    Wood products are one of the few industries where West Virginia is twice the national norm. The state had 143 wood product manufacturers in 2023, 8.1 for every 100,000 residents against 4.1 nationally, and 76.7% of those placed by county operate in non-metro counties, more than in any neighbouring state. Randolph, Pocahontas, Upshur, Greenbrier and Braxton Counties carry the industry. Yet the public loan record is nearly empty: SBA has made one 7(a) loan to a West Virginia wood products business since FY2010. A sawmill, flooring, pallet or engineered-wood project therefore enters a deep, rural supply chain with almost no local lending benchmarks, and the feasibility study has to carry the evidence a lender would otherwise take from past files.

    Data current as of November 2026.

    Program fit for a West Virginia wood products plant

    RouteFit for a West Virginia mill or plantWhat to check first
    USDA B&I guaranteeNew mills, expansions, kilns, equipment upgrades, acquisitions and working capital for rural plants85% guarantee under $5 million, 80% to $25 million (91 FR 11272); 7 CFR 5001.3 parcel test
    SBA 7(a)Equipment and working capital; 1 West Virginia wood products loan since FY201075% guarantee above $150,000 (13 CFR 120.210)
    SBA 504Owner-occupied plant and long-life equipment; none in the West Virginia pack10% borrower typical, 15% for new or single-purpose (120.900, 120.910)
    REAPEnergy efficiency, or renewable systems such as biomass using mill residues, at an operating plantGrant at most 25% of cost and $500,000 for renewable systems, after 12 months of data under the rule effective 16 October 2026
    Conventional bankEstablished mills with timber and buyer contractsShorter terms; heavy equipment discounts

    Part 5001 screens the owners first. 7 CFR 5001.127(a) excludes a wood products company whose business, controlling person or any non-passive owner above the 20 percent mark faces a federal court judgment still open (Tax Court excepted), owes past-due federal taxes or federal debt, or has been debarred or suspended; settling by instalments does not restore eligibility until the debt is paid. Family-owned mills with several generations of owners should check every owner above the threshold early. Paragraph (d) excludes income from illegal products.

    The study rule and two provisions that matter for mills

    For a new company with a guaranteed loan above $1,000,000, 7 CFR 5001.306(a)(3)(i) makes an independent study a condition, with an Agency-approved author and an Agency-defined scope; below that, or for an operating mill, it is the Agency's call (5001.306(a)(3)(ii)). Two more provisions are relevant. Above $1,000,000 with more than 50 new jobs, the Department of Labor must concur (5001.306(a)(1)). And under 5001.105(d)(2) a new business with sales contracts that cover debt service for at least the loan term needs only 10% equity, which makes multi-year lumber, pallet or flooring supply agreements valuable at closing.

    Sawmills and wood products in West Virginia: market evidence

    West Virginia: wood product manufacturing, supply and rural footprint

    MeasureWest VirginiaUnited States
    Establishments, 2019 → 2023138 → 143 (+3.6%)14,223 → 13,899
    Per 100,000 residents (2023)8.14.1
    Average employees per establishment32.331.1
    Average annual pay per employee$46,972$57,420
    Share of establishments in non-metro counties76.7% (89 in 15 counties)
    Share of state population in non-metro counties (2025)38.4%

    Non-metro counties with the most wood product manufacturing (2023): Randolph County (14); Greenbrier County (8); Pocahontas County (8); Upshur County (8); Braxton County (7); Mercer County (7).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    The industry is large for the state and rural by nature, but it is changing. The establishment count rose 3.6% while the nation's fell 2.3%, and plants average 32.3 employees, about the national 31.1. Pay of $46,972 is 18.2% below the U.S. level of $57,420 and 27.8% below the state's all-manufacturing average of $65,021. The trend table shows the sharper story: wood products employment fell -20.1% between 2019 and 2023, from 5,782 to 4,621, while average pay rose +22.6%. More plants with fewer workers suggests mechanisation and smaller operations replacing larger ones. A reviewer will ask about log supply and price, lumber price cycles, the plant's buyers and contracts, and whether the labour plan reflects a workforce that shrank by a fifth in four years.

