Manufacturing in West Virginia pays well and concentrates in a few large plants. The state's 1,060 manufacturing establishments paid an average of $65,021 per employee in 2023, and 35 plants with 250 or more workers employed 45.1% of the sector's 48,350 jobs. At 59.9 plants per 100,000 residents the state is thinner than the national 84.5, so a new or expanding plant is often the largest private employer in its county, and its lender's first question is whether the market, the workforce and the supply chain will hold up for the life of a 10 to 20 year loan. A USDA manufacturing feasibility study answers that with evidence on customers, capacity, cost and coverage.
The B&I guarantee is built for this kind of credit: rural plants, long-lived equipment and buildings, and loans that outgrow a community bank's limits. For a new company borrowing more than $1,000,000, the study is compulsory under 7 CFR 5001.306(a)(3)(i).
Data current as of November 2026.
Program fit for a West Virginia manufacturer
| Route | Fit for a West Virginia plant | What to check first |
|---|---|---|
| USDA B&I guarantee | New plants, expansions, equipment, acquisitions and working capital for rural manufacturers; up to $25 million per borrower (5001.406(c)) | 85% guarantee under $5 million, 80% to $25 million (91 FR 11272); 7 CFR 5001.3 parcel test |
| SBA 7(a) | Equipment, working capital and smaller buildings; 115 West Virginia manufacturing loans since FY2010 | 75% guarantee above $150,000 (13 CFR 120.210) |
| SBA 504 | Owner-occupied plant and long-life equipment; 12 West Virginia manufacturing 504 loans since FY2010 | 10% borrower contribution typical (120.900), 15% for a new or single-purpose plant (120.910) |
| REAP | Energy-efficiency retrofits or on-site renewable systems at an operating plant | Grant at most 25% of cost and 12 months of data first under the rule effective 16 October 2026 |
| Community Facilities | Not for private manufacturing | Essential community facilities only |
| Conventional bank | Established manufacturers with strong balance sheets | Shorter terms; no guarantee fee |
Ownership and revenue screens in 7 CFR 5001.127 come first. A manufacturer cannot borrow under the guarantee if the company, a controlling owner, or a non-passive owner holding over 20 percent is under an unpaid federal court judgment (Tax Court aside), is delinquent on federal income tax or federal debt, or is suspended or debarred; a payment plan leaves the bar in place until the balance is cleared, and the lender confirms status on sam.gov. Paragraph (d) excludes income from illegal drugs, paraphernalia or other illegal products, which matters for any plant whose product line or contract manufacturing touches regulated substances. Gambling income under paragraph (b) rarely arises in manufacturing, but the 15 percent limit applies to any machine leases on site.
When the rule requires the study, and two related provisions
Part 5001 obliges a start-up whose guaranteed loan exceeds $1,000,000 to file a study by an independent consultant the Agency finds acceptable, in a scope the Agency sets (5001.306(a)(3)(i)). Smaller loans and existing companies are at the Agency's discretion (5001.306(a)(3)(ii)). Two other provisions bite on manufacturing in particular. Where the loan exceeds $1,000,000 and the project will create more than 50 jobs, the application needs Department of Labor concurrence (5001.306(a)(1)). And a new business holding sales contracts that cover debt service, with terms at least as long as the loan, needs only 10% equity rather than 20% to 25% (5001.105(d)(2)), which makes signed offtake agreements worth money at closing.
Manufacturing in West Virginia: market evidence
West Virginia: manufacturing establishments (all), supply and rural footprint
| Measure | West Virginia | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 1,109 → 1,060 (-4.4%) | 287,626 → 284,452 |
| Per 100,000 residents (2023) | 59.9 | 84.5 |
| Average employees per establishment | 45.6 | 43.4 |
| Average annual pay per employee | $65,021 | $73,202 |
| Share of establishments in non-metro counties | 42.2% (446 in 32 counties) | |
| Share of state population in non-metro counties (2025) | 38.4% |
Non-metro counties with the most manufacturing establishments (all) (2023): Harrison County (40); Mercer County (39); Marion County (35); Greenbrier County (27); Randolph County (25); Logan County (21).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
The table describes a smaller but heavier manufacturing base than the nation's. West Virginia has 29.1% fewer plants per resident than the U.S., yet its plants are slightly larger, 45.6 employees against 43.4, and its pay of $65,021 sits only 11.2% below the national $73,202, a far narrower gap than in the state's service industries. Plant count fell 4.4% between 2019 and 2023, against 1.1% nationally, while employment dipped only 1.1% and average pay rose +11.0%. Fewer, larger and better-paying plants is the pattern a lender will see. For a pro forma, $65,021 is a floor rather than a ceiling for skilled production work, because a new plant recruits against established employers paying that average. A reviewer will challenge three things: the labour plan in a county where one or two plants already employ most skilled workers, the customer base behind the sales forecast, and capital cost estimates that omit site preparation on difficult terrain.
