USDA Feasibility Study for Solar and Renewable Energy (REAP) in Wisconsin

    NAICS 221114

    Wisconsin's solar market is a REAP market, and the REAP rule changed on 16 October 2026. USAspending records 248 REAP grants and 2 REAP guaranteed loans in Wisconsin from FY2024 to FY2026, while the Census finds just 5 businesses whose main activity is solar or other renewable power generation, 0.1 per 100,000 residents against 0.3 nationally. The gap tells the story: Wisconsin solar is mostly farms and rural small businesses installing systems for their own use, not power companies. Under the new rule a REAP grant covers at most 25% of project cost, up to $500,000 for renewable systems, and is available only after the system has been built and operated for 12 months. A Wisconsin solar project therefore has to be financed and justified on its own economics first, and the feasibility study is where that case is made.

    Data current as of November 2026.

    The REAP rule effective 16 October 2026, applied to a Wisconsin project

    USDA published the final rule with comment period on 1 October 2026 (91 FR 62600), effective 16 October 2026, after rescinding the FY2025 to FY2027 funding notice in April 2026 (91 FR 20090). As of 7 November 2026 no new REAP funding notice under the rule had appeared. The terms that matter most for a Wisconsin farm or rural business:

    TopicRule effective 16 October 2026What it means in Wisconsin
    TimingProject Period ends 12 to 24 months before the application (12 to 36 in the first window)Build first with a loan or cash; apply for the grant later
    Data12 months of actual production and 12 months of pre-installation dataUtility bills from before installation must be kept
    Award size$1,500 minimum; $500,000 maximum for renewable systems; $250,000 for efficiencyLarge dairy or processing arrays get a smaller share
    Cost shareGrant at most 25% of costThe old 50% share no longer applies
    Combined capREAP grant plus REAP guaranteed loan at most 75% of costLimits the loan when a grant is planned
    CroplandGround-mount solar or wind on Cropland (7 CFR 718.2) ineligibleField arrays on crop ground are out; roofs and non-crop land are in
    ComponentsAny component from a foreign adversary (15 CFR 791.4) ineligibleCountry of origin list for panels, inverters, racking
    SizingGround-mount sized to historical use; storage up to 120% of prior annual useLoad analysis from the farm's meter history
    EconomicsSimple payback must not exceed useful lifePayback is an eligibility test
    ExclusionsEV chargers, retail energy dispensing, stand-alone storage, distribution-onlyScope them out
    ApplicantOne application per federal fiscal year per highest-level owner group; site controlled 12 months before the Project PeriodRelated farms cannot each apply
    InstallersState-licensed, at least three similar installations; procurement under 2 CFR 200.318 to 200.327Installer selection is documented
    CompetitionNo state competitions: one for requests of $20,000 or less, one national for all othersWisconsin projects compete nationally

    Source: FACTS_REAP_RULE.md, from 91 FR 62600 (1 Oct 2026).

    The REAP guaranteed loan under 7 CFR 5001 remains available for up-front costs, at an 80% guarantee, a 1.0% upfront fee and 0.25% annual retention in FY2026 (91 FR 11272). Under Part 5001's general rule a study is mandatory only for a new business borrowing above $1,000,000 (5001.306(a)(3)(i)), but the new rule's payback, sizing and data tests mean every application now needs the analysis a study contains.

    Three hub statements should be weighed carefully. The hub says that since an August 2025 USDA letter, wind and solar projects are ineligible for B&I; that any applicant with gambling income is ineligible for REAP under the new rule; and that USDA is not currently accepting REAP grant applications. None of these is in the verified rule summary used here, so a sponsor should confirm each with USDA or the lender. The hub also points to PACE Wisconsin, the state's Commercial PACE program, as another path for energy work.