    Sawmills within West Virginia wood products (computed from the Census CBP state files)

    SegmentEstablishments 2019Establishments 2023ChangeEmployees 2023Employees per establishmentAverage pay 2023
    All wood product manufacturing (321)138143+3.6%4,62132.3$46,972
    Sawmills (321113)5959+0.0%1,25421.3$38,613

    West Virginia wood products employment and pay, 2019 and 2023 (computed from the Census CBP state files)

    Measure20192023Change
    Wood product plants138143+3.6%
    Paid employees5,7824,621-20.1%
    Average pay per employee$38,305$46,972+22.6%
    Payroll per establishment$1,604,928$1,517,888-5.4%

    How West Virginia compares with its neighbours

    Wood product manufacturing in West Virginia and neighbouring states (each state's own pack; Census CBP 2023 and SBA FOIA data)

    StatePlants, 2023Per 100,000 residentsChange 2019 to 2023Employees eachAverage payNon-metro share (placed)SBA 7(a) loans since FY2010Average 7(a) loan FY2020 to FY2026
    West Virginia1438.1+3.6%32.3$46,97276.7%1$3,209,300
    Virginia4114.7-6.2%32.2$55,18949.7%29$614,833
    Kentucky3587.9+0.8%30.7$45,84070.6%45$509,091
    Ohio5734.9+1.8%24.7$51,23353.0%158$497,208
    Pennsylvania9817.5+0.4%21.5$51,24439.6%72$535,507
    Maryland1232.0+13.9%26.5$56,2638.3%14$1,383,680

    Only Kentucky comes close to West Virginia's density (7.9 against 8.1), and no neighbour has as rural an industry. The lending column is where West Virginia stands apart: Ohio has 158 SBA wood products loans since FY2010, Pennsylvania 72, Kentucky 45 and Virginia 29; West Virginia has one. Nationally, FY2020 to FY2026 wood products 7(a) loans averaged $766,800, and 7.1% of 1,015 seasoned FY2010 to FY2016 loans were charged off, on average about 65 months after approval, a loss rate above manufacturing as a whole. Those national numbers, together with neighbouring states' experience, are the benchmarks a West Virginia lender will use.

    Evidence a study must build when the loan record is empty

    Without local loan files, the study has to document the business directly: log supply within an economic haul radius, with timber ownership, harvest levels and existing mills competing for the same logs; log purchase agreements or procurement history; buyer contracts, letters of intent or sales history by product and grade; price series for the products sold and the logs bought, over a full cycle; quotes for the saw line, kilns, planer and handling equipment; a staffing plan with recruitment evidence in the county; and residue markets for chips, sawdust and bark. Interviews with operating mills, where they will talk, add yield and cost benchmarks that no public dataset provides.

    Revenue model, costs and capital items

    Revenue is board feet or units by product and grade, times price, plus residue sales, built from log input, recovery rates and kiln capacity. Costs are logs delivered to the yard (usually the largest line), labour by shift, saw and knife maintenance, energy for kilns and equipment, trucking, insurance and administration. Payroll per West Virginia wood products plant averaged $1,517,888 in 2023. Capital items are land and yard, the saw line, edger and trimmer, dry kilns, planer mill, log and lumber handling equipment, mobile equipment, residue handling, buildings, fire protection, and working capital to carry log inventory and lumber drying.

    Rural footprint and B&I eligibility in West Virginia

    The county file places 116 plants, and 89 of them (76.7%) operate in 15 non-metro counties: 13.1 per 100,000 non-metro residents against 2.5 in metro counties. Sawmills alone are even more rural, with 32 of the 38 placed in non-metro counties.

    Wood product plants by county, 2023 (computed from CBP 2023 county counts and Vintage 2025 population)

    CountyStatus (OMB 2023)Plants, 2023Residents, 2025Per 100,000 residents
    Randolph CountyNon-metro1426,88252.1
    Pocahontas CountyNon-metro87,602105.2
    Upshur CountyNon-metro823,75833.7
    Greenbrier CountyNon-metro831,57825.3
    Braxton CountyNon-metro711,88558.9
    Nicholas CountyNon-metro723,84829.4
    Mercer CountyNon-metro757,50312.2
    Barbour CountyNon-metro615,41438.9
    Raleigh CountyMetro671,7758.4
    Preston CountyMetro534,00414.7
    Jefferson CountyMetro563,1027.9

    B&I eligibility under 7 CFR 5001.3 depends on the site being outside any city of more than 50,000 and the urbanized area contiguous to it. West Virginia has no city that large in the 2025 estimates, and wood products plants sit overwhelmingly in counties without a town of 10,000, so eligibility is rarely the obstacle; a parcel check on the USDA map is still part of the file. Only two cities, Charleston and Huntington, come near the line; both appear on the West Virginia state hub.