What West Virginia makes: selected subsectors, 2023 (computed from the Census CBP state file)
| Subsector | Establishments | Share of state manufacturing | U.S. share | Employees |
|---|---|---|---|---|
| Wood products (NAICS 321) | 143 | 13.5% | 4.9% | 4,621 |
| Food, including meat and poultry (NAICS 311) | 78 | 7.4% | 10.9% | 4,047 |
| Breweries, wineries and distilleries (312120, 312130, 312140) | 30 | 2.8% | 3.9% | 205 |
| All other manufacturing | 809 | 76.3% | 80.3% | 39,477 |
West Virginia manufacturing by plant size: establishments and employment, 2023 (computed from the Census CBP state file)
| Employees per plant | Plants | Share of plants | Employees | Share of employment |
|---|---|---|---|---|
| Fewer than 10 | 514 | 48.5% | 1,927 | 4.0% |
| 10 to 49 | 364 | 34.3% | 8,398 | 17.4% |
| 50 to 249 | 147 | 13.9% | 16,221 | 33.5% |
| 250 or more | 35 | 3.3% | 21,804 | 45.1% |
West Virginia manufacturing employment and pay, 2019 and 2023 (computed from the Census CBP state files)
| Measure | 2019 | 2023 | Change |
|---|---|---|---|
| Manufacturing establishments | 1,109 | 1,060 | -4.4% |
| Paid employees | 48,901 | 48,350 | -1.1% |
| Average pay per employee | $58,581 | $65,021 | +11.0% |
| Payroll per establishment | $2,583,130 | $2,965,823 | +14.8% |
Demand drivers and the competitive frame
A plant's market is its customers, not its county. The study has to name the buyers or the channels, show contracts, letters of intent or purchase histories, and place the plant's capacity against regional and national demand for its product. The subsector table shows where West Virginia already has depth: wood products account for 13.5% of the state's manufacturing establishments against 4.9% nationally, so a sawmill, flooring, pallet or engineered-wood project lands in an established supply chain with known log markets and trucking. Food manufacturing, at 7.4% of plants against 10.9% nationally, is underweight, which can mean less competition for a processor but also fewer suppliers, co-packers and trained workers. The plant-size table matters for labour: 514 plants with fewer than ten workers employ only 1,927 people, while 35 large plants employ 21,804. A new mid-size plant recruits against those large employers and must show it can hire and keep staff at a competitive wage.
Revenue model, costs and capital items
Revenue is units times price by product and customer, built on capacity, utilisation ramp and contract terms, with price assumptions supported by contracts, quotes or published indexes. Cost of goods covers raw materials with their sourcing and freight, direct labour by shift, utilities at the plant's tariff, maintenance and consumables; overhead covers supervision, quality control, insurance, property tax and administration. Payroll per West Virginia plant averaged $2,965,823 in 2023, a scale that shows why a labour shortfall, not a sales miss, often breaks a plant's first-year coverage. Capital items are land, site work, utility extensions, building, process equipment with installation and commissioning, rail or truck access, environmental controls, start-up inventory, working capital through the ramp and an interest reserve.
Rural footprint and B&I eligibility in West Virginia
Of the 1,056 plants the county file assigns, 446 (42.2%) operate in 32 non-metro counties, above the 38.4% of residents living there. Computed on placed counts, non-metro counties carry 65.8 plants per 100,000 residents against 56.1 in metro counties, so rural West Virginia is more industrial per head than its metro areas. Harrison (40), Mercer (39), Marion (35), Greenbrier (27), Randolph (25) and Logan (21) lead by count; small counties such as Tucker, Pleasants and Ritchie carry 12 or 13 plants each on fewer than 8,100 residents.