    Solar and renewable generation in Wisconsin: market evidence

    Wisconsin: solar and other renewable power generation, supply and rural footprint

    MeasureWisconsinUnited States
    Establishments, 2019 → 20234 → 5 (+25.0%)405 → 942
    Per 100,000 residents (2023)0.10.3
    Average employees per establishment8.412.3
    Average annual pay per employee$128,000$138,631
    Share of state population in non-metro counties (2025)25.4%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Computed: Wisconsin renewable generators by type (Census CBP state files)

    Generator type (NAICS)20192023
    Solar electric power generation (221114)not reported5 establishments, 42 employees
    Biomass electric power generation (221117)4 establishments, 44 employeesnot reported

    The small total hides a complete change of composition: the four 2019 generators were biomass plants, and the five in 2023 are solar (computed from the raw state files; categories absent from the file are either zero or not published). No establishment can be placed by county, so the pack has no rural share. Nationally the class more than doubled, from 405 to 942. For a lender this means there are almost no Wisconsin solar operating companies to benchmark against, and the relevant evidence is the performance of on-site systems at farms and businesses, which the Census does not count as a separate industry.

    Regional comparables (other states' figures, labelled)

    Computed: renewable generators and REAP activity in Wisconsin and neighbouring states (each state's pack; USAspending FY2024 to FY2026)

    StateGenerators 2019 → 2023Density per 100k residentsSBA 7(a) loans since fiscal 2010REAP grants fiscal 2024 to 2026REAP loans fiscal 2024 to 2026
    Wisconsin4 → 50.132482
    Minnesota (MN pack)8 → 90.285440
    Iowa (IA pack)0 → 70.225860
    Illinois (IL pack)11 → 310.254596
    Michigan (MI pack)25 → 300.322251

    Wisconsin recorded fewer REAP grants than Minnesota, Iowa or Illinois in the same three years, though more than Michigan (USAspending counts, which may be incomplete). REAP guaranteed loans were rare everywhere: nine across the five states. That matters under the new rule, because the guaranteed loan is now the REAP tool that finances construction, and lenders across the region have little experience with it.

    National benchmarks

    The pack's national loss line is stark: 12.9% of 31 FY2010 to FY2016 SBA 7(a) loans to renewable generators were charged off, on average 51 months after approval, the highest loss rate of any Wisconsin asset class on this site, on a small sample. Wisconsin's own record is three 7(a) loans in FY2020 to FY2023 averaging $426,667. US-wide, FY2020 to FY2026 loans to the class averaged $478,591 (7(a)) and $638,588 (504), taken from the pack's national columns.

    Rural footprint and eligibility in Wisconsin

    REAP guaranteed loans follow Part 5001's rural definition, so a system cannot sit in a city that counted over 50,000 people in 2020 or in that city's adjoining urbanized area; which in Wisconsin excludes Milwaukee, Madison, Green Bay and nine other cities listed on the Wisconsin USDA page. Agricultural producers face different location rules under REAP that are not covered in this page's sources, so confirm them with USDA. Within the rural area, the binding Wisconsin constraint is the cropland exclusion: a ground-mount array on land that counts as Cropland under 7 CFR 718.2 is ineligible, so roof-mounted systems on barns, freestalls, processing plants and shops are the natural candidates.

    Financing benchmarks

    Wisconsin: SBA lending to solar and other renewable power generation

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20160$00$0
    FY2017 to FY20190$00$0
    FY2020 to FY20233$1.3 million0$0
    FY2024 to FY20260$00$0

    Average 7(a) loan, FY2020 to FY2026: $426,667. Wisconsin had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    What a REAP solar study must document when there are no local comparables

    • Twelve months of pre-installation energy data from the meter, and a load analysis showing the system is sized to historical use.
    • A production estimate for the site, later reconciled with 12 months of actual metered output.
    • Site screening: whether any ground-mount area is Cropland under 7 CFR 718.2, roof condition and structural capacity for roof arrays.
    • Component origin list for every panel, inverter and racking part, against the 15 CFR 791.4 foreign adversary test.
    • Installer credentials: state licence and three similar installations, and procurement records.
    • Simple payback against the documented useful life of the equipment.
    • Ownership map to show the highest-level owner group has filed no other REAP application in the fiscal year.

    Worked example (illustrative)

    Inputs: an illustrative $600,000 roof-mounted system at a Wisconsin farm or rural business, larger than the state's three SBA solar loans and chosen to show the caps. The REAP guaranteed loan is at an assumed 6.5% fixed over 20 years with monthly payments, terms within 5001.401 and 5001.402. FY2026 REAP guarantee terms: 80%, 1.0% upfront, 0.25% retention on the balance after 12 payments. Path A plans for a later 25% grant, so the loan is held to 50% of cost to stay within the 75% combined cap; Path B uses the loan alone at 75%.

    Computed: a Wisconsin REAP solar project with and without a later grant (Python, exact to the cent)

    LinePath A: loan plus later grantPath B: loan only
    Project cost$600,000.00$600,000.00
    Maximum REAP grant (25%), paid after 12 months of operation$150,000.00none planned
    REAP guaranteed loan$300,000.00$450,000.00
    Owner cash at construction$300,000.00$150,000.00
    Owner cash after the grant is paid$150,000.00$150,000.00
    Guaranteed amount at 80%$240,000.00$360,000.00
    Upfront guarantee fee, 1.0%$2,400.00$3,600.00
    Monthly payment, 6.5%, 20 years$2,236.72$3,355.08
    Annual debt service$26,840.63$40,260.95
    First-year retention fee, 0.25%$584.87$877.31
    Annual savings or income needed for 1.25x$33,550.79$50,326.19
    Simple payback on $600,000 at that level17.88 years11.92 years

    The comparison shows how the rule reshapes a project. Path A needs only $33,550.79 a year of energy savings to cover its loan at 1.25x, but the owner must fund $300,000 at construction and wait at least a year for a competitive grant that may not come; a lender should underwrite it without the grant. Path B halves the owner's construction cash to $150,000 but needs $50,326.19 of annual savings, and the payback test then favours it: 11.92 years at that savings level, against 17.88 years for Path A's minimum. Under either path the owner ends with 25% of cost in the project, because grant plus guaranteed loan cannot exceed 75%.

    Hiring a USDA solar feasibility study consultant in Wisconsin

    A REAP guaranteed loan to a new business above $1,000,000 requires an Agency-scoped study; smaller REAP loans and grants still need the payback, sizing and data evidence the rule now demands. Choose a USDA feasibility study consultant that is separate from the installer and the panel supplier, able to reconcile production estimates with meter data and to read the rule's ownership and component tests.

    The site's REAP price bands are $4,900 to $8,500 over four to five weeks for REAP projects with loans under $600,000, and $7,500 to $11,500 over five to seven weeks where the guaranteed loan exceeds $600,000; grant application drafting is not part of the study. Each fee is set in a written proposal; the work spans all five Part 5001 tests, the energy and payback analysis and a financial model, with revisions without charge until acceptance. Bring 12 months of utility bills before installation, the installer's proposal and credentials, the component list with origins, site and roof information, and any lender term sheet. The national USDA renewable energy feasibility study page has the program detail; request a fixed-fee REAP proposal, which the contact page commits to answering within one business day.

    Wisconsin REAP precedents (as listed on the hub, all before the new rule)

    • Dairyland Biogas LLC, New Franken, Brown County (REAP, 2024, $500,000): efficiency equipment on an anaerobic digester.
    • Abel Project LLC, Eden, Fond du Lac County (2024): a $2,194,234 B&I guarantee, a $25,000,000 REAP guarantee and a $1,000,000 REAP grant for a dairy digester, 8 jobs.
    • A Marion cabinet shop (REAP solar, $13,200): covering 89% of the shop's energy use.

    These awards predate the 16 October 2026 rule; the $1,000,000 grant exceeds today's $500,000 maximum, and the hub reports a 2026 USDA pause on biodigester guarantees. They show Wisconsin's REAP history, not current terms.

    National program example (outside Wisconsin): the site's Pennsylvania REAP solar case study analyses commercial rooftop solar financing.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Is a feasibility study needed for a Wisconsin REAP solar project?

    Under Part 5001 the independent study is compulsory only where a start-up's REAP or B&I guaranteed loan tops $1,000,000. Below that, the rule effective 16 October 2026 still requires 12 months of production data, sizing to historical use and a simple payback within useful life, so the analysis a study contains is needed for almost every application.

    What does a solar feasibility study consultant cost for a Wisconsin REAP project?

    The site lists $4,900 to $8,500 for REAP projects with loans under $600,000 and $7,500 to $11,500 where the guaranteed loan is larger. The fee is fixed before work begins. Grant application drafting, engineering and interconnection studies are separate.

    How long does a REAP solar study take?

    Four to five weeks for a smaller REAP project and five to seven weeks for a guaranteed loan above $600,000, by the cost page. Under the new rule the grant itself cannot be sought until the system has run for 12 months, so the study often supports the loan that builds the system first.

    Who can prepare a solar study for USDA?

    USDA must accept the consultant as qualified, and the consultant cannot hold any interest in the installation contract, the equipment or the loan. The installer's production model is an input that the study checks against the site's meter history.

    How long is a REAP solar study valid?

    No fixed term applies. The site's cost page puts USDA's evidence window at about 18 months, but REAP grant applications now depend on 12 months of actual operating data, so the analysis is updated with real production before a grant is requested.

    Can a Wisconsin solar project get a B&I guarantee?

    The Wisconsin hub states that since an August 2025 USDA letter, wind and solar projects are ineligible for B&I. That statement is not in the verified rules used here, so confirm it with USDA. The REAP guaranteed loan under 7 CFR 5001 remains the USDA loan for renewable systems.

    How does the 25% grant cap change a Wisconsin project budget?

    On a $600,000 system the grant can be at most $150,000, paid after a year of operation, and grant plus REAP loan cannot exceed $450,000. If a grant is planned, the loan is held to $300,000 and the owner funds $300,000 at construction, recovering $150,000 only if the grant is awarded.

    Can a Wisconsin dairy farm still use REAP for solar?

    Yes, on barns, roofs and non-crop ground. Ground-mount arrays on land classed as Cropland under 7 CFR 718.2 are ineligible, systems must be sized to the farm's historical use, and components from foreign adversaries are excluded. The hub's Wisconsin precedents show heavy past REAP use by dairy operations.

    Does gambling income affect REAP eligibility in Wisconsin?

    The hub says any applicant with gambling income, including lottery commissions, is ineligible under the new REAP rule. That is not in the verified rule summary used here, so a c-store, tavern or other business with such income should confirm its position with USDA before investing in an application.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. USDA RBCS, Rural Energy for America Program final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026: https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    6. USDA RBCS, Notice of Rescission of Funding Opportunity for REAP, 91 FR 20090 (15 Apr 2026): https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm
    7. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    8. 91 FR 11272, OneRD annual notice of guarantee and retention fees and guarantee percentages for FY2026: https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    9. USAspending.gov, prime awards by assistance listing 10.868 (REAP), FY2024 to FY2026: https://www.usaspending.gov/
    10. USDA Feasibility Study Consultants, Wisconsin state page (REAP precedents, B&I solar statement, PACE Wisconsin, program pauses as the site reports them): https://usda-feasibility-study.com/wisconsin
    11. USDA Feasibility Study Consultants, cost and timeline page: https://usda-feasibility-study.com/usda-feasibility-study-cost
    12. USDA Feasibility Study Consultants, contact page: https://usda-feasibility-study.com/contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.