Wood products are the most rural manufacturing in Wisconsin. Of the 503 wood products plants the 2023 Census county file places, 273 (54.3%) are in non-metro counties, more than double the 25.4% of residents who live there, and the leading counties read like a map of the northern and central forests: Marinette (16), Shawano (14), Clark (13), Dunn and Wood (12 each), Price (11). Statewide the count is 521 plants, 8.8 per 100,000 residents against 4.1 nationally, employing 20,282 people at 38.9 per plant. Sawmills proper number 102. The state hub describes a forest products and paper base across the Northwoods that the Business and Industry (B&I) program finances, and REAP support for kilns and mill energy. For a new mill or a modernisation, the feasibility study ties log supply, product markets and equipment lives together.
Data current as of November 2026.
When a Wisconsin mill needs a study, and which program fits
The state's average SBA 7(a) loan for wood products from FY2020 to FY2026 was $877,183 and the 504 average $1,008,615, which straddles the line that matters. A newly organised mill company asking for more than $1,000,000 of B&I-guaranteed credit falls under 7 CFR 5001.306(a)(3)(i): an independent, qualified consultant must prepare a study whose scope USDA sets. A family mill replacing a headrig or adding a kiln is an existing business, so the study is at the Agency's discretion under 5001.306(a)(3)(ii); projects of $600,000 or less can use the short application.
B&I suits mills well: it lends against land, buildings and equipment for terms set by useful life up to 40 years (5001.402), guarantees 85% under $5 million in FY2026, and allows working capital for log inventory. SBA made 156 Wisconsin wood products loans since FY2010 worth $111.4 million (computed), mostly 7(a). REAP is the energy tool the hub highlights for kilns and mill energy systems, but the 16 October 2026 rule now requires that an applicant has operated the system for 12 months before applying, the grant covers at most 25% of cost (maximum $500,000 for renewable systems), and REAP grant plus guaranteed loan can reach no more than 75% of cost. Biomass or residue energy components should also be checked against the hub's report of a 2026 USDA pause on biodigester guarantees, which does not cover other biomass systems but signals Agency caution.
Owners of 20% or more must clear the federal debt, tax, judgment and debarment checks in 5001.127(a).
Wood products in Wisconsin: market evidence
Wisconsin: wood product manufacturing, supply and rural footprint
| Measure | Wisconsin | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 530 → 521 (-1.7%) | 14,223 → 13,899 |
| Per 100,000 residents (2023) | 8.8 | 4.1 |
| Average employees per establishment | 38.9 | 31.1 |
| Average annual pay per employee | $56,267 | $57,420 |
| Share of establishments in non-metro counties | 54.3% (273 in 37 counties) | |
| Share of state population in non-metro counties (2025) | 25.4% |
Non-metro counties with the most wood product manufacturing (2023): Marinette County (16); Shawano County (14); Clark County (13); Dunn County (12); Wood County (12); Price County (11).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Computed: sawmills and the wider wood products base (Census CBP state and county files)
| Measure | 2019 | 2023 |
|---|---|---|
| Sawmills (NAICS 321113), establishments | 104 | 102 |
| Sawmill employees | 1,844 | 1,932 |
| Sawmill average pay | $40,604 | $50,648 |
| All wood products, average pay | $42,461 | $56,267 |
| Wood products plants per 100k residents, counties outside metro areas (2023) | n/a | 18.01 |
| Wood products plants per 100,000 residents, metro counties (2023) | n/a | 5.16 |
Wisconsin's wood industry is stable in count and growing in payroll. Plants fell 1.7% from 2019 to 2023, slightly less than the national 2.3% drop, while employment rose 4.5% to 20,282 (computed). The sawmill subsector held almost flat at 102 mills, with 4.8% more workers. Plants are larger than the US average (38.9 workers against 31.1), and in rural Wisconsin they are three and a half times as dense as in metro counties.
Pay is the number that has moved. Average wood products pay rose 32.5% in four years to $56,267, and sawmill pay rose 24.7% to $50,648 (computed). A mill pro forma built on pre-2020 wages will understate labour cost by a quarter or more. In a county such as Clark or Price, where wood plants are among the largest private employers, recruiting a second shift can be harder than selling the lumber.