Manufacturing plants per 100,000 residents: leading non-metro and metro counties by count (computed from CBP 2023 county counts and Vintage 2025 population)
| County | Status (OMB 2023) | Plants, 2023 | Residents, 2025 | Per 100,000 residents |
|---|---|---|---|---|
| Harrison County | Non-metro | 40 | 64,221 | 62.3 |
| Mercer County | Non-metro | 39 | 57,503 | 67.8 |
| Marion County | Non-metro | 35 | 55,584 | 63.0 |
| Greenbrier County | Non-metro | 27 | 31,578 | 85.5 |
| Randolph County | Non-metro | 25 | 26,882 | 93.0 |
| Nicholas County | Non-metro | 21 | 23,848 | 88.1 |
| Logan County | Non-metro | 21 | 30,375 | 69.1 |
| Kanawha County | Metro | 92 | 172,381 | 53.4 |
| Cabell County | Metro | 75 | 91,183 | 82.3 |
| Wood County | Metro | 50 | 82,385 | 60.7 |
| Berkeley County | Metro | 50 | 139,522 | 35.8 |
| Monongalia County | Metro | 46 | 107,991 | 42.6 |
The eligibility rule is 7 CFR 5001.3: rural area means land outside any city or town above 50,000 people and its contiguous, adjacent urbanized area. No West Virginia place exceeded 50,000 in the Vintage 2025 estimates. Charleston (46,117) and Huntington (44,815) come closest, and industrial sites in or beside them need a parcel-level check on the USDA map. Industrial parks in metro counties such as Wood, Berkeley or Putnam are not excluded by the metro label; Parkersburg has 28,593 residents and Martinsburg 19,211. The West Virginia state hub carries the near-line list, and the B&I eligibility check screens an individual site.
Financing benchmarks: USDA B&I next to SBA
West Virginia: SBA lending to manufacturing establishments (all)
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 53 | $24.4 million | 8 | $7.3 million |
| FY2017 to FY2019 | 18 | $6.8 million | 0 | $0 |
| FY2020 to FY2023 | 24 | $11.9 million | 3 | $1.3 million |
| FY2024 to FY2026 | 20 | $15.5 million | 1 | $966,000 |
Average 7(a) loan, FY2020 to FY2026: $623,064. Average 504 loan: $569,000. Of the 53 7(a) loans approved in FY2010 to FY2016 for West Virginia manufacturing establishments (all), 5.7% were charged off (national: 6.4% of 27,078), on average 75 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
West Virginia manufacturers have a better seasoned record than most sectors in the state. Three of the 53 FY2010 to FY2016 loans were charged off, $816,380 in all, against 6.4% nationally, and the food-processing pack carries the same three losses, so every seasoned manufacturing failure in the state was a food plant; one of the 18 FY2017 to FY2019 loans has been charged off so far, and none from FY2020 on. Loan size has grown: the 20 loans of FY2024 to FY2026 averaged about $774,925, against $460,323 in the first cohort. Over FY2020 to FY2026 the mean of $623,064 is 10.1% below the national manufacturing figure of $693,181. Those are equipment and working-capital loans. A new plant with its own building usually needs more than SBA provides comfortably, which is where B&I's term and $25 million ceiling matter.
FY2026 B&I terms applied to a West Virginia manufacturer
| Term | Rule and source | Reading for a West Virginia plant |
|---|---|---|
| Guarantee | 85% under $5 million; 80% from $5 million to $25 million (91 FR 11272) | A new mid-size plant often crosses $5 million and drops to 80% |
| Upfront fee | 3.0% of the guaranteed amount; reduced fee 1.0% with an 80% guarantee (91 FR 11272) | May be financed in the project budget |
| Annual retention fee | 0.55% of the guaranteed share of the 31 December balance (91 FR 11272; 5001.455) | Rate fixed at obligation |
| Maximum loan | $25 million per borrower (5001.406(c)) | Room for large plants |
| Term | Useful life up to 40 years; no balloon; interest-only must end within 3 years (5001.402) | Building 25 to 30 years, process equipment shorter |
| Equity, new plant | 20% balance sheet equity or 25% of project cost (5001.105(d)(4)); 10% with debt-service-covering sales contracts (5001.105(d)(2)); 25% if the guarantee issues before construction ends (5001.105(d)(3)) | Signed offtake can cut required equity sharply |
| Equity, existing plant | 10% under the 5001.105(d)(1) tests | Expansions by operating manufacturers |
| Construction | Before-completion guarantee needs a fixed-price contract, independent budget confirmation and equity injected first (5001.205(e)(2)) | Plan the draw schedule and bonding early |
| Collateral | Appraisal over $250,000; as-is and prospective values; going-concern value deducted (5001.203) | Special-purpose equipment discounts heavily |
| Jobs | Department of Labor concurrence above $1,000,000 and 50 jobs (5001.306(a)(1)) | Build into the timeline |
For a West Virginia plant the equity line is often the decisive one. A new company with no contracts needs a quarter of project cost; the same company with signed sales contracts covering debt service, running at least as long as the loan, needs a tenth. A study that documents those contracts properly can lower the cash a sponsor must raise.