    Financing benchmarks: USDA B&I next to SBA

    West Virginia: SBA lending to wood product manufacturing

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20160$00$0
    FY2017 to FY20190$00$0
    FY2020 to FY20230$00$0
    FY2024 to FY20261$3.2 million0$0

    Average 7(a) loan, FY2020 to FY2026: $3.2 million. West Virginia had fewer than 30 seasoned 7(a) loans for wood product manufacturing; nationally, 7.1% of 1,015 FY2010 to FY2016 loans were charged off, on average 65 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    One loan of $3.2 million in FY2024 to FY2026 is the state's entire SBA wood products record, so the "average" in the pack is that one loan. It does show the scale a modern mill upgrade reaches. For benchmarking, the national FY2020 to FY2026 average of $766,800 and the neighbouring states' averages, roughly $497,000 to $615,000 in Ohio, Kentucky, Pennsylvania and Virginia, are more useful, along with the national seasoned loss rate of 7.1%.

    FY2026 B&I terms applied to a West Virginia wood products plant

    TermRule and sourceReading for a West Virginia mill
    Guarantee85% under $5 million; 80% from $5 million to $25 million (91 FR 11272)A single mill upgrade usually sits at 85%
    Upfront fee3.0% of the guaranteed amount; reduced-fee option 1.0% with 80% (91 FR 11272)Financed in the budget if needed
    Annual retention fee0.55% of the guaranteed outstanding balance (91 FR 11272; 5001.455)Fixed at obligation
    TermUseful life up to 40 years; no balloon (5001.402)Saw lines and kilns over 10 to 15 years; buildings longer
    Equity, new mill20% balance sheet or 25% of project cost (5001.105(d)(4)); 10% with debt-service-covering sales contracts (5001.105(d)(2))Multi-year buyer contracts cut equity sharply
    Equity, operating mill10% under 5001.105(d)(1)Upgrades and expansions
    CollateralAppraisal over $250,000; going-concern value deducted before discounting (5001.203)Used mill equipment discounts heavily
    JobsDepartment of Labor concurrence above $1,000,000 and 50 jobs (5001.306(a)(1))Build into the schedule

    Worked example (illustrative)

    Inputs. One state loan cannot set a benchmark, so Loan A is $770,000, near the national FY2020 to FY2026 wood products average of $766,800, for equipment at an operating mill, amortized over 10 years. Loan B is $3,200,000, about the size of the state's one recent loan, for a new or rebuilt mill with saw line, kilns and buildings, amortized over 15 years to reflect the equipment-heavy mix. A hypothetical 7.50% fixed rate is applied to each (for arithmetic only), which 5001.401 and 5001.402 allow, along with FY2026 fee rates. Equity rows assume no other debt; the wage line uses the state wood products average of $46,972.

    LineLoan A: near the national wood products 7(a) averageLoan B: illustrative new or rebuilt mill
    Illustrative rate and amortization7.50% fixed, 10 years, monthly7.50% fixed, 15 years, monthly
    Loan amount$770,000.00$3,200,000.00
    B&I guarantee, FY2026 (91 FR 11272)85%85%
    Guaranteed amount$654,500.00$2,720,000.00
    Unguaranteed portion held by the lender$115,500.00$480,000.00
    Upfront guarantee fee (3.0% of guaranteed)$19,635.00$81,600.00
    First-year retention fee (0.55% of the guaranteed share of the full balance; upper bound)$3,599.75$14,960.00
    Retention fee on the balance after 12 monthly payments$3,348.45$14,398.80
    Monthly principal and interest$9,140.04$29,664.40
    Annual debt service$109,680.43$355,972.75
    Net operating income for 1.25x coverage$137,100.54$444,965.93
    Cushion above 1.00x$27,420.11$88,993.19
    Cushion in full-time wages at the state wood products average ($46,972)0.58 positions1.89 positions
    Interest-only year, if structured (5001.402)$57,750.00$240,000.00
    Annual debt service if the rate is 2 points higher$119,563.34$400,982.28
    Coverage at that rate on the same income1.15x1.11x
    Coverage if income lands 10% below plan1.12x1.12x
    New business: 25% of project cost (5001.105(d)(4))$256,666.67 on a $1,026,666.67 project$1,066,666.67 on a $4,266,666.67 project
    New business: 20% balance sheet equity (debt to equity 4:1)$192,500.00$800,000.00
    Existing business: 10% of project cost (5001.105(d)(1))$85,555.56 on a $855,555.56 project$355,555.56 on a $3,555,555.56 project
    Reduced-fee option: upfront fee (1.0% of an 80% guarantee)$6,160.00$25,600.00
    Study compulsory for a new business? (5001.306(a)(3)(i))No; the Agency may require one (5001.306(a)(3)(ii))Yes, above $1,000,000
    Application track (5001.306)Full application (over $600,000)Full application (over $600,000)
    SBA 7(a) comparison: guaranteed share, amount and fee ceiling (120.210, 120.220)75%, $577,500.00, $20,212.5075%, $2,400,000.00, $87,500.00
    New business with debt-service-covering sales contracts: 10% of project cost (5001.105(d)(2))$85,555.56$355,555.56

