USDA Feasibility Study for Solar and Renewable Energy (REAP) in Vermont

    NAICS 221114

    Vermont has been one of the busier REAP states for its size, with 46 REAP grants recorded in USAspending for FY2024 to FY2026, yet not a single REAP guaranteed loan, and no solar or renewable generation business with paid staff appears in the Census data at all. That pattern describes the old REAP: farms and rural businesses used grants to help pay for systems on their own property. Since 16 October 2026 the order is reversed. Under the new rule a grant can be sought only once the system is installed and has a year of operating data; it may cover no more than a quarter of the cost, with a $500,000 ceiling for renewable systems, and USDA directs builders to the REAP guaranteed loan for construction money [R1]. A USDA solar feasibility study in Vermont now has to support the loan that builds the system, on a structure that works even if the later grant never comes.

    Solar and renewable energy in Vermont: what the data show

    Vermont: solar and other renewable power generation, supply and rural footprint

    MeasureVermontUnited States
    Establishments, 2019 → 20230 → 0 (n/a)405 → 942
    Per 100,000 residents (2023)0.00.3
    Share of state population in non-metro counties (2025)64.7%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Reading a table of zeros. The table counts businesses whose main activity is selling power from solar, wind, biomass and similar sources and that have paid employees. Vermont has none, while the national count more than doubled to 942. That does not mean Vermont has little solar: systems owned by farms, stores, inns and manufacturers serve their owners' own load and are counted under the owner's industry, and many generation projects are owned by entities without payroll. For a REAP project the relevant market is the applicant's own energy use and the utility tariff, not a competitor count. The zeros do mean there is no local operating benchmark for a merchant generator, and a study for a project that sells power must build one from contracts and tariffs.

    Vermont: SBA lending to solar and other renewable power generation

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20160$00$0
    FY2017 to FY20190$00$0
    FY2020 to FY20230$05$2.1 million
    FY2024 to FY20260$00$0
    Vermont had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Five loans and a warning. Vermont's only SBA generation loans are five 504 loans in FY2020 to FY2023 totalling $2.1 million, an average of $427,800. No asset type in the Vermont packs carries a worse national record: of 31 seasoned generation 7(a) loans, 12.9 percent were charged off after about 51 months, and the pack data show nine of the 68 approved in FY2020 to FY2023 already written off. Across the country, generation businesses took 138 7(a) loans from FY2020 through FY2026, at a mean of $478,591. Lenders will read those numbers as a reason to want a study that tests production, tariffs and payback hard.

    Regional comparison (other states' packs)

    Generation businesses with payroll are rare across the region: New Hampshire's pack shows 3 (down from 9), Maine's 5 (down from 7), Massachusetts 22 (up from 12) and New York 45 (up from 16). SBA lending is equally thin: New Hampshire three 504 loans averaging $166,000 in FY2020 to FY2026, Maine one 7(a) of $200,000 and one 504 of $404,000, Massachusetts five 7(a) averaging $217,000 and two 504 averaging $1,615,500, New York two 7(a) averaging $387,500. Vermont's 46 REAP grants are a stronger signal of rural activity than any of these business counts.

    The REAP rule effective 16 October 2026

    The rule appeared in the Federal Register on 1 October 2026 as a final rule with comment period (91 FR 62600) and took effect on 16 October [R1]. Six months earlier, USDA had withdrawn the FY2025 to FY2027 REAP funding notice, so applicants without a signed agreement must start again under the new rule [R2]. The terms that matter most for a Vermont project:

    TopicRule effective 16 October 2026Effect on the feasibility study
    TimingProject Period must end 12 to 24 months before the application (12 to 36 months in the first window)The study now often supports the loan that builds the project, not the grant
    Data12 months of actual production or savings and 12 months of pre-installation dataProduction estimates must be reconciled with actual meter data
    Award sizeMinimum $1,500; maximum $500,000 for renewable systems and $250,000 for efficiencyGrants cover a smaller share of large projects
    Cost shareAt least 75% of project costGrant at most 25% of cost
    Combined REAP fundingGrant plus guaranteed loan at most 75% of project costCaps the loan when a grant is planned
    CroplandGround-mount solar or wind on Cropland (7 CFR 718.2) ineligible; no retrofits of such systemsSite screening first
    Foreign componentsSolar or wind systems with any component from a foreign adversary under 15 CFR 791.4 ineligible, except projects installed before publicationCountry-of-origin list for every component
    SizingGround-mount systems must show commensurate historical energy use; storage limited to 120% of prior annual useLoad analysis is mandatory
    EconomicsSimple payback must not exceed useful lifePayback calculation is an eligibility test
    LocationsProjects at more than one location ineligibleOne site per application
    ExclusionsEV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projectsScope these out of the grant budget