Worked example (illustrative)
Inputs. Loan A, $625,000, approximates the average West Virginia manufacturing 7(a) loan for FY2020 to FY2026, $623,064, amortized over 10 years as an equipment loan. Loan B is $3,500,000, an illustrative new rural plant with building and process equipment, amortized over 20 years as a blended useful life. Both use an illustrative 7.50% fixed rate, not a quote, within 5001.401 and 5001.402, and FY2026 fees. No debt beyond the guaranteed loan is assumed in the equity rows. The wage comparison uses the 2023 state manufacturing average of $65,021.
| Line | Loan A: near the state manufacturing 7(a) average | Loan B: illustrative new rural plant |
|---|---|---|
| Illustrative rate and amortization | 7.50% fixed, 10 years, monthly | 7.50% fixed, 20 years, monthly |
| Loan amount | $625,000.00 | $3,500,000.00 |
| B&I guarantee, FY2026 (91 FR 11272) | 85% | 85% |
| Guaranteed amount | $531,250.00 | $2,975,000.00 |
| Unguaranteed portion held by the lender | $93,750.00 | $525,000.00 |
| Upfront guarantee fee (3.0% of guaranteed) | $15,937.50 | $89,250.00 |
| First-year retention fee (0.55% of the guaranteed share of the full balance; upper bound) | $2,921.88 | $16,362.50 |
| Retention fee on the balance after 12 monthly payments | $2,717.90 | $15,995.46 |
| Monthly principal and interest | $7,418.86 | $28,195.76 |
| Annual debt service | $89,026.33 | $338,349.14 |
| Net operating income for 1.25x coverage | $111,282.91 | $422,936.43 |
| Cushion above 1.00x | $22,256.58 | $84,587.29 |
| Cushion in full-time wages at the state manufacturing average ($65,021) | 0.34 positions | 1.30 positions |
| Interest-only year, if structured (5001.402) | $46,875.00 | $262,500.00 |
| Annual debt service if the rate is 2 points higher | $97,048.17 | $391,495.10 |
| Coverage at that rate on the same income | 1.15x | 1.08x |
| Coverage if income lands 10% below plan | 1.12x | 1.12x |
| New business: 25% of project cost (5001.105(d)(4)) | $208,333.33 on a $833,333.33 project | $1,166,666.67 on a $4,666,666.67 project |
| New business: 20% balance sheet equity (debt to equity 4:1) | $156,250.00 | $875,000.00 |
| Existing business: 10% of project cost (5001.105(d)(1)) | $69,444.44 on a $694,444.44 project | $388,888.89 on a $3,888,888.89 project |
| Reduced-fee option: upfront fee (1.0% of an 80% guarantee) | $5,000.00 | $28,000.00 |
| Study compulsory for a new business? (5001.306(a)(3)(i)) | No; the Agency may require one (5001.306(a)(3)(ii)) | Yes, above $1,000,000 |
| Application track (5001.306) | Full application (over $600,000) | Full application (over $600,000) |
| SBA 7(a) comparison: guaranteed share, amount and fee ceiling (120.210, 120.220) | 75%, $468,750.00, $14,062.50 | 75%, $2,625,000.00, $95,937.50 |
| New business with sales contracts covering debt service: 10% of project cost (5001.105(d)(2)) | $69,444.44 | $388,888.89 |
| Department of Labor concurrence (5001.306(a)(1)) | Not triggered at this size | Required if the project creates more than 50 jobs |
Interpreting the result. Loan A needs $111,282.91 of net operating income at 1.25x, and its cushion of $22,256.58 equals 0.34 of one production wage at the state average, so the margin for an equipment loan is thin in labour terms even when it looks comfortable on paper. Loan B needs $422,936.43; its cushion of $84,587.29 covers about 1.30 average wages. The equity rows show what contracts are worth: a new company without them puts in $1,166,666.67 under the 25% test, but with debt-service-covering sales contracts the requirement falls to $388,888.89. A two-point rate rise cuts Loan B's coverage to 1.08x.