    Reading it. Loan B needs $444,965.93 of net operating income at 1.25x, and its $88,993.19 cushion is about 1.89 mill wages. Lumber prices are the real exposure: a mill selling several million board feet a year can lose that cushion to a modest price decline, which is why the study must test a full price cycle. The 15-year amortization raises annual debt service to $355,972.75; a rate two points higher brings coverage to 1.11x. A new company with qualifying buyer contracts needs $355,555.56 of equity rather than $1,066,666.67.

    What a lender-grade sawmill feasibility study in West Virginia must prove

    1. Log supply within the haul radius, with competing mills, harvest levels and procurement evidence.
    2. Buyers by product and grade, with contracts or letters of intent and the share of output each takes.
    3. Price assumptions for logs and products across a full cycle, with a low-price case.
    4. Recovery rates and throughput from equipment specifications and comparable mills.
    5. Labour by shift, with recruitment evidence where county employment in the industry has been falling.
    6. Residue markets and disposal costs.
    7. Capital costs from vendor quotes, with installation, kiln and fire-protection costs.
    8. Coverage under lower lumber prices, higher log costs, lower throughput and a higher rate.

    Wood products risks in West Virginia

    RiskWhy it bites hereHow the study tests or mitigates it
    Price cyclesLumber prices swing more than most manufactured goodsFull-cycle price series; low-price case
    Empty local loan record1 SBA loan statewide since FY2010National and neighbour benchmarks; primary evidence
    LabourEmployment down -20.1% from 2019 to 2023Recruitment plan; automation in capital budget
    Log competitionMills cluster in a few counties, such as Randolph with 14 plantsHaul-radius supply analysis
    Equipment collateralSpecialised mill equipment discounts heavilyGuarantee and owner guarantees; modest loan-to-cost
    National loss rate7.1% of seasoned wood products SBA loans charged offEquity above minimum; contracted sales

    Process, documents and reasons for return

    Mill owners should settle the lender first; the study follows that lender's scope, and a B&I lender then sends it on, as part of its application, to the USDA Rural Development state office serving West Virginia. Sponsors provide log procurement records or agreements, buyer contracts, equipment quotes and layouts, a contractor estimate, site control and permits status, environmental and air permits where required, management experience, and three years of statements for an operating mill. Studies are returned for log supply asserted rather than measured, prices from a single peak year, recovery rates from equipment brochures, and missing working capital for log and lumber inventory.

    Program record, honestly labelled

    The inputs include no West Virginia wood products plant financed under B&I, so this page does not name one. Statewide, USAspending lists 8 B&I guaranteed loans across all industries for FY2024 to FY2026, against 643 nationally; how many went to wood products is not shown.

    Hiring a USDA sawmill feasibility study consultant in West Virginia

    New mill companies borrowing more than $1,000,000 under B&I must file an independent study accepted by the Agency; operating mills financing upgrades face Agency or lender discretion. In a state with one SBA wood products loan on record, a lender has little to compare against, so a USDA feasibility study consultant who can build log supply and price-cycle analysis from primary sources is what makes the credit readable.

    Engagement, per the site's cost and timeline pageFee rangeDelivery
    B&I standard (single site, $1 million to $10 million)$6,900 to $12,5006 to 7 weeks
    B&I complex (over $10 million, unusual asset, limited comparables)$10,500 to $14,5007 to 9 weeks
    REAP study, guaranteed loan over $600,000 (for residue energy projects)$7,500 to $11,5005 to 7 weeks
    Rush delivery20% to 35% premium3 to 4 weeks

    A mill with limited local comparables may price in the complex band. Every engagement includes the five Part 5001 components, projections with sensitivity tables, a revision round and the written acceptance commitment.