A reviewer will ask first about log supply (volumes, species, distance, contracts), then product markets and price cycles, then whether the equipment schedule and useful lives support the term requested.
Rural footprint and B&I eligibility in Wisconsin
Rural status for B&I is decided by 7 CFR 5001.3, which leaves out only cities that topped 50,000 people in the 2020 count and the urbanized land adjoining them. For mills that test is rarely a problem, since the industry's centre of gravity is in counties without any such city. The exceptions are in metro counties: Marathon County has 30 wood products plants, Milwaukee 24, Brown and Outagamie 20 each. Wausau, the Marathon County seat, counted 39,994 in 2020 per the hub, below the line, and the hub screens its area as eligible; sites near Green Bay or Appleton need a parcel check. The Wisconsin USDA page lists all twelve excluded cities.
Financing benchmarks: USDA B&I next to SBA
Wisconsin: SBA lending to wood product manufacturing
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 76 | $43.5 million | 15 | $12.4 million |
| FY2017 to FY2019 | 16 | $10.6 million | 1 | $1.1 million |
| FY2020 to FY2023 | 25 | $22.9 million | 11 | $11.3 million |
| FY2024 to FY2026 | 10 | $7.8 million | 2 | $1.8 million |
Average 7(a) loan, FY2020 to FY2026: $877,183. Average 504 loan: $1.0 million. Of the 76 7(a) loans approved in FY2010 to FY2016 for Wisconsin wood product manufacturing, 3.9% were charged off (national: 7.1% of 1,015), on average 74 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
B&I terms for a Wisconsin mill (FY2026 notice, 91 FR 11272; 7 CFR 5001)
| Term | Rule | Mill reading |
|---|---|---|
| Guarantee | 85% under $5 million; 80% from $5 million to $25 million | Most mill loans in the 85% tier |
| Fees | 3.0% upfront; 0.55% retention a year | $22,440 upfront on $880,000 |
| Term | Useful life, maximum 40 years, no balloon; interest-only allowed if the first full payment comes within 3 years (5001.402) | Saws and kilns shorter than buildings |
| Equity | Existing 10%; new 20% balance sheet or 25% of cost; 25% if the guarantee issues before construction completes (5001.105(d)) | Family mills modernising use the 10% test |
| Collateral | Appraisal over $250,000; discounts justified; going-concern value deducted (5001.203, 5001.202) | Used mill equipment is discounted heavily |
| Working capital | Adequate working capital and reserves (5001.202) | Log inventory and seasonal harvest |
SBA's Wisconsin mill history carries a warning inside good news. Wisconsin's seasoned charge-off rate, 3 of 76 loans (3.9%), is barely half the national 7.1%, but those three losses were 5.3% of the dollars lent against 4.5% nationally (computed): the defaults were larger loans. In this industry the big modernisation, financed on optimistic volumes, is the riskier credit. Lending has been steady since 2020, with 35 7(a) and 13 504 loans. B&I adds what mills most need: long amortisation on buildings, an 85% guarantee and room for working capital. The fee table reflects the FY2026 notice; the FY2027 notice was not among the inputs and should be checked.
Worked example (illustrative)
Inputs: an $880,000 loan, just above the $877,183 average Wisconsin wood products 7(a) loan of the last seven fiscal years. An assumed 7.0% fixed rate with monthly payments, shown at three terms, because a mill's term is a blend of building life and equipment life under 5001.402. Year-one retention uses the principal still owed after twelve instalments of the 15-year version.