What a lender-grade manufacturing feasibility study in West Virginia must prove
- Named customers or channels, with contracts, letters of intent or purchase histories, and the share of capacity each one takes.
- Product pricing supported by contracts, quotes or published indexes, with a downside price case.
- Raw material supply, sources and freight, especially for wood, food and mineral-based inputs moving over mountain roads.
- A staffing plan by shift and skill, with recruitment evidence and wages tested against the $65,021 state average and the large plants nearby.
- A capacity ramp from commissioning to steady utilisation, with working capital sized to it.
- Capital cost from vendor quotes and a contractor estimate, including site work, utility extensions and environmental controls.
- Quarterly cash flow through construction and start-up where the guarantee issues before completion (5001.202).
- Equity at the right 5001.105(d) level, with any sales contracts that justify the 10% tier attached.
- Debt service coverage under lower volume, lower price, higher material cost and a higher rate, with break-even utilisation stated.
Risks and mitigants specific to West Virginia
| Risk | Why it bites here | How the study tests or mitigates it |
|---|---|---|
| Labour depth | 35 large plants hold 45.1% of manufacturing jobs | Recruitment plan; wage benchmarking against local employers |
| Plant attrition | 49 fewer plants in 2023 than 2019 | Customer contracts; product diversification |
| Customer concentration | Small plants often sell to one or two buyers | Contract terms and buyer credit in the study |
| Site cost | Terrain, access roads and utility extensions add capital | Engineer's site estimate; contingency |
| Construction | Before-completion guarantee rules (5001.205(e)(2)) | Fixed-price contract, bonding, independent inspection |
| Eligibility edge | Charleston and Huntington are within 6,000 residents of the 50,000 line | Map check on the parcel |
Process, documents and the review
Lender choice comes first, then scoping; for B&I the finished study travels inside the lender's application to the USDA Rural Development state office serving West Virginia. Manufacturers should assemble customer contracts or letters of intent, product specifications and pricing, equipment quotes, the construction budget and schedule, site control and permits status, environmental reports where required, management biographies, three years of financial statements for an existing company, interim statements and a sources-and-uses table. Manufacturing studies are returned most often for unsupported sales volumes, a missing ramp-up, labour assumptions with no recruitment evidence, capital budgets without contingency, and projections that ignore working capital.
Program record, honestly labelled
No West Virginia manufacturer financed under B&I appears in the inputs, so this page names none. For the whole state and all industries, USAspending shows 8 B&I guaranteed loans in FY2024 to FY2026, against 643 across the country. What the inputs do record for West Virginia plants is SBA lending, set out above.
Hiring a USDA manufacturing feasibility study consultant in West Virginia
A start-up manufacturer borrowing above $1,000,000 under the guarantee has no choice: Part 5001 requires the independent study and lets the Agency set its scope. Expansions by established manufacturers fall under Agency and lender discretion, and the lender's 5001.202 evaluation must cover feasibility either way. A sponsor looking for a USDA feasibility study consultant should look for one who can work from customer contracts and plant engineering, not only market data, because that is where manufacturing studies are won or lost.
Published fees on the cost and timeline page put single-site B&I engagements for loans between $1 million and $10 million run $6,900 to $12,500 and take 6 to 7 weeks; loans above $10 million, phased plants or unusual product lines fall in the complex band of $10,500 to $14,500 and 7 to 9 weeks. The study includes the economic, market, technical, financial and management components, a five to ten year model with sensitivity tables, and a revision round, and the engagement letter commits to further revisions until USDA or the lender accepts it. A rush delivery of 3 to 4 weeks adds 20% to 35% when capacity allows.
To begin, gather the product, site, capital budget, customer evidence and lender name and request a free consultation. The site's consultation form promises a call back within a day.
Last updated 2026-11-08
USDA Feasibility, Inc.