Solar in West Virginia shows up in USDA's grant records, not in Census business counts. County Business Patterns finds no solar or other renewable generating business with paid employees in the state in 2019 or 2023, while the nation went from 405 to 942. Yet in FY2024 to FY2026 USAspending recorded 78 REAP grants and 4 REAP guaranteed loans with West Virginia as place of performance, and $9.9 million of REAP grant dollars, $5.54 per resident against $3.11 nationally. Most of that is farms and rural businesses putting solar on their own operations, which is exactly where a REAP feasibility study now does its work. The REAP rule effective 16 October 2026 changed the economics: the grant is smaller, it arrives after the system has run for a year, and the project has to be financed without it.
Data current as of November 2026.
Program fit for West Virginia solar
| Route | Fit for a West Virginia solar project | What to check first |
|---|---|---|
| REAP guaranteed loan (7 CFR 5001) | Construction financing for a rural small business or agricultural producer's system; USDA says the guaranteed loan is available for up-front costs | FY2026 REAP guarantee 80%, fee 1.0%, retention 0.25% (91 FR 11272); grant plus guaranteed loan at most 75% of cost |
| REAP grant | Paid after the project is built and has 12 months of production data; at most 25% of cost and $500,000 for renewable systems | National competitions only; one application per fiscal year per highest-level owner |
| USDA B&I guarantee | Larger rural generation projects owned by an operating business | 85% guarantee under $5 million, 80% to $25 million (91 FR 11272); 7 CFR 5001.3 parcel test |
| SBA 7(a) | Small business systems and equipment; 2 West Virginia solar-industry loans since FY2010 | 75% guarantee above $150,000 (13 CFR 120.210) |
| Conventional bank or equipment finance | Owners with strong balance sheets | Usually shorter terms |
Ownership screens in 7 CFR 5001.127 apply to REAP and B&I borrowers alike. For a farm or energy company, paragraph (a) is failed by any of these in the borrower, its controller or an active partner above 20 percent: a federal court judgment left unpaid (the Tax Court aside), tax or loan arrears owed to the federal government, or a suspension or debarment; arrears on a payment plan still count. For farm and family-business REAP applicants with several owners, that check should be done before the application window opens. Paragraph (d) excludes income from illegal products, which rules out systems serving such operations.
The REAP rule in force since 16 October 2026
| Topic | Rule effective 16 October 2026 | What it means for the study |
|---|---|---|
| Timing | Project Period ends 12 to 24 months before the application (12 to 36 months in the first window) | The study supports the loan that builds the system, not the grant |
| Data | 12 months of actual production or savings and 12 months of pre-installation data | Production estimates must reconcile with meter data |
| Award size | Grants of $1,500 to $500,000 for renewable systems ($250,000 for efficiency) | A smaller share of a large project |
| Cost share | At least 75% of project cost from other sources | Grant at most 25% of cost |
| Combined REAP funding | Grant plus guaranteed loan at most 75% of cost | Caps the loan when a grant is planned |
| Cropland | Ground-mount solar on Cropland (7 CFR 718.2) ineligible | Screen the site first |
| Foreign components | Components from a foreign adversary under 15 CFR 791.4 make the system ineligible | Country-of-origin list for every component |
| Sizing | Ground-mount systems must match historical energy use; storage up to 120% of prior annual use | Load analysis is required |
| Economics | Simple payback must not exceed useful life | Payback is an eligibility test |
| Locations | One location per application | One site per application |
| Exclusions | EV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projects | Keep them out of the grant budget |
| Installers | Licensed in the state, at least three similar installations; procurement under 2 CFR 200.318 to 200.327 | Installer qualifications in the file |
| Competition | No state competitions; one for requests of $20,000 or less and one national | Scoring factors drive the narrative |
Two consequences matter most. The REAP guaranteed loan under 7 CFR 5001 is the up-front construction money, and the grant is competitive and paid later, so a lender should underwrite the project without it. As of 7 November 2026 no new REAP funding notice under the rule had appeared in the Federal Register.
