Vermont has three refrigerated warehouses with paid staff, the same three in 2019 and 2023, employing 15 people between them. No SBA 7(a) or 504 loan for refrigerated warehousing appears in Vermont's record since FY2010. Against that, the state has 192 food plants (excluding meat), 17 meat and poultry plants and 83 breweries, wineries and distilleries, most of them small, many of them seasonal, and nearly all of them relying on their own coolers or on warehouses outside the state. A USDA cold storage feasibility study in Vermont therefore cannot measure a market by counting competitors; it has to prove demand from the processors and farms that would actually rent pallet positions, and show that contracts, not hopes, will fill enough of the building to pay for its energy and its debt.
Cold storage in Vermont: market evidence
Vermont: refrigerated warehousing, supply and rural footprint
| Measure | Vermont | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 3 → 3 (+0.0%) | 1,350 → 1,367 |
| Per 100,000 residents (2023) | 0.5 | 0.4 |
| Average employees per establishment | 5.0 | 48.4 |
| Average annual pay per employee | $37,867 | $56,901 |
| Share of state population in non-metro counties (2025) | 64.7% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
What three warehouses say. Per resident, Vermont's 0.5 refrigerated warehouses per 100,000 people look close to the national 0.4, but the comparison is misleading. The national average warehouse employs 48.4 people and carries $2,753,160 of payroll; Vermont's three average 5.0 employees and $189,333 of payroll, roughly a fourteenth of the national scale. These are small facilities, not distribution centres. No county has three or more, so the county file places none of them, and no size classes are published. Pay of $37,867 per employee is two-thirds of the national $56,901 and too thin a sample to use as a wage benchmark; employment fell from 19 to 15.
The demand base: Vermont's processors
The Vermont packs give the clearest picture of potential customers. Food manufacturing (excluding meat) has 192 plants, 29.6 per 100,000 residents against 8.1 nationally, and 67.2 percent of those placed are in non-metro counties. Meat and poultry processing has 17 plants, up from 13. Beverage producers number 83. Most of these plants are small (42.0 percent of food plants have fewer than five employees), and small plants rarely build enough freezer space for peak production. Dairy, maple, fruit, meat from seasonal slaughter and frozen prepared foods all have peaks that exceed on-site storage. That is the case for a Vermont public or cooperative cold store; the study's job is to convert it into signed volume.
Regional comparison (other states' packs)
New Hampshire's pack shows four refrigerated warehouses averaging 11.8 employees at $55,106; Maine's shows five (down from six) averaging 8.6 employees at $56,605. Massachusetts has 26 averaging 32.2 employees and New York 39 averaging 28.0. Northern New England's cold storage is small everywhere, and the larger regional capacity sits in Massachusetts and New York, which is where Vermont product often goes to be stored today. SBA lending is scarce across the region: Maine shows two 7(a) loans since FY2010, Massachusetts four 7(a) and seven 504, New York one of each, New Hampshire none.
National benchmarks
Nationally, 32 SBA 7(a) refrigerated warehousing loans in FY2020 to FY2026 averaged $1,424,256, and 16 504 loans averaged $3,038,875. The pack data hold the older national cohort too: two of 38 refrigerated warehousing 7(a) loans from FY2010 to FY2016 (5.3 percent) were charged off, after 76 months on average. The sample is small even nationally, which tells a lender that cold storage is a specialised credit with few precedents.
Demand, revenue and costs
Demand is pallet positions needed by temperature zone (frozen, chilled, ambient) and month, from named processors, farms, distributors and food banks, with their seasonal peaks. Revenue is storage fees per pallet per month, handling fees per pallet in and out, and charges for blast freezing, tempering, case picking, labelling and cross-docking; some warehouses lease dedicated rooms to an anchor customer. Energy for refrigeration is the cost line that most often breaks a pro forma and should be modelled from the utility tariff, including demand charges. Other costs are labour, refrigeration and door maintenance, lift trucks, insurance including product liability, property tax and food safety programs. Capital items are land and site work, an insulated building with floors protected against frost heave in freezer zones, the refrigeration system, racking, dock doors and levelers, blast freezers, backup power and a ramp-up reserve.