    No funding notice under the new rule had been published by 7 November 2026 [R1]. For Vermont farms the cropland rule is the first screen: a ground-mount array on land that qualifies as cropland is ineligible for REAP, so roof, barn, parking or non-cropland sites come first.

    Rural footprint and eligibility in Vermont

    With no generation businesses in the data, there is no rural share to report; about two-thirds of Vermonters (64.7 percent) live outside metro counties. According to the site's national renewable energy page, REAP is open to agricultural producers, meaning those drawing half or more of gross income from farming over a five-year average, and to rural small businesses, and the 2026 grant rule requires a rural project site. For B&I, 7 CFR 5001.3 shuts out towns above 50,000 people together with their urbanized edges; with Burlington the largest Vermont place at 44,019 in the Vintage 2025 estimates, the population test does not exclude Vermont sites, though USDA confirms each one. The Vermont state guide covers the rule. Guaranteed-loan applicants are screened under 5001.127 for debarment and for unpaid federal judgments, taxes and debts, owners above 20 percent included; for the grant, only the top-level owner may apply, and only once each federal fiscal year [R1].

    Program fit

    RouteWhat it financesKey termsStudy
    REAP guaranteed loanBuilding the system: the up-front cost$5,000 up to 75% of eligible project costs, $25 million per borrower; fiscal 2026 guarantee 80%, fee 1.0%, retention 0.25% (91 FR 11272; site's national page)When the lender or Agency deems it necessary; technical report required (per the site's national page)
    REAP grantA completed, operating system with 12 months of dataUp to 25% of cost; $500,000 cap for renewable systems; competitive [R1]Resource assessment, or a study in its place
    B&I guaranteed loanRenewable systems within a rural business project85% under $5 million; fee 3.0%; retention 0.55% (91 FR 11272)Required above $1,000,000 for a new business (5001.306(a)(3)(i))
    SBA 504Owner-occupied fixed assets, including systems10% borrower; 15% if new or single purpose (13 CFR 120.910)SBA may require one (13 CFR 120.160(b))

    The site's other state pages report an August 2025 USDA policy restricting solar under B&I, while the 2026 CFR still lists renewable systems as an eligible B&I purpose, according to the site's national renewable page; a sponsor should confirm B&I treatment with the state office before relying on it. For most Vermont farms and small businesses, the REAP guaranteed loan, possibly followed by a REAP grant, is the natural route.

    Worked example (illustrative)

    The loan is $480,000, the national FY2020 to FY2026 average SBA 7(a) loan for solar and renewable generation ($478,591) rounded, at an assumed 7.00 percent fixed rate over 20 years. Structure A borrows the REAP maximum of 75 percent of eligible cost; Structure B borrows 50 percent and plans a 25 percent grant after 12 months of operation, so grant plus loan stays at the 75 percent cap. The last column shows the same $480,000 under B&I terms.

    Input or resultA: REAP loan onlyB: REAP loan + later grantSame loan under B&I
    Total eligible project cost$640,000.00$640,000.00$640,000.00
    Guaranteed loan$480,000.00$320,000.00$480,000.00
    REAP grant, if awarded after 12 months$0.00$160,000.00n/a
    Owner cash at construction$160,000.00$320,000.00$160,000.00
    Owner cash net of grant, if awarded$160,000.00$160,000.00$160,000.00
    Guarantee percentage (fiscal 2026)80%80%85%
    Guaranteed amount$384,000.00$256,000.00$408,000.00
    Upfront guarantee fee$3,840.00 (1.0%)$2,560.00 (1.0%)$12,240.00 (3.0%)
    Upfront fee if issued before construction completion (extra 0.50%)(not computed)(not computed)$14,280.00
    First annual retention fee (guaranteed share after 12 payments)$937.16 (0.25%)$624.77 (0.25%)$2,190.62 (0.55%)
    Monthly payment$3,721.43$2,480.96$3,721.43
    Annual debt service$44,657.22$29,771.48$44,657.22
    Annual energy value (savings plus sales, net of O&M) for 1.25x$55,821.52$37,214.35$55,821.52
    Coverage at that value with a rate 2 points higher1.08x1.08x1.08x
    Simple payback at that energy value (project cost / annual value)11.47 years17.20 years11.47 years

    What the structures show. To service Structure A at 1.25x, the $640,000 system must produce $55,821.52 a year in savings and sales after O&M, which works out to a simple payback of 11.47 years. Structure B gets by on $37,214.35 a year, yet asks the owner for $320,000 up front and a year's wait before it can even compete for the grant; if it is not awarded, the owner has put in twice the cash of Structure A. A lender should underwrite B on its debt service alone. The payback figure is also an eligibility test for the grant: under the 2026 rule simple payback must not exceed the system's useful life, so the study documents useful life from the equipment warranties and engineering, and shows the payback at the actual energy value, not only at the 1.25x level. Under B&I the same $480,000 costs $8,400.00 more in upfront fee than under REAP.

    Evidence the study must build

    1. Twelve months or more of utility bills or interval data, the tariff with energy, demand and fixed charges, and the export or net metering terms that apply to the site.
    2. A production estimate for the specific site, reconciled with actual meter data once the system runs, as the grant requires.
    3. A load analysis showing that a ground-mount system matches historical use, and that any storage stays within 120 percent of prior annual use.
    4. Site screening: whether the land is cropland under 7 CFR 718.2, roof condition and structural capacity, shading, and interconnection capacity on the feeder.
    5. A component list with country of origin, to show no component comes from a foreign adversary under 15 CFR 791.4.
    6. Installer qualifications: state licensing and at least three similar installations, and procurement under 2 CFR 200.318 to 200.327.
    7. Ownership and site control: the site owned or leased at least 12 months before the Project Period, and the highest-level owner applying once per fiscal year.
    8. Simple payback against useful life, debt coverage with and without the grant, and sensitivity to tariff changes.

    Risks and mitigants

    Tariff and net metering changes are the largest economic risk for a behind-the-meter system; the study models the value of exported power under current terms and under a reduced case. Production shortfalls from snow cover, shading or equipment faults reduce savings; monitoring and O&M contracts help. Interconnection delays and upgrade costs can stall a project. The grant is competitive and paid late, so the debt must stand without it. Foreign-component rules can disqualify equipment after purchase if not checked first. The national SBA loss rate, 12.9 percent of seasoned loans, is a reminder that generation projects fail when assumptions are loose.

    Process and documents

    A REAP guaranteed loan request goes from the lender to Rural Development in Vermont with the technical report, and with the feasibility study whenever the lender or USDA calls for one. The sponsor supplies utility data and tariffs, site and roof information, installer proposals with component origin, interconnection applications, ownership and lease documents, financial statements and, for agricultural producers, evidence of agricultural income. Reviewers send back projects that rely on modelled production without a load analysis, ignore the cropland rule, or show payback longer than useful life.

    Program example

    None. Vermont's 46 REAP grants in FY2024 to FY2026 are counts in USAspending; the inputs do not identify individual projects.

    Hiring a USDA solar energy feasibility study consultant in Vermont

    For a REAP guaranteed loan, the site's national renewable page says a feasibility study is required when the lender or the Agency deems it necessary, alongside a technical report; B&I, through 5001.306(a)(3)(i), makes an outside study compulsory once a newly formed borrower passes $1,000,000. Under the grant rule, a renewable system application needs a resource assessment or a feasibility study in its place [R1]. Pick a solar feasibility study consultant who is not your installer, not your panel or inverter supplier and not your bank.