When a study is required
Part 5001 treats REAP and B&I guaranteed loans alike here: above $1,000,000 to a business without operating history, 7 CFR 5001.306(a)(3)(i) calls for an outside study, by an author and to a scope the Agency approves. Most farm and small-business solar systems are smaller, so the study is at the Agency's discretion (5001.306(a)(3)(ii)), and the REAP rule's own requirements, the load analysis, the payback test, 12 months of data and the installer's qualifications, are in practice what the study must document.
Solar and renewable energy in West Virginia: market evidence
West Virginia: solar and other renewable power generation, supply and rural footprint
| Measure | West Virginia | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 0 (n/a) | 405 → 942 |
| Per 100,000 residents (2023) | 0.0 | 0.3 |
| Share of state population in non-metro counties (2025) | 38.4% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
West Virginia: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 0 | $0 | 0 | $0 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 2 | $823,500 | 0 | $0 |
| FY2024 to FY2026 | 0 | $0 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $411,750. West Virginia had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
The supply table is empty for a structural reason: Census counts businesses with paid employees whose main activity is selling generated power, and on-site solar owned by farms, stores or plants is counted under those owners' industries. Utility-scale plants may also report under parent companies elsewhere. The two SBA loans, $823,500 in FY2020 to FY2023, are the state's whole record under solar generation codes. The national SBA record is tiny and poor: 4 of 31 seasoned FY2010 to FY2016 loans were charged off, 12.9%, on average about 51 months after approval, and FY2020 to FY2026 loans averaged $478,591. Neighbouring states show the same Census pattern on a small scale, with 6 to 27 generators each.
Solar and other renewable generation in West Virginia and neighbouring states (each state's own pack; Census CBP 2023 and SBA FOIA data)
| State | Generators, 2023 | Per 100,000 residents | Employees each | SBA 7(a) loans since FY2010 | Average 7(a) loan FY2020 to FY2026 |
|---|---|---|---|---|---|
| West Virginia | 0 | 0.0 | 0.0 | 2 | $411,750 |
| Virginia | 27 | 0.3 | 8.4 | 4 | $25,000 |
| Kentucky | 6 | 0.1 | 17.0 | 0 | none |
| Ohio | 18 | 0.2 | 5.7 | 5 | $196,600 |
| Pennsylvania | 7 | 0.1 | 9.1 | 0 | none |
| Maryland | 18 | 0.3 | 4.0 | 7 | $75,000 |
REAP activity is the better evidence
REAP awards, FY2024 to FY2026: West Virginia and neighbours (USAspending; counts and dollars come from different endpoints and are not divided)
| State | REAP grants (count) | REAP loans (count) | REAP grant dollars | Grant dollars per resident |
|---|---|---|---|---|
| West Virginia | 78 | 4 | $9,933,936 | $5.54 |
| Virginia | 57 | 1 | $10,574,605 | $1.23 |
| Kentucky | 136 | 1 | $20,997,356 | $4.66 |
| Ohio | 268 | 0 | $45,916,364 | $3.89 |
| Pennsylvania | 340 | 1 | $60,772,255 | $4.67 |
| Maryland | 78 | 0 | $10,442,570 | $1.69 |
| United States (all places of performance) | 6,722 | 75 | $1,038,085,809 | $3.11 |
West Virginia's REAP grant dollars per resident are the highest in the group, ahead of Pennsylvania ($4.67) and Kentucky ($4.66) and well ahead of Virginia ($1.23) and Maryland ($1.69). The four REAP guaranteed loans are more than any neighbour recorded in the period. That is the clearest sign in the inputs that rural West Virginia businesses and farms are building energy projects with USDA support, and that lenders and installers in the state know the program. Under the new rule those borrowers will need the guaranteed loan, or their own cash, to build before any grant is paid.
Evidence the study must build
For a REAP-financed system, the study's evidence is mostly engineering and accounting: 12 months of pre-installation utility bills and interval data where available; a load analysis showing the system is sized to historical use; a production estimate from the site's orientation, shading and equipment specifications, later reconciled to 12 months of meter data; the utility's net metering or interconnection terms and tariffs; site ownership or a lease of at least 12 months before the Project Period; a Cropland screen for ground-mount systems; a country-of-origin list for every component; installer licences and three similar installations; procurement documentation; and the simple payback calculation against useful life.
Revenue model, costs and capital items
For behind-the-meter systems, the revenue is avoided energy and demand charges, valued at the tariff the business actually pays, plus any credits for exported power under the utility's terms. The model builds savings by month, applies panel degradation, and tests tariff changes. For a system that sells power, revenue is contracted or tariff sales. Costs are insurance, monitoring, maintenance, inverter replacement reserves, and any lease payments. Capital items are modules, inverters, racking, electrical work, interconnection, permits, engineering, monitoring equipment and, where justified by the load analysis, storage up to the rule's 120% limit.
Rural footprint and B&I eligibility in West Virginia
No generators are placed by county, so there is no Census footprint. REAP eligibility rests on the applicant being a rural small business or agricultural producer under the program's rules, which this page does not restate; for B&I-financed generation, 7 CFR 5001.3 excludes only cities above 50,000 and their contiguous urbanized areas, and no West Virginia city reaches that size in the 2025 estimates. Projects near Charleston (46,117) or Huntington (44,815) should be checked on the USDA map. The West Virginia state hub lists those near-line cities and the state's REAP counts.
Financing benchmarks: REAP and B&I terms
FY2026 REAP and B&I guaranteed loan terms for West Virginia solar (91 FR 11272 and Part 5001)
| Term | REAP guaranteed loan | B&I guaranteed loan |
|---|---|---|
| Guarantee | 80% | 85% under $5 million; 80% from $5 million to $25 million |
| Upfront fee | 1.0% of the guaranteed amount | 3.0%; reduced-fee option 1.0% with 80% |
| Annual retention fee | 0.25% | 0.55% |
| Guarantee before construction completion | Additional 0.50% fee (91 FR 11272) | Additional 0.50% fee |
| Maximum share of cost | Grant plus loan at most 75% of project cost (REAP rule) | Equity rules of 5001.105(d) |
| Term | Useful life, up to 40 years; no balloon (5001.402) | Same |
| Equity, new business | 20% balance sheet or 25% of project cost (5001.105(d)(4)) | Same |
Worked example (illustrative)
Inputs. An illustrative $600,000 solar system for a rural business, financed two ways under the rule effective 16 October 2026. Case 1 seeks no grant and borrows the maximum REAP guaranteed loan, 75% of cost. Case 2 plans to apply for the maximum 25% grant after 12 months of operation, so grant plus loan may not exceed 75% and the loan is capped at 50%. Both use an illustrative 7.00% fixed rate over 20 years, not a quote, within 5001.401 and 5001.402, and the FY2026 REAP fees. The 25-year useful life is illustrative; the actual figure comes from the equipment and the Agency.
| Line | Case 1: REAP guaranteed loan only | Case 2: REAP grant planned, loan capped |
|---|---|---|
| Project cost (illustrative rural business system) | $600,000.00 | $600,000.00 |
| REAP grant (at most 25% of cost and $500,000; paid only after 12 months of operating data) | $0.00 (none sought) | $150,000.00 (planned, competitive) |
| REAP guaranteed loan (grant plus loan at most 75% of cost) | $450,000.00 | $300,000.00 |
| REAP guarantee, FY2026: 80% (91 FR 11272) | $360,000.00 | $240,000.00 |
| Upfront guarantee fee (1.0% of guaranteed) | $3,600.00 | $2,400.00 |
| First-year retention fee (0.25% of guaranteed; upper bound) | $900.00 | $600.00 |
| Illustrative rate and amortization | 7.00% fixed, 20 years, monthly | 7.00% fixed, 20 years, monthly |
| Monthly principal and interest | $3,488.85 | $2,325.90 |
| Annual debt service | $41,866.14 | $27,910.76 |
| Annual energy savings or sales needed for 1.25x coverage | $52,332.68 | $34,888.45 |
| Annual debt service if the rate is 2 points higher | $48,585.20 | $32,390.13 |
| Owner cash at closing (cost less loan) | $150,000.00 | $300,000.00 |
| Owner cash after a grant arrives, if awarded | No grant | $150,000.00 |
| New business test: 25% of project cost (5001.105(d)(4)) | $150,000.00 | $150,000.00 |
| Simple payback test: annual savings needed so payback does not exceed an illustrative 25-year useful life | $24,000.00 | $24,000.00 |
| Study compulsory for a new business? (5001.306(a)(3)(i)) | No; at $1,000,000 or less the Agency may require one | No; at $1,000,000 or less the Agency may require one |
Reading the cases. Case 1 needs $52,332.68 of annual savings or sales to cover debt service 1.25 times, which is the binding test; the payback rule needs only $24,000.00 a year to keep payback within a 25-year life. The owner puts in $150,000.00 at closing, which also meets the 25% new-business equity test. Case 2 halves the debt service to $27,910.76, but the owner must fund $300,000.00 at closing and wait at least a year, and then win a national competition, before $150,000.00 of grant can come back. A lender will size the loan on Case 2's economics without counting the grant.
