied units by size and type (drive-up, climate-controlled, vehicle) times monthly rent, net of concessions and bad debt, plus fees, insurance or protection plans and retail. Costs are on-site or remote management, property tax, insurance, utilities (more for climate control), snow removal, marketing and software, and repairs. Capital items are land, buildings and doors, climate control where offered, paving, fencing, gate and security systems, and a lease-up reserve.
Rural footprint and B&I eligibility in Vermont
Seven of the 16 county-placed staffed facilities, or 43.8 percent, lie in non-metro counties, which hold 64.7 percent of the state's people; per 100,000 people that is 1.7 in non-metro counties and 4.0 around Burlington. Under 7 CFR 5001.3, B&I excludes municipalities above 50,000 residents and their urbanized fringe, and nothing more; Burlington, the state's biggest, had 44,019, so population never knocks a Vermont storage site out. USDA still determines the parcel. The rural test is set out on the Vermont state guide.
Borrowers are screened under 5001.127: the business and anyone with more than 20 percent or control must be clear of debarment and of unpaid federal judgments, taxes and debts; owners at 20 percent guarantee the loan (5001.204).
Program fit
A rural storage facility's land, buildings, expansion or acquisition can all be financed with B&I, which guarantees 85 percent below $5 million and lets the loan amortize over the buildings' life. Vermont owners have overwhelmingly chosen SBA 504 (14 loans since FY2010), which pairs a bank first mortgage with a debenture and suits owner-operated real estate. B&I competes with 504 when the borrower is new, when the loan is large, or when the lender wants one guarantee on the whole loan rather than a split structure. REAP can fund lighting, climate control efficiency or solar on storage roofs at an operating facility under the October 2026 rule. Community Facilities does not fund commercial storage.
| Term | USDA B&I, fiscal 2026 | SBA 504 (for comparison) | Source |
|---|---|---|---|
| Guarantee | 85% under $5 million, on the whole loan | debenture 100% SBA-guaranteed; bank first lien not guaranteed | 91 FR 11272; 13 CFR 120.801 |
| Typical structure | one guaranteed loan | 10% borrower, 50% bank, 40% CDC debenture | 13 CFR 120.900 |
| Borrower contribution | 10% for existing, 20 to 25% for new businesses | 10%; 15% if new or single purpose; 20% if both | 7 CFR 5001.105(d); 13 CFR 120.910 |
| Upfront fee | 3.0% of the guaranteed amount | 0.5% SBA fee on the debenture plus CDC fees | 91 FR 11272; 13 CFR 120.971 |
| Annual fee | 0.55% of the guaranteed balance | up to 0.9375% of the debenture balance plus CDC servicing fee | 91 FR 11272; 13 CFR 120.971 |
| Term | useful life, 40 years at most, no balloon | published debenture maturities | 7 CFR 5001.402; 13 CFR 120.933 |
| Feasibility study | required above $1,000,000 for a new business | SBA may require | 7 CFR 5001.306(a)(3)(i); 13 CFR 120.160(b) |
Financing benchmarks: USDA B&I next to SBA
Vermont: SBA lending to self-storage facilities
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 1 | $107,000 | 2 | $913,000 |
| FY2017 to FY2019 | 0 | $0 | 5 | $2.3 million |
| FY2020 to FY2023 | 0 | $0 | 5 | $1.7 million |
| FY2024 to FY2026 | 1 | $500,000 | 2 | $1.9 million |
Average 7(a) loan, FY2020 to FY2026: $500,000. Average 504 loan: $512,429. Vermont had fewer than 30 seasoned 7(a) loans for self-storage facilities; nationally, 0.7% of 574 FY2010 to FY2016 loans were charged off, on average 49 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
A 504 market. Vermont's 504 storage loans have been steady, two to five per period, and are growing: $333,400 on average in FY2020 to FY2023 and $960,000 for the two loans of FY2024 to FY2026. The 504 debenture is at most 40 percent of project cost (13 CFR 120.930), so those loans imply projects roughly two and a half times their size. The one recent 7(a) loan was $500,000. Vermont storage projects are smaller than national ones, but the most recent loans point to larger facilities, and a new-build at the national 7(a) average would cross the $1,000,000 study threshold for a new borrower.