    Two REAP bands appear on the site's pricing page: $4,900 to $8,500 and four or five weeks where the loan is below $600,000, and $7,500 to $11,500 and five to seven weeks for larger guaranteed loans, each fixed in the proposal. The fee pays for the economic, market, technical, financial and management analysis, a cash flow run against weaker output and lower tariffs, the report and spreadsheet, a revision pass and the written acceptance commitment; engineering, interconnection studies and grant application drafting are separate. A USDA feasibility study consultant should show you, before you sign, how the study will treat the 75 percent cap, the cropland screen and the payback test, because those three decide REAP eligibility.

    Tell us about the system through the contact page (roof or ground, kilowatts, utility, REAP loan, REAP grant or B&I, and your lender) and a senior analyst will answer within one business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a Vermont solar project need a feasibility study for REAP?

    For a REAP guaranteed loan, a study is required when the lender or USDA deems it necessary, plus a technical report, per the site's national renewable page. A REAP grant application for a renewable system needs a resource assessment or a feasibility study in its place [R1]. B&I separately demands an independent study from a start-up borrowing more than $1,000,000.

    What does a solar feasibility study consultant cost in Vermont?

    REAP work is priced in two fixed bands on the site: $4,900 to $8,500 below a $600,000 loan, $7,500 to $11,500 above it. On the $480,000 example, the REAP guarantee fee is $3,840.00, against $12,240.00 under B&I. Interconnection and utility rate modelling appear on the cost page as scope drivers for larger energy projects, which is why the higher band applies above $600,000.

    How long does a REAP study take?

    Four to five weeks for smaller REAP studies and five to seven for larger guaranteed-loan studies, per the cost page, with a rush option at a premium. Studies wait on utility interval data, interconnection information and installer component lists, so assembling those early shortens the schedule. Twelve months of bills are the minimum input.

    Who may prepare a solar study for USDA?

    An independent professional with relevant knowledge and experience, as the 2026 REAP rule describes, whose findings relate to the specific site, per the site's national renewable page. Installers and equipment suppliers have a stake in the sale, so their production estimates are inputs rather than the independent study. Lenders are excluded as well.

    Can I still get a REAP grant before building in Vermont?

    No. No. Since 16 October 2026 the system has to be finished and running, with a year of measured output or savings and a year of data from before installation, before a grant application can go in. Up-front costs are financed with the REAP guaranteed loan or other credit [R1].

    How large can a REAP grant be now?

    A quarter of the project cost at most, with ceilings of $500,000 for renewable systems and $250,000 for efficiency work, and a $1,500 floor. Together, the grant and any REAP guaranteed loan cannot pass three-quarters of the cost [R1]. The pre-rule 50 percent share and $1 million cap no longer apply.

    Can a Vermont farm put a ground-mount array on a hayfield?

    Not under REAP if the field counts as Cropland under 7 CFR 718.2; the 2026 rule bars ground-mounted solar and wind there and will not fund retrofits of existing ones [R1]. Roofs, barns, parking areas or land that is not cropland are the alternatives, subject to the load and sizing tests.

    Can one solar study serve REAP, B&I and SBA?

    It can, as long as every lender is listed as a user and every structure appears in the model. Under 13 CFR 120.160(b), SBA too may call for a study. Vermont generation projects used five SBA 504 loans averaging $427,800 in FY2020 to FY2023, so a 504 comparison is realistic for owner-occupied businesses.

    Why does Census show no solar businesses in Vermont?

    Census only counts firms whose main business is selling renewable electricity and that carry a payroll. Systems owned by farms and businesses for their own use are counted in the owner's industry, and many generation owners have no payroll. Vermont's 46 REAP grants in FY2024 to FY2026 show the activity the table misses.

    Sources

    [R1] USDA RBCS, Unleashing American Energy and Economic Prosperity; Rural Energy for America Program (REAP), final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026. https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm (accessed 7 Nov 2026) [R2] USDA RBCS, Notice of Rescission of Funding Opportunity for the Rural Energy for America Program, 91 FR 20090 (15 Apr 2026). https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm (accessed 7 Nov 2026)

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for FY2026, including REAP (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    8. USAspending.gov, prime award data by assistance listing (10.868 REAP, 10.768, 10.766), FY2024 to FY2026: https://www.usaspending.gov/
    9. Site pages: /renewable-energy-feasibility-study (REAP loan terms and study rules), /usda-feasibility-study-cost, /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.