What a lender-grade solar feasibility study in West Virginia must prove
- Twelve months of pre-installation energy data and a load analysis matching the system size to historical use.
- A production estimate from site-specific engineering, with degradation, and a plan to reconcile it with 12 months of meter data.
- Savings valued at the tariff the business actually pays, with the utility's export and interconnection terms documented.
- Simple payback within useful life, shown as an eligibility test.
- The Cropland screen for ground-mount systems and a component country-of-origin list.
- Site control for at least 12 months before the Project Period, and one location per application.
- Installer licences, three similar installations and procurement under 2 CFR 200.318 to 200.327.
- Debt service coverage without the grant, under lower production, lower tariffs and a higher rate.
Solar risks in West Virginia
| Risk | Why it bites here | How the study tests or mitigates it |
|---|---|---|
| Grant timing | The grant is paid only after 12 months of data and is competitive | Underwrite without it; bridge financing plan |
| Tariff and export terms | Savings depend on the utility's rates and export credits | Tariff sensitivity; utility documentation |
| Sizing rules | Ground-mount systems must match historical use | Load analysis before design |
| Cropland and siting | Ground-mount on Cropland is ineligible | Site screen first |
| Supply chain | Foreign-adversary components make the system ineligible | Component origin list |
| Thin finance record | 2 SBA loans; national seasoned loss rate 12.9% | Conservative production; equipment warranties |
Sequence and common reasons for return
Settle the lender and the REAP strategy first; the study then follows the lender's and the rule's requirements, and the lender files the guaranteed loan application with the USDA Rural Development state office serving West Virginia. Applicants should gather utility bills, interval data, site plans, equipment specifications and origin documents, installer qualifications, interconnection correspondence, site control, financial statements and ownership records. Solar studies are sent back for production taken from a vendor quote without engineering, savings priced at a blended rate rather than the real tariff, missing load analysis, and loan sizing that counts on a grant not yet awarded.
Program record, honestly labelled
The inputs give REAP award counts and grant dollars for West Virginia but no individual project, so none is described. In FY2024 to FY2026 the state recorded 78 REAP grants, 4 REAP guaranteed loans and $9,933,937 of REAP grant obligations on USAspending; how many were solar is not broken out.
Hiring a USDA solar feasibility study consultant in West Virginia
Most West Virginia solar projects sit under the $1,000,000 line, so the study is usually the Agency's or lender's requirement rather than the compulsory case in 7 CFR 5001.306(a)(3)(i). Under the new REAP rule it has become more important, because the loan now carries the project and the payback, sizing and data tests are eligibility conditions. A USDA feasibility study consultant who works from interval data and the actual tariff, rather than a vendor's production quote, is what makes the loan application hold together.
| Engagement on the site's cost and timeline page | Fee range | Delivery |
|---|---|---|
| REAP study, loan under $600,000 | $4,900 to $8,500 | 4 to 5 weeks |
| REAP study, guaranteed loan over $600,000 | $7,500 to $11,500 | 5 to 7 weeks |
| B&I standard (larger generation project) | $6,900 to $12,500 | 6 to 7 weeks |
| Rush | 20% to 35% premium | 3 to 4 weeks |
Engineering and grant application drafting are separate scopes by the site's terms. The study itself covers the five Part 5001 components, the payback and coverage tests with sensitivity cases, a revision round and the written acceptance commitment.
Twelve months of utility bills, the site, the system concept, the installer and the lender are what the first call needs; book it free and expect a reply within a day.
Last updated 2026-11-08