Vermont has been one of the busier REAP states for its size, with 46 REAP grants recorded in USAspending for FY2024 to FY2026, yet not a single REAP guaranteed loan, and no solar or renewable generation business with paid staff appears in the Census data at all. That pattern describes the old REAP: farms and rural businesses used grants to help pay for systems on their own property. Since 16 October 2026 the order is reversed. Under the new rule a grant can be sought only once the system is installed and has a year of operating data; it may cover no more than a quarter of the cost, with a $500,000 ceiling for renewable systems, and USDA directs builders to the REAP guaranteed loan for construction money [R1]. A USDA solar feasibility study in Vermont now has to support the loan that builds the system, on a structure that works even if the later grant never comes.
Solar and renewable energy in Vermont: what the data show
Vermont: solar and other renewable power generation, supply and rural footprint
| Measure | Vermont | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 0 (n/a) | 405 → 942 |
| Per 100,000 residents (2023) | 0.0 | 0.3 |
| Share of state population in non-metro counties (2025) | 64.7% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Reading a table of zeros. The table counts businesses whose main activity is selling power from solar, wind, biomass and similar sources and that have paid employees. Vermont has none, while the national count more than doubled to 942. That does not mean Vermont has little solar: systems owned by farms, stores, inns and manufacturers serve their owners' own load and are counted under the owner's industry, and many generation projects are owned by entities without payroll. For a REAP project the relevant market is the applicant's own energy use and the utility tariff, not a competitor count. The zeros do mean there is no local operating benchmark for a merchant generator, and a study for a project that sells power must build one from contracts and tariffs.
Vermont: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 0 | $0 | 0 | $0 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 0 | $0 | 5 | $2.1 million |
| FY2024 to FY2026 | 0 | $0 | 0 | $0 |
| Vermont had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval. |
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
Five loans and a warning. Vermont's only SBA generation loans are five 504 loans in FY2020 to FY2023 totalling $2.1 million, an average of $427,800. No asset type in the Vermont packs carries a worse national record: of 31 seasoned generation 7(a) loans, 12.9 percent were charged off after about 51 months, and the pack data show nine of the 68 approved in FY2020 to FY2023 already written off. Across the country, generation businesses took 138 7(a) loans from FY2020 through FY2026, at a mean of $478,591. Lenders will read those numbers as a reason to want a study that tests production, tariffs and payback hard.
Regional comparison (other states' packs)
Generation businesses with payroll are rare across the region: New Hampshire's pack shows 3 (down from 9), Maine's 5 (down from 7), Massachusetts 22 (up from 12) and New York 45 (up from 16). SBA lending is equally thin: New Hampshire three 504 loans averaging $166,000 in FY2020 to FY2026, Maine one 7(a) of $200,000 and one 504 of $404,000, Massachusetts five 7(a) averaging $217,000 and two 504 averaging $1,615,500, New York two 7(a) averaging $387,500. Vermont's 46 REAP grants are a stronger signal of rural activity than any of these business counts.
The REAP rule effective 16 October 2026
The rule appeared in the Federal Register on 1 October 2026 as a final rule with comment period (91 FR 62600) and took effect on 16 October [R1]. Six months earlier, USDA had withdrawn the FY2025 to FY2027 REAP funding notice, so applicants without a signed agreement must start again under the new rule [R2]. The terms that matter most for a Vermont project:
| Topic | Rule effective 16 October 2026 | Effect on the feasibility study |
|---|---|---|
| Timing | Project Period must end 12 to 24 months before the application (12 to 36 months in the first window) | The study now often supports the loan that builds the project, not the grant |
| Data | 12 months of actual production or savings and 12 months of pre-installation data | Production estimates must be reconciled with actual meter data |
| Award size | Minimum $1,500; maximum $500,000 for renewable systems and $250,000 for efficiency | Grants cover a smaller share of large projects |
| Cost share | At least 75% of project cost | Grant at most 25% of cost |
| Combined REAP funding | Grant plus guaranteed loan at most 75% of project cost | Caps the loan when a grant is planned |
| Cropland | Ground-mount solar or wind on Cropland (7 CFR 718.2) ineligible; no retrofits of such systems | Site screening first |
| Foreign components | Solar or wind systems with any component from a foreign adversary under 15 CFR 791.4 ineligible, except projects installed before publication | Country-of-origin list for every component |
| Sizing | Ground-mount systems must show commensurate historical energy use; storage limited to 120% of prior annual use | Load analysis is mandatory |
| Economics | Simple payback must not exceed useful life | Payback calculation is an eligibility test |
| Locations | Projects at more than one location ineligible | One site per application |
| Exclusions | EV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projects | Scope these out of the grant budget |
No funding notice under the new rule had been published by 7 November 2026 [R1]. For Vermont farms the cropland rule is the first screen: a ground-mount array on land that qualifies as cropland is ineligible for REAP, so roof, barn, parking or non-cropland sites come first.
Rural footprint and eligibility in Vermont
With no generation businesses in the data, there is no rural share to report; about two-thirds of Vermonters (64.7 percent) live outside metro counties. According to the site's national renewable energy page, REAP is open to agricultural producers, meaning those drawing half or more of gross income from farming over a five-year average, and to rural small businesses, and the 2026 grant rule requires a rural project site. For B&I, 7 CFR 5001.3 shuts out towns above 50,000 people together with their urbanized edges; with Burlington the largest Vermont place at 44,019 in the Vintage 2025 estimates, the population test does not exclude Vermont sites, though USDA confirms each one. The Vermont state guide covers the rule. Guaranteed-loan applicants are screened under 5001.127 for debarment and for unpaid federal judgments, taxes and debts, owners above 20 percent included; for the grant, only the top-level owner may apply, and only once each federal fiscal year [R1].
Program fit
| Route | What it finances | Key terms | Study |
|---|---|---|---|
| REAP guaranteed loan | Building the system: the up-front cost | $5,000 up to 75% of eligible project costs, $25 million per borrower; fiscal 2026 guarantee 80%, fee 1.0%, retention 0.25% (91 FR 11272; site's national page) | When the lender or Agency deems it necessary; technical report required (per the site's national page) |
| REAP grant | A completed, operating system with 12 months of data | Up to 25% of cost; $500,000 cap for renewable systems; competitive [R1] | Resource assessment, or a study in its place |
| B&I guaranteed loan | Renewable systems within a rural business project | 85% under $5 million; fee 3.0%; retention 0.55% (91 FR 11272) | Required above $1,000,000 for a new business (5001.306(a)(3)(i)) |
| SBA 504 | Owner-occupied fixed assets, including systems | 10% borrower; 15% if new or single purpose (13 CFR 120.910) | SBA may require one (13 CFR 120.160(b)) |
The site's other state pages report an August 2025 USDA policy restricting solar under B&I, while the 2026 CFR still lists renewable systems as an eligible B&I purpose, according to the site's national renewable page; a sponsor should confirm B&I treatment with the state office before relying on it. For most Vermont farms and small businesses, the REAP guaranteed loan, possibly followed by a REAP grant, is the natural route.
Worked example (illustrative)
The loan is $480,000, the national FY2020 to FY2026 average SBA 7(a) loan for solar and renewable generation ($478,591) rounded, at an assumed 7.00 percent fixed rate over 20 years. Structure A borrows the REAP maximum of 75 percent of eligible cost; Structure B borrows 50 percent and plans a 25 percent grant after 12 months of operation, so grant plus loan stays at the 75 percent cap. The last column shows the same $480,000 under B&I terms.
| Input or result | A: REAP loan only | B: REAP loan + later grant | Same loan under B&I |
|---|---|---|---|
| Total eligible project cost | $640,000.00 | $640,000.00 | $640,000.00 |
| Guaranteed loan | $480,000.00 | $320,000.00 | $480,000.00 |
| REAP grant, if awarded after 12 months | $0.00 | $160,000.00 | n/a |
| Owner cash at construction | $160,000.00 | $320,000.00 | $160,000.00 |
| Owner cash net of grant, if awarded | $160,000.00 | $160,000.00 | $160,000.00 |
| Guarantee percentage (fiscal 2026) | 80% | 80% | 85% |
| Guaranteed amount | $384,000.00 | $256,000.00 | $408,000.00 |
| Upfront guarantee fee | $3,840.00 (1.0%) | $2,560.00 (1.0%) | $12,240.00 (3.0%) |
| Upfront fee if issued before construction completion (extra 0.50%) | (not computed) | (not computed) | $14,280.00 |
| First annual retention fee (guaranteed share after 12 payments) | $937.16 (0.25%) | $624.77 (0.25%) | $2,190.62 (0.55%) |
| Monthly payment | $3,721.43 | $2,480.96 | $3,721.43 |
| Annual debt service | $44,657.22 | $29,771.48 | $44,657.22 |
| Annual energy value (savings plus sales, net of O&M) for 1.25x | $55,821.52 | $37,214.35 | $55,821.52 |
| Coverage at that value with a rate 2 points higher | 1.08x | 1.08x | 1.08x |
| Simple payback at that energy value (project cost / annual value) | 11.47 years | 17.20 years | 11.47 years |
What the structures show. To service Structure A at 1.25x, the $640,000 system must produce $55,821.52 a year in savings and sales after O&M, which works out to a simple payback of 11.47 years. Structure B gets by on $37,214.35 a year, yet asks the owner for $320,000 up front and a year's wait before it can even compete for the grant; if it is not awarded, the owner has put in twice the cash of Structure A. A lender should underwrite B on its debt service alone. The payback figure is also an eligibility test for the grant: under the 2026 rule simple payback must not exceed the system's useful life, so the study documents useful life from the equipment warranties and engineering, and shows the payback at the actual energy value, not only at the 1.25x level. Under B&I the same $480,000 costs $8,400.00 more in upfront fee than under REAP.