Rural footprint and B&I eligibility in Vermont
With no county placement, the pack cannot give a rural share, though the processors a warehouse would serve are mostly in non-metro counties. Section 5001.3 leaves out big towns, those with more than 50,000 residents, plus the contiguous urbanized ring around each; the site's national cold storage page adds that the test uses the latest census. Vermont has no place of that size in the Vintage 2025 estimates, Burlington being the largest at 44,019, so no Vermont warehouse site fails on population; USDA confirms the parcel. The Vermont state guide has the details. The national cold storage page also lists eligible borrower types, including companies, cooperatives, tribes, public bodies and individuals who are U.S. citizens or lawful permanent residents; a producers' cooperative is a natural owner for shared cold storage.
Whoever borrows, 5001.127 applies to the entity and to every owner with more than 20 percent or control, ruling out debarment and any unpaid federal judgment, tax or debt; 20 percent owners also guarantee (5001.204).
Program fit
For a rural public or cooperative cold store, B&I can carry the insulated building, the refrigeration plant, racking, lift trucks and start-up cash, with an 85 percent guarantee on loans below $5 million and amortization matched to the building. When the freezers belong to a meat, poultry or seafood plant, SPUR may be an option; the site's national pages describe a 90 percent guarantee without a rural test, run under Part 5001. Once running for a year, a warehouse may apply to REAP for more efficient compressors, controls or its own generation. SBA 7(a) and 504 are open but have not been used for this purpose in Vermont. Community Facilities may fit a public or nonprofit facility such as a food bank cold store, not a commercial warehouse.
| Term | USDA B&I, fiscal 2026 | Source |
|---|---|---|
| Guarantee | 85% under $5 million; 80% from $5 million to $25 million | 91 FR 11272 |
| Upfront guarantee fee | 3.0% of the guaranteed amount; plus 0.50% if issued before construction completion | 91 FR 11272 |
| Annual retention fee | 0.55% of the guaranteed balance on 31 December | 91 FR 11272 |
| Term | useful life, 40 years at most, no balloon | 7 CFR 5001.402 |
| Equity, new warehouse with storage contracts covering debt service for the loan term | 10% balance sheet equity (or 9:1), or 10% of project cost | 7 CFR 5001.105(d)(2) |
| Equity, other new warehouse | 20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) with a guarantee before construction completion | 7 CFR 5001.105(d)(3), (d)(4) |
| Independent feasibility study | required above $1,000,000 for a new business | 7 CFR 5001.306(a)(3)(i) |
| Refrigerant rules (from the site's national cold storage page) | ammonia above 10,000 pounds triggers EPA risk management and OSHA process safety rules; new HFC systems face GWP limits from 1 January 2026 | as cited there |
Financing benchmarks: no Vermont SBA record
The Vermont pack contains no SBA table because no refrigerated warehousing 7(a) or 504 loan was made in Vermont between FY2010 and FY2026. A lender will benchmark the project against the national figures above, the sponsor's contracts and equity, and the experience of comparable small cold stores in the region, which the study must document.
Worked example (illustrative)
Loan A takes the U.S. refrigerated warehousing 7(a) mean for FY2020 to FY2026, $1,424,256, as $1,420,000; Loan B, $3,040,000, rounds the national 504 average ($3,038,875) for a larger multi-temperature building. Assumptions for both: 7.50 percent, fixed, repaid over 25 years.