    Mills ready to move should gather the site, product plan, log supply evidence, budget and lender name and ask for a free consultation; replies come within a day, per the site.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    When must a West Virginia sawmill commission a feasibility study?

    When a mill company without operating history seeks a B&I guarantee on more than $1,000,000; 7 CFR 5001.306(a)(3)(i) then makes the study mandatory and lets the Agency define it. For established mills and loans at or below that amount, the Agency decides. With only one SBA wood products loan in the state since FY2010 and a national loss rate of 7.1%, most lenders will want a study even when the rule does not demand it. Above $1,000,000 and 50 jobs, Department of Labor concurrence is also needed.

    What does a sawmill feasibility study consultant charge?

    The site's cost page prices a standard single-site B&I study at $6,900 to $12,500 and complex engagements at $10,500 to $14,500. A West Virginia mill with little local comparable data, or a loan above $10 million, may fall in the complex band. A REAP study for a residue-fired energy system with a guaranteed loan over $600,000 is listed at $7,500 to $11,500. Fees are fixed in the written proposal before signing.

    How long does a sawmill feasibility study take?

    Plan on a month and a half to two months; the cost page quotes 6 to 7 weeks for standard B&I work and 7 to 9 for complex. Log supply analysis and buyer interviews usually take the longest, so sponsors with procurement records and buyer letters in hand shorten the schedule. A three-to-four-week rush is available for a 20% to 35% premium if analysts are free.

    Who can prepare a feasibility study for a mill?

    Somebody the Agency accepts as independent, meaning no ownership in the mill and no role in selling it equipment or logs. Equipment suppliers' throughput figures and log brokers' supply estimates can feed the study but cannot replace it. The consultant should be able to model recovery rates, kiln capacity and lumber price cycles for a rural West Virginia site. The lender submits the finished study with its application.

    How long is a sawmill feasibility study valid?

    Nothing in Part 5001 dates a study out. Lumber markets do it instead: the cost page cites USDA's preference for data under 18 months old, and appraisals expire after a year (5001.203). Because lumber prices move quickly, a mill study should be refreshed after any large price swing, the loss of a major buyer, or a competing mill opening or closing within the log haul radius.

    Can one study serve an SBA lender and USDA?

    It can. A report meeting USDA's five-part standard, by an author with no stake, is also what an SBA lender usually wants when it invokes 13 CFR 120.160(b). SBA-only reports tend to be narrower and need technical and economic chapters added for USDA. Since neighbouring states' wood products plants have used SBA far more than West Virginia's, a study usable by either lender widens the field of possible lenders.

    Why does West Virginia have so many wood products plants but almost no SBA loans?

    The data show both facts, not the reason. The state has 8.1 wood products plants per 100,000 residents, twice the national rate, but only one SBA 7(a) loan since FY2010, against 158 in Ohio and 72 in Pennsylvania. Many West Virginia mills may finance through banks, equipment lenders or owners' capital. For a new project, the gap means a lender has few local files to compare, so the study must supply the evidence.

    Can a mill use REAP for a biomass boiler or kiln energy?

    An operating mill that qualifies as a rural small business can apply for REAP for energy efficiency or a renewable system, such as one using its own residues. The October 2026 rule caps the grant at a quarter of project cost and $500,000 for renewable systems, requires a year of operating data from the finished system before the application, and limits grant and guaranteed loan together to three-quarters of cost. Lenders should underwrite the project without counting on the grant.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee, retention fee and guarantee percentage for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, December 11, 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USDA RBCS, Rural Energy for America Program final rule with comment period, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    10. USAspending.gov prime award counts for Assistance Listings 10.768, 10.766 and 10.868, place of performance West Virginia, FY2024 to FY2026: https://www.usaspending.gov/search
    11. USDA Feasibility Study Consultants, cost and timeline page (fees, phases, rush terms, data recency): https://usda-feasibility-study.com/usda-feasibility-study-cost
    12. Wood products packs for Virginia, Kentucky, Ohio, Pennsylvania and Maryland (Census CBP 2023 and SBA FOIA data), used for the labelled neighbour comparison.

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours