    Food manufacturing is growing twice as fast in Tennessee as in the nation: the state had 383 food plants outside the meat sector in 2023, 71 more than in 2019, a 22.8 percent rise against 11.5 percent nationally. The plants are big, averaging 75 employees, and a quarter of them sit in non-metro counties where USDA Business and Industry (B&I) guarantees apply. A food processing feasibility study in Tennessee must show that a new or expanding plant has buyers, a supply of raw product and a cost structure that covers debt, and the hub ties those questions to West Tennessee row crops, Middle Tennessee livestock and the beverage pipeline around the distilling sector.

    Food processing in Tennessee: market evidence

    Tennessee: food manufacturing (excluding meat), supply and rural footprint

    MeasureTennesseeUnited States
    Establishments, 2019 → 2023312 → 383 (+22.8%)24,589 → 27,414
    Per 100,000 residents (2023)5.48.1
    Average employees per establishment75.042.0
    Average annual pay per employee$60,173$58,248
    Share of establishments in non-metro counties24.4% (96 in 17 counties)
    Share of state population in non-metro counties (2025)21.1%

    Non-metro counties with the most food manufacturing (excluding meat) (2023): Sevier County (26); Cumberland County (9); Bedford County (6); Coffee County (6); Greene County (6); Putnam County (6).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    What the numbers say. Two signals pull in opposite directions. Tennessee has 34% fewer food plants per resident than the nation (5.4 against 8.1 per 100,000), which suggests room for processors serving in-state demand, and it is closing that gap quickly with growth twice the national rate. Its plants are also much larger than average, 75.0 employees against 42.0, and pay $60,173, slightly above the national $58,248; 2023 payroll per plant is $4,513,619 (computed from the pack). A new rural plant will usually be far smaller than that average, so the state means are a ceiling for staffing and a floor for wage competition, since large plants set the local rate. A reviewer will want to see named buyers or co-packing contracts, raw product supply with prices and volumes, and a labour plan that holds up next to the bigger employers in the commuting area.

    Rural footprint and B&I eligibility in Tennessee

    Food processing is slightly more rural than Tennessee's people: 96 plants in 17 non-metro counties, 24.4 percent of those Census can place, against 21.1 percent of residents, or 6.2 per 100,000 non-metro residents compared with 5.2 in metro counties (computed from the pack's county totals). Sevier County leads with 26, more than Cumberland, Bedford and Coffee combined; Greene and Putnam have six each. B&I eligibility is a separate, place-based test. Under 7 CFR 5001.3 a plant qualifies outside any city or town above 50,000 at the latest decennial census and outside the urbanized area contiguous and adjacent to it.

    The Tennessee hub counts fifteen cities over 50,000 at the 2020 Census, including Jackson in West Tennessee and Murfreesboro and Franklin in Middle Tennessee, and screens Shelbyville, Tullahoma, Paris, Dyersburg and Stanton as eligible. Food plants often prefer industrial parks at the edge of a larger town for utilities and labour, which is exactly where urbanized-area boundaries run, so a parcel-level map determination dated before the application belongs in the study.

    Program fit for a Tennessee food plant

    • B&I guarantee. Plant construction, expansion, equipment and working capital for an eligible processor, 85 percent guaranteed below $5 million and 80 percent up to $25 million.
    • SBA 7(a) for processors. Thirty-nine Tennessee food manufacturing 7(a) loans since FY2010 and no 504 loans, so the 504 route is untested here for this asset.
    • REAP. Energy efficiency at an operating plant, such as refrigeration or boiler upgrades, can draw a grant of up to 25 percent of cost and $250,000 under the 16 October 2026 rule, after 12 months of operating data; a REAP guaranteed loan can fund the up-front cost.
    • Guarantee pause the hub reports. USDA paused loan note guarantees across its business programs for biodigester and controlled-environment agriculture projects from 14 April to 31 December 2026, which matters for indoor growing or waste-to-energy components of a food project.
    • Borrower screens. 5001.127 rules out companies whose controlling or 20 percent owners have a federal judgment, delinquent federal tax or debt, or a debarment.

    Financing benchmarks: USDA B&I next to SBA

    Tennessee: SBA lending to food manufacturing (excluding meat)

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY201613$2.2 million0$0
    FY2017 to FY20199$3.2 million0$0
    FY2020 to FY20238$7.8 million0$0
    FY2024 to FY20269$4.0 million0$0

    Average 7(a) loan, FY2020 to FY2026: $693,394. Tennessee had fewer than 30 seasoned 7(a) loans for food manufacturing (excluding meat); nationally, 7.4% of 3,150 FY2010 to FY2016 loans were charged off, on average 60 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    B&I termFY2026 ruleFor a Tennessee food plant
    Guarantee85% under $5 million; 80% from $5 million to $25 millionSmall processors sit in the 85% tier
    Fees3.0% upfront; 0.55% a year (reduced 1.0% and 0.50% with an 80% guarantee)Budget both in the sources and uses
    Equity10% for a new business whose sales contracts cover debt service for the loan term; otherwise 20% balance-sheet or 25% of costCo-packing or supply contracts can cut the equity requirement
    TermUseful life, 40 years at most, no balloon; interest-only allowed if the first full payment falls within 3 yearsProcessing lines amortize faster than buildings
    ConstructionGuarantee before completion needs equity in first, a fixed-price contract and an independent budget check (5001.205(e)(2))Relevant to new plants
    StudyIndependent study required for a new business borrowing over $1 millionDiscretionary at the state's average loan size

    B&I terms summarised from 91 FR 11272 and 7 CFR 5001.105(d), 5001.205(e), 5001.306(a)(3) and 5001.402.

    What the record says. SBA food manufacturing loans in Tennessee are few and small: 17 in FY2020 to FY2026, $11.8 million, averaging $693,394, and none through 504. Nationally the asset has one of the higher seasoned loss rates in the SBA data, 7.4 percent of 3,150 loans, with failures arriving on average 60 months after approval, five years in. Within Tennessee's own 13 seasoned loans the pack's loan file shows one charge-off, too few for a rate. The national figure is the one a lender will use, and it argues for a study that stresses customer loss and input-cost spikes, not only the ramp-up. USAspending shows 13 Tennessee B&I guaranteed loans across all industries in FY2024 to FY2026.

    Worked example (illustrative)

    Inputs: a $690,000 B&I loan, the Tennessee average food manufacturing 7(a) loan rounded, at an illustrative 7.75% fixed rate over 15 years, to equip a newly formed processor in a leased building.

    Input or resultValueBasis
    Loan amount$690,000.00Tennessee FY2020 to FY2026 average food manufacturing 7(a) loan ($693,394), rounded
    Interest rate (illustrative, fixed)7.75%Negotiated between lender and borrower (7 CFR 5001.401)
    Term15 years, monthly payments, fully amortizingUseful life, 40 years at most, no balloon (5001.402)
    FY2026 B&I guarantee85%91 FR 11272
    Guaranteed amount$586,500.00Loan x guarantee percentage
    Unguaranteed amount (lender's own risk)$103,500.00Loan minus guaranteed amount
    Upfront guarantee fee (3.00%)$17,595.00Guaranteed amount x fee rate (5001.454)
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$20,527.5091 FR 11272
    First annual retention fee (0.55%)$3,107.24Guaranteed share of the balance after 12 payments x rate (5001.455)
    Monthly payment$6,494.80Level amortization
    Annual debt service$77,937.6312 x monthly payment
    NOI needed for 1.25x coverage$97,422.04Annual debt service x 1.25
    Coverage on that NOI if the rate were 2 points higher1.11xDebt service at 9.75%: $87,715.23
    New business, 25% of project cost route: equity / total cost$230,000.00 / $920,000.005001.105(d)(4)
    New business, 20% balance-sheet equity route (this loan the only debt)$172,500.005001.105(d)(4), debt-to-equity 4:1
    Existing business, 10% of project cost: equity / total cost$76,666.67 / $766,666.675001.105(d)(1)

    Computed in Python from the inputs shown; guarantee, fee and retention rates from 91 FR 11272; equity tests from 7 CFR 5001.105(d). Illustrative, not a quote or a commitment.

    Contract-backed equity. If the new company holds sales contracts that cover debt service and run at least as long as the loan, 5001.105(d)(2) lets it close with 10 percent equity: $76,666.67 on a $766,666.67 project, $153,333.33 less than the 25 percent route. Those contracts must actually cover $77,937.63 of annual debt service, and the study is where that is shown.

    Labour and production-day tests. An illustrative 25-person plant at the state's average pay carries $1,504,330.12 of payroll, about 15 times the 1.25x NOI target of $97,422.04. The gap between 1.25x and break-even is $19,484.41, roughly 1.3 percent of that payroll. Spread over 250 production days, the target is $389.69 of NOI a day.

    Stress. A fixed rate two points higher, 9.75%, lifts debt service to $87,715.23 and cuts coverage to 1.11x; including the first-year retention fee of $3,107.24, the 1.25x target becomes $101,306.09.

    How the numbers scale

    B&I loanFY2026 guaranteeGuaranteed amountUpfront fee (3.0%)Annual debt serviceNOI for 1.25xStudy rule for a new business (5001.306(a)(3))New-business equity at 25% of cost
    $690,00085%$586,500.00$17,595.00$77,937.63$97,422.04Agency may require$230,000.00
    $2,000,00085%$1,700,000.00$51,000.00$225,906.18$282,382.73Required, independent consultant$666,666.67
    $6,000,00080%$4,800,000.00$144,000.00$677,718.54$847,148.18Required, independent consultant$2,000,000.00

    Computed in Python at the same illustrative rate and term; guarantee tiers and fees from 91 FR 11272; study rule from 7 CFR 5001.306(a)(3). A plant-scale loan of $2,000,000 to a new company triggers the independent study, and above $5,000,000 the guarantee drops to 80 percent.

    What a lender-grade food processing feasibility study in Tennessee must prove

    1. Buyers: signed purchase or co-packing agreements, letters of intent, or distributor commitments, with volumes, prices and terms set against the loan term.
    2. Raw product supply: sources, contracts and price history for the crops, dairy, livestock products or other inputs, and what happens in a short crop year.
    3. Process and capacity: line speeds, yields, shifts and the utilisation needed to break even.
    4. Food safety and regulatory approvals required for the products and markets, with their timing built into the schedule.
    5. Labour: headcount by shift and wages against the $60,173 state average and the larger plants nearby.
    6. Capital costs from quotes, covering equipment, refrigeration, wastewater, building work and a contingency, with useful lives matching the term.
    7. Working capital for inventory and receivables through ramp-up, with quarterly cash flow if the guarantee issues before construction ends.
    8. Utilities: water, wastewater and power capacity at the site, priced by the provider.
    9. Eligibility: a 5001.3 map determination and, for any indoor-growing or biodigester component, the status of the 2026 pause.

    Risks and mitigants in Tennessee

    Customer concentration and input prices are the core risks, and the 60-month national loss timing says they show up after start-up. Labour competition is the Tennessee-specific risk: with plants averaging 75 workers, a new processor hires against established employers. Utility capacity, especially wastewater, can decide whether a rural site works at all. The hub's pause on guarantees for controlled-environment agriculture and biodigester projects through 31 December 2026 is a timing risk for integrated projects. Mitigants are contracts with creditworthy buyers, price pass-through clauses, conservative utilisation and an experienced operator.

    Process, documents and why studies come back

    The lender files with the Rural Development state office serving Tennessee, placed in Nashville by the hub. The sponsor supplies product specifications and process flow, buyer and supplier agreements or letters of intent, equipment quotes and layouts, utility confirmations, the construction or fit-out budget, management résumés and owners' financial statements, and for an existing company three years of statements. Food plant studies come back when sales rest on unsigned buyers, when raw product pricing is a single-year snapshot, when utilisation is assumed rather than built from line capacity, or when wastewater is left out of the capital budget.

    Program example: a Tennessee value-added grant to a meat business

    The hub's food processing entry cites a $199,309 Value-Added Producer Grant in 2026 to Light Hill Meats in Columbia for beef processing and marketing. It is a grant to a meat business under a different USDA program, not a B&I loan to a food plant, and it is reported on the hub rather than as an engagement of this firm. The hub's precedent file has no Tennessee B&I food processing guarantee.

    Hiring a USDA food processing feasibility study consultant in Tennessee

    A new business borrowing over $1,000,000 under B&I must submit a study by an independent, qualified consultant acceptable to the Agency, with a scope the Agency sets (7 CFR 5001.306(a)(3)(i)). At the $690,000 average loan size the study is discretionary under 5001.306(a)(3)(ii), but a new plant of any scale usually borrows more, and a lender facing the 7.4 percent national loss rate for this asset is likely to ask for one either way.

    The site's cost page names value-added food processing among the asset classes that need primary research. It prices standard B&I studies at $6,900 to $12,500 over six to seven weeks and complex ones at $10,500 to $14,500 over seven to nine weeks, with a three to four-week rush at a 20 to 35 percent premium; a value-added grant planning study is listed at $4,900 to $7,500. The B&I fee includes the five components, market and buyer analysis, competitive supply, comparable operator benchmarks, the five to ten-year projection and Excel model with sensitivity tables, a management assessment, one revision round and the written acceptance guarantee. Engineering, environmental work and construction estimating are separate.

    A food processing feasibility study consultant should show you before you sign how buyers, raw product and utilities will be evidenced. The USDA feasibility study consultant homepage explains how the firm works with lenders and the Agency, and the national food processing feasibility study for USDA financing page covers the asset across states. Use the contact page to send the product, site, capacity, project cost and lender status; a senior analyst answers within one business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Is a feasibility study required for a Tennessee food processing loan?

    Required by rule when a new business borrows more than $1,000,000 through B&I (5001.306(a)(3)(i)); otherwise the Agency may require one. Tennessee's average food manufacturing 7(a) loan was $693,394 in FY2020 to FY2026, under the line, but new plants usually borrow more. SBA lenders may also ask for a study under 13 CFR 120.160(b), especially for a first plant.

    What does a food processing feasibility study consultant cost in Tennessee?

    According to the cost page, a standard B&I study is $6,900 to $12,500 and a complex one $10,500 to $14,500, fixed in a written proposal; a value-added grant planning study is $4,900 to $7,500. New products without local comparables, multiple product lines or integrated growing and processing usually fall in the complex band. USDA's upfront fee on the $690,000 example is $17,595.00.

    How long does a food plant feasibility study take?

    Six to seven weeks for a standard B&I study and seven to nine for a complex one, per the cost page, or three to four weeks on a rush at a premium. Buyer interviews and supplier pricing often set the pace, so having letters of intent and equipment quotes ready before kick-off shortens the schedule.

    Who can prepare a food processing study for USDA?

    An independent, qualified consultant acceptable to the Agency, with no interest in the plant, the equipment sale or the loan. Equipment vendors, buyers and economic developers can provide data and letters, but not the study's conclusions. There is no USDA roster of approved preparers, so the Rural Development state office serving Tennessee judges each food plant application on its own file.

    How long is a food processing feasibility study valid?

    There is no expiry in Part 5001. The cost page treats data generally inside 18 months as USDA's working standard, and appraisals may not be more than a year old (5001.203). Commodity prices and buyer terms move faster than that, so update raw product pricing and buyer commitments if the study is more than a few months old at filing.

    Can one study support SBA and B&I food plant loans?

    Yes, if both lenders are named and both structures are modelled. On the $690,000 example, B&I guarantees $586,500.00 against $517,500.00 under 7(a), with a B&I fee of $17,595.00 against a 7(a) guaranty-fee ceiling of $15,525.00. Equity rules also differ: B&I's contract route can cut a new company's equity to 10 percent, which has no direct SBA equivalent in FACTS.md.

    Can sales contracts reduce the equity a new Tennessee processor needs?

    Yes. Under 5001.105(d)(2), a new business with sales contracts adequate to cover debt service and running at least as long as the loan needs 10 percent equity instead of 20 percent balance-sheet equity or 25 percent of cost. On the example that is $76,666.67 instead of $230,000.00. The contracts must be real, assignable evidence, and the study must show they cover debt service.

    Does the 2026 guarantee pause affect food processing projects?

    Only certain components. The hub reports that USDA paused loan note guarantees across its business programs for biodigester and controlled-environment agriculture projects from 14 April to 31 December 2026. A conventional processing plant is not named, but a project that includes indoor growing or a digester should confirm the pause's status and timing with the state office before the lender files.

    Why is Sevier County the leading rural county for food plants?

    The pack counts 26 food manufacturers in Sevier County, more than Cumberland, Bedford and Coffee combined, but the Census data do not say what they make. A study for a Sevier County site should identify the existing processors, their products and markets, and show whether the subject competes with them for labour, buyers or tourist sales.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD FY2026 guarantee fee, retention fee and guarantee percentage notice (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    8. REAP final rule, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    9. USAspending.gov prime award data by assistance listing 10.768, FY2024 to FY2026: https://www.usaspending.gov
    10. 2020 Census city list, eligible-town screen, sector context, the 2026 guarantee pause and the Light Hill Meats grant, as cited on the Tennessee hub
    11. Site pages: /usda-feasibility-study-cost and /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.