| Input or result | Loan A | Loan B |
|---|---|---|
| Loan amount | $1,420,000.00 | $3,040,000.00 |
| Guarantee percentage (fiscal 2026 tier) | 85% | 85% |
| Guaranteed amount | $1,207,000.00 | $2,584,000.00 |
| Upfront guarantee fee (3.0%) | $36,210.00 | $77,520.00 |
| Upfront fee if issued before construction completion (3.5%) | $42,245.00 | $90,440.00 |
| First annual retention fee (0.55% of the guaranteed share after 12 payments) | $6,544.50 | $14,010.77 |
| Monthly payment | $10,493.67 | $22,465.33 |
| Annual debt service (NOI for 1.00x) | $125,924.10 | $269,583.98 |
| NOI for 1.25x coverage | $157,405.12 | $336,979.98 |
| Coverage at that NOI with a rate 2 points higher | 1.06x | 1.06x |
| Coverage if NOI falls 20% | 1.00x | 1.00x |
| Equity, new warehouse without contracts, 25% of project cost (5001.105(d)(4)) | $473,333.33 | $1,013,333.33 |
| Total project cost on that basis | $1,893,333.33 | $4,053,333.33 |
| Equity, new warehouse, 20% balance sheet route (loan as sole liability) | $355,000.00 | $760,000.00 |
| Equity with contracts covering debt service, or existing business: 10% of project cost | $157,777.78 | $337,777.78 |
| Independent study under 5001.306(a)(3) | required for a new business | required for a new business |
Per-occupied-pallet test. For an illustrative 3,000 pallet positions at 80 percent average occupancy (2,400 occupied), Loan A needs $5.47 of net operating income per occupied pallet per month to reach 1.25x and $4.37 to cover debt, after energy, labour and all other costs. Loan B, for 6,500 positions at the same occupancy, needs $5.40 and $4.32. Adding operating cost per pallet gives the storage and handling revenue per pallet the study must support from contracts and regional rates. Seasonal occupancy matters more than the annual average: a warehouse full after harvest and half empty in spring must show coverage in its emptiest quarter.
Contracts change the equity. If storage agreements pay Loan B's debt service for its full term, 5001.105(d)(2) lets the new warehouse company show $337,777.78 of equity rather than $1,013,333.33. In a state with no existing market to point to, signed contracts do double work.
Evidence the study must build when local comparables are thin
- A customer list: processors, farms, cooperatives, distributors and food banks, with pallet positions by temperature zone and month, and signed contracts or letters of intent.
- Current storage arrangements of those customers, including out-of-state warehouses and their rates, which set the price ceiling.
- Rates from regional public cold stores, gathered directly, since Vermont has no public rate data.
- Energy modelling from the utility's actual tariff, with demand charges and backup power.
- Refrigerant choice and its regulatory consequences (ammonia thresholds, HFC limits).
- Building design: temperature zones, clear height, dock doors, racking and blast capacity matched to customer needs.
- Food safety and audit requirements of the customers' buyers.
- Seasonal occupancy by month and the reserve for the lowest months.
Risks and mitigants
Unproven demand is the central risk; signed contracts covering debt service are both the mitigant and the route to lower equity. Customer concentration (one processor taking most of the space) is common in small markets, so the study tests that customer leaving. Energy price increases hit cold storage directly; efficient design, on-site generation financed later through REAP, and pass-through clauses help. Refrigeration failure can destroy stored product, so insurance and backup power are underwriting items. A refrigerated building is special-purpose and appraises below cost under 5001.203.
Process and documents
Your bank lodges the B&I file and study with Rural Development's Vermont office; SPUR applications follow that program's notice. The sponsor supplies customer contracts and letters, the building design and refrigeration specifications, construction budget and contractor quotes, utility tariff and capacity letters, permits, statements for any existing business, resumes and personal financial statements. Reviewers return studies that assume full occupancy without contracts, price energy at an average cents per kilowatt-hour, or ignore the seasonal low point.
Program example
None. The inputs name no Vermont cold storage project financed through USDA.
Hiring a USDA cold storage feasibility study consultant in Vermont
A warehouse company created for the project and borrowing more than $1,000,000 under B&I must, per 5001.306(a)(3)(i), buy an outside study to USDA's scope; both examples are in that position. For existing operators and smaller loans USDA and the lender decide. The cold storage feasibility study consultant cannot be the refrigeration contractor, the builder, an anchor customer or the lender.
Because Vermont offers no local comparables, this is likely to be a complex engagement on the site's cost page ($10,500 to $14,500, seven to nine weeks), though a single-building project with signed contracts may fit the standard band ($6,900 to $12,500, six to seven weeks); a rush is available at a premium. That price buys each USDA chapter, a month-by-month occupancy and power model with downside cases, the written report and spreadsheet, a revision and the acceptance pledge; refrigeration engineering and appraisals are separate. Find out whether the USDA feasibility study consultant you hire will speak to your prospective tenants themselves; their written commitments are the market case.
Send the site, temperature zones, pallet count, customers and lender through the contact page; a senior analyst will respond within one business day, the page says.