Worked example (illustrative)
Vermont has a single 7(a) loan since FY2020, so Loan A, $1,440,000, rounds the national 7(a) self-storage average for FY2020 to FY2026 ($1,441,053). Loan B, $510,000, rounds Vermont's own 504 average ($512,429; seven loans) as a smaller expansion. Both assume 7.25 percent fixed over 25 years.
| Input or result | Loan A | Loan B |
|---|---|---|
| Loan amount | $1,440,000.00 | $510,000.00 |
| Guarantee percentage (fiscal 2026 tier) | 85% | 85% |
| Guaranteed amount | $1,224,000.00 | $433,500.00 |
| Upfront guarantee fee (3.0%) | $36,720.00 | $13,005.00 |
| Upfront fee if issued before construction completion (3.5%) | $42,840.00 | $15,172.50 |
| First annual retention fee (0.55% of the guaranteed share after 12 payments) | $6,632.91 | $2,349.15 |
| Monthly payment | $10,408.42 | $3,686.32 |
| Annual debt service (NOI for 1.00x) | $124,901.03 | $44,235.78 |
| NOI for 1.25x coverage | $156,126.28 | $55,294.73 |
| Coverage at that NOI with a rate 2 points higher | 1.06x | 1.06x |
| Coverage if NOI falls 20% | 1.00x | 1.00x |
| Equity, new business, 25% of project cost (5001.105(d)(4)) | $480,000.00 | $170,000.00 |
| Total project cost on that basis | $1,920,000.00 | $680,000.00 |
| Equity, new business, 20% balance sheet route (loan as sole liability) | $360,000.00 | $127,500.00 |
| Equity, existing business, 10% of project cost | $160,000.00 | $56,666.67 |
| Independent study under 5001.306(a)(3) | required for a new business | Agency discretion |
Per-occupied-unit test. Take an illustrative 450 units, 88 percent rented (396 units). For Loan A, each rented unit must clear $32.85 a month after management, property tax, insurance, power and plowing to reach 1.25x, and $26.28 to meet the payment. Loan B, for a 180-unit facility at the same occupancy, needs $29.09 and $23.27. Add the operating cost per unit and the result is the average rent the study must support with competitor rates. A facility still leasing up at 60 or 70 percent occupancy will fall short of those figures, which is why the lease-up reserve is part of the capital budget.
Evidence the study must build when local comparables are thin
- A full inventory of storage within the trade area, staffed and unstaffed: facility names, unit counts by size and type, climate control, rates and occupancy, gathered by site visits, calls and online rate checks, because Census misses unstaffed sites.
- Square feet of storage per resident in the trade area, calculated from that inventory and compared with the regional packs.
- Households, housing turnover, second homes and businesses within the drive radius.
- Rural vehicle, boat and RV storage demand, which can be a large share in Vermont's lake and ski areas.
- Planned or permitted competing facilities.
- A lease-up schedule by unit type, supported by the experience of comparable facilities, with concessions.
- Property tax and snow removal costs, which weigh more on Vermont storage than national ratios suggest.
- Zoning and site approvals, stormwater and, for larger sites, any Act 250 permit.
Risks and mitigants
New supply is the main risk: one competitor opening nearby can stall lease-up, so the study tests a slower absorption case. Small trade areas cap the size a facility can fill. Rent levels in rural Vermont may be lower than regional averages, and climate-controlled premiums may not hold. Snow loads and removal costs affect buildings and operations. The national 0.7 percent loss rate suggests the asset is forgiving once stabilised; the risk is concentrated in lease-up, which a reserve covers. Storage buildings have some alternative use, which helps collateral under 5001.203 appraisals.
Process and documents
The lender files the B&I application and study with USDA Rural Development in Vermont after its own underwriting. The sponsor supplies the site plan and unit mix, building quotes and the construction budget, zoning approvals, rent roll and occupancy history for an existing facility, management plan, statements, resumes and personal financial statements. Reviewers return studies that use the Census count as the competitor list, assume regional rents without local checks, or project stabilised occupancy in year one.
Program example
None. The inputs name no Vermont storage facility financed through USDA.
Hiring a USDA self-storage feasibility study consultant in Vermont
A storage company formed for the project and borrowing above $1,000,000 under B&I must supply an outside study scoped by USDA (5001.306(a)(3)(i)); Loan A falls there and Loan B does not. Smaller loans and existing operators are left to USDA and the lender. The self-storage feasibility study consultant cannot be the building kit supplier, the seller, the future manager or the bank.
Self-storage sits on the cost page's list of classes with plentiful comparables nationally; in Vermont, where unstaffed sites dominate, that advantage disappears and the survey is manual. Standard B&I pricing is $6,900 to $12,500 with roughly a six or seven-week turnaround; SBA studies are listed lower and faster; a rush is available at extra cost. Included in the flat price: each component USDA reviews, a projection from lease-up to stabilisation with downside runs, report and workbook, one revision and the promise to revise until accepted; site engineering and appraisals are separate. A good USDA feasibility study consultant will tell you how many unstaffed facilities they expect to find in your trade area before quoting.
Describe the facility on the contact page, with town, planned units, program and lender; a senior analyst is due to answer by the next business day.
Last updated 2026-11-08