Computed: a Wisconsin mill loan at three terms (Python, exact to the cent)
| Line | 10 years | 15 years | 25 years |
|---|---|---|---|
| Monthly payment | $10,217.55 | $7,909.69 | $6,219.66 |
| Annual debt service | $122,610.55 | $94,916.27 | $74,635.88 |
| Cash flow needed for 1.25x | $153,263.19 | $118,645.33 | $93,294.85 |
Computed: fees, equity and stress on the 15-year case
| Line | Amount |
|---|---|
| Guaranteed amount at 85% | $748,000.00 |
| Upfront guarantee fee, 3.0% | $22,440.00 |
| First-year retention fee | $3,953.15 |
| Coverage at 9.0% instead of 7.0% | 1.108x |
| Coverage if cash flow falls 20% | 1.000x |
| New mill, 25% of project cost | $293,333.33 on $1,173,333.33 |
| Existing mill, 10% of project cost | $97,777.78 on $977,777.78 |
The term decision dominates. Financing the same $880,000 over 10 years instead of 25 raises annual payments by $47,974.67 (computed), and the cash flow needed for 1.25x from $93,294.85 to $153,263.19. A study that splits the capital budget into land and buildings (long life), heavy equipment and kilns (medium) and rolling stock (short) gives the lender the evidence to blend a term, rather than defaulting to the shortest. The equity gap is just as large: an existing mill modernising needs $97,777.78 under the 10% test, a new mill $293,333.33.
Wisconsin risks a sawmill study has to carry
- Log supply. Volumes, species and haul distances drive cost; supply letters or contracts and a fallback source belong in the study (stumpage sources and terms are not covered by the inputs).
- Price cycles. Lumber and pallet prices swing; the stress case should cut prices, not just volumes.
- Wages. Wood products pay rose 32.5% from 2019 to 2023 (computed); a second shift may not be staffable at old rates.
- Equipment collateral. Discounts must be justified under 5001.202; specialised saws and kilns have thin resale markets.
- Energy and REAP. Kiln energy is a large cost; REAP now pays only after 12 months of operation and caps the grant at 25% of cost, so the mill must finance the system first.
- Fire, dust and residue. Insurance, dust control and the outlet for chips and sawdust are operating costs to document (confirm locally).
What a lender-grade sawmill feasibility study in Wisconsin must prove
- Proof the mill parcel is rural under 5001.3, with the determination date.
- Log supply by species and volume, with suppliers, haul distances and price history.
- Product markets: grades, buyers, prices across a cycle, and residue sales.
- Process and capacity: headrig, resaw, kiln and planer throughput; the bottleneck and the recovery rate.
- A capital budget split by asset life to support a blended term.
- A labour plan by shift with local wage evidence.
- Working capital for log and lumber inventory, and quarterly cash flow if harvest is seasonal.
- Projections with coverage of 1.25x at stabilisation, stressed for price, volume and interest rate.
- Management experience and the global cash flow of the owners' related entities.
Hiring a USDA sawmill feasibility study consultant in Wisconsin
A new mill company borrowing above $1,000,000 must submit a study the Agency scopes; an existing mill is studied at the lender's or USDA's request. Either way, hire a USDA feasibility study consultant who holds no interest in the timber, the equipment, the building contract or the loan, and with the patience to check recovery rates and price cycles rather than accept a vendor's brochure.
The site's cost and delivery page quotes single-site B&I mill work in a range of $6,900 to $12,500, normally finished in six to seven weeks; projects over $10 million, phased modernisations or unusual products move to $10,500 to $14,500, finished in seven to nine weeks. Where the main ask is a REAP guaranteed loan above $600,000 for kiln or energy systems, the page lists $7,500 to $11,500 over five to seven weeks. The fixed fee includes all five Part 5001 components, market and competitor work, operator benchmarks, the management assessment and the Excel workbook, and the written acceptance guarantee keeps revisions free until approval. Provide equipment quotes and the layout, log supply letters, product buyer letters or sales history, the capital budget, financial statements for an operating mill and the bank's indicative terms. The national USDA sawmill feasibility study guide sets out the program detail. Request a fixed-fee proposal for the mill. According to the contact page, a senior analyst responds by the next business day.
Program example
The Wisconsin hub lists no B&I-financed sawmill. It does cite a related REAP award: a $13,200 REAP solar grant that covers 89% of a Marion cabinet shop's energy use. That award predates the REAP rule effective 16 October 2026 and illustrates how a small wood products business used REAP, not current grant terms. National program example (outside Wisconsin): the site's Pennsylvania sawmill case study analyses a hardwood mill modernisation under B&I.
Last updated 2026-11-08