Evidence the study must build
- Twelve months or more of utility bills or interval data, the tariff with energy, demand and fixed charges, and the export or net metering terms that apply to the site.
- A production estimate for the specific site, reconciled with actual meter data once the system runs, as the grant requires.
- A load analysis showing that a ground-mount system matches historical use, and that any storage stays within 120 percent of prior annual use.
- Site screening: whether the land is cropland under 7 CFR 718.2, roof condition and structural capacity, shading, and interconnection capacity on the feeder.
- A component list with country of origin, to show no component comes from a foreign adversary under 15 CFR 791.4.
- Installer qualifications: state licensing and at least three similar installations, and procurement under 2 CFR 200.318 to 200.327.
- Ownership and site control: the site owned or leased at least 12 months before the Project Period, and the highest-level owner applying once per fiscal year.
- Simple payback against useful life, debt coverage with and without the grant, and sensitivity to tariff changes.
Risks and mitigants
Tariff and net metering changes are the largest economic risk for a behind-the-meter system; the study models the value of exported power under current terms and under a reduced case. Production shortfalls from snow cover, shading or equipment faults reduce savings; monitoring and O&M contracts help. Interconnection delays and upgrade costs can stall a project. The grant is competitive and paid late, so the debt must stand without it. Foreign-component rules can disqualify equipment after purchase if not checked first. The national SBA loss rate, 12.9 percent of seasoned loans, is a reminder that generation projects fail when assumptions are loose.
Process and documents
A REAP guaranteed loan request goes from the lender to Rural Development in Vermont with the technical report, and with the feasibility study whenever the lender or USDA calls for one. The sponsor supplies utility data and tariffs, site and roof information, installer proposals with component origin, interconnection applications, ownership and lease documents, financial statements and, for agricultural producers, evidence of agricultural income. Reviewers send back projects that rely on modelled production without a load analysis, ignore the cropland rule, or show payback longer than useful life.
Program example
None. Vermont's 46 REAP grants in FY2024 to FY2026 are counts in USAspending; the inputs do not identify individual projects.
Hiring a USDA solar energy feasibility study consultant in Vermont
For a REAP guaranteed loan, the site's national renewable page says a feasibility study is required when the lender or the Agency deems it necessary, alongside a technical report; B&I, through 5001.306(a)(3)(i), makes an outside study compulsory once a newly formed borrower passes $1,000,000. Under the grant rule, a renewable system application needs a resource assessment or a feasibility study in its place [R1]. Pick a solar feasibility study consultant who is not your installer, not your panel or inverter supplier and not your bank.
Two REAP bands appear on the site's pricing page: $4,900 to $8,500 and four or five weeks where the loan is below $600,000, and $7,500 to $11,500 and five to seven weeks for larger guaranteed loans, each fixed in the proposal. The fee pays for the economic, market, technical, financial and management analysis, a cash flow run against weaker output and lower tariffs, the report and spreadsheet, a revision pass and the written acceptance commitment; engineering, interconnection studies and grant application drafting are separate. A USDA feasibility study consultant should show you, before you sign, how the study will treat the 75 percent cap, the cropland screen and the payback test, because those three decide REAP eligibility.
Tell us about the system through the contact page (roof or ground, kilowatts, utility, REAP loan, REAP grant or B&I, and your lender) and a senior analyst will answer within one business day.
Last updated 2026-11-08