Tennessee has 19 refrigerated warehouses with a paid staff, fewer than in 2019, and Census cannot place a single one in a non-metro county. The SBA has financed one Tennessee cold storage loan since FY2010. For a sponsor, that scarcity cuts two ways: few competitors for a new facility, but almost no local evidence a lender can use to judge rent, utilisation or loss experience. A cold storage feasibility study in Tennessee therefore has to build its own evidence from customers, contracts and regional comparables before a USDA Business and Industry (B&I) guarantee will be issued. The hub frames the demand as first-mile and distribution capacity along the interstate freight corridors, including the rural edge of the Mid-South distribution hub and the Middle Tennessee freight corridors.
Cold storage in Tennessee: market evidence
Tennessee: refrigerated warehousing, supply and rural footprint
| Measure | Tennessee | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 20 → 19 (-5.0%) | 1,350 → 1,367 |
| Per 100,000 residents (2023) | 0.3 | 0.4 |
| Average employees per establishment | 67.3 | 48.4 |
| Average annual pay per employee | $51,396 | $56,901 |
| Share of establishments in non-metro counties | 0.0% (0 in 0 counties) | |
| Share of state population in non-metro counties (2025) | 21.1% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Scarcity is the finding. Nineteen warehouses for 7.3 million people is a thin network, a little below the national density (0.3 against 0.4 per 100,000), and the count slipped by one while the U.S. total edged up. The facilities that exist are large, 67.3 employees each against 48.4 nationally, with 2023 payroll of $3,459,789 per warehouse (computed from the pack), which describes distribution-scale public or private warehouses, not the small first-mile facilities a rural project might be. The zero non-metro share needs care: the county file publishes no cell with fewer than three establishments, so a county with one or two rural warehouses shows as nothing. What the data do prove is that there is no visible cluster of rural cold storage in Tennessee, no published local rent or utilisation benchmark and no seasoned SBA loss history. A lender will ask where every assumption comes from, and the answer has to be customers and contracts rather than market statistics.
Regional comparison
| State | Establishments 2019 → 2023 | Per 100,000 (2023) | Avg. employees | Avg. pay | Non-metro share | SBA 7(a) loans FY2010–26 | SBA 504 loans FY2010–26 | Avg. 7(a) loan FY2020–26 |
|---|---|---|---|---|---|---|---|---|
| Tennessee | 20 → 19 (-5.0%) | 0.3 | 67.3 | $51,396 | 0.0% | 1 | 0 | $995,000 |
| Georgia | 58 → 72 (+24.1%) | 0.7 | 93.2 | $57,904 | 0.0% | 0 | 0 | none |
| Kentucky | 13 → 13 (+0.0%) | 0.3 | 24.4 | $48,139 | 0.0% | 0 | 1 | none |
| Alabama | 21 → 20 (-4.8%) | 0.4 | 30.2 | $55,118 | 0.0% | 0 | 0 | none |
| Arkansas | 24 → 19 (-20.8%) | 0.6 | 55.4 | $52,006 | 23.1% | 1 | 0 | $5.0 million |
| Mississippi | 17 → 13 (-23.5%) | 0.4 | 14.1 | $46,350 | 0.0% | 0 | 0 | none |
Computed from each state's data pack (Census County Business Patterns 2019 and 2023; SBA 7(a) and 504 FOIA data as of 30 Sep 2026). Each row is that state's own figures; non-metro shares count only counties with three or more establishments.
Georgia is the regional outlier, with 72 refrigerated warehouses, 3.8 times Tennessee's count, up 24.1 percent since 2019, and an average of 93.2 employees each; it shows what a larger regional cold chain looks like. Kentucky, Alabama and Mississippi resemble Tennessee: between 13 and 20 facilities, no non-metro county cell, and no SBA 7(a) history. Arkansas is the only neighbour with a visible rural facility cluster, three warehouses in Pope County, 23.1 percent of its total, and its single 7(a) loan averaged $5.0 million. Across six states the SBA has made two cold storage 7(a) loans since FY2010, so regional lending history is almost as thin as Tennessee's. The useful regional lesson is about wages: Tennessee's $51,396 average sits in the middle of the neighbours' $46,350 to $57,904 range.
National benchmarks
Nationally, 1,367 refrigerated warehouses employed an average of 48.4 people at $56,901 each in 2023. SBA lending to the asset is rare everywhere: 38 7(a) loans in FY2010 to FY2016, of which 5.3 percent were charged off on average 76 months after approval, and 32 in FY2020 to FY2026 averaging $1,424,256, the figure used for the worked example below. That loss rate, set on a small national base, is the only seasoned benchmark a lender has.
Rural footprint and B&I eligibility in Tennessee
Eligibility for B&I is decided by place, not by the Census table. Under 7 CFR 5001.3 a site qualifies if it is outside every city or town above 50,000 at the 2020 Census and outside the urbanized area contiguous and adjacent to it. The Tennessee hub lists fifteen such cities, including Memphis, Nashville, Jackson and Clarksville, the logistics centres around which most of the state's existing cold storage presumably sits. A rural warehouse serving processors or growers must lie beyond those urbanized areas; a facility at an interstate interchange on the edge of a large city may not. The study should attach a dated USDA map determination.
The in-state demand base is better documented than the supply. The Tennessee packs count 383 food manufacturers outside the meat sector, 96 of them in non-metro counties, and 81 meat and poultry plants, 14 of them non-metro. Those are the customers a first-mile cold storage project would serve, and the study should identify specific ones.
Program fit for Tennessee cold storage
- B&I guarantee. The hub says B&I finances cold chain capacity across eligible counties: 85 percent guaranteed below $5 million and 80 percent up to $25 million.
- Contract-backed equity. A new business with storage or throughput contracts covering debt service for the full loan term can close with 10 percent equity under 5001.105(d)(2).
- SBA 7(a) and 504 for warehouses. One Tennessee cold storage 7(a) loan since FY2010 ($995,000 in FY2024 to FY2026) and no 504 loans.
- REAP. Refrigeration efficiency or solar at an operating warehouse can draw a grant of up to 25 percent of cost under the rule effective 16 October 2026, after 12 months of data; stand-alone battery storage is excluded.
- Guarantee pause. The hub reports that USDA paused loan note guarantees for biodigester and controlled-environment agriculture projects from 14 April to 31 December 2026; a conventional warehouse is not named, but an integrated growing project would be.
Financing benchmarks: USDA B&I next to SBA
Tennessee: SBA lending to refrigerated warehousing
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 0 | $0 | 0 | $0 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 0 | $0 | 0 | $0 |
| FY2024 to FY2026 | 1 | $995,000 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $995,000. Tennessee had fewer than 30 seasoned 7(a) loans for refrigerated warehousing; nationally, 5.3% of 38 FY2010 to FY2016 loans were charged off, on average 76 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
| B&I term | FY2026 rule | For a Tennessee cold storage project |
|---|---|---|
| Guarantee | 85% under $5 million; 80% from $5 million to $25 million | A distribution-scale warehouse may cross the tier line |
| Fees | 3.0% upfront; 0.55% a year (reduced 1.0% and 0.50% with an 80% guarantee) | Fixed costs in a high-utility business |
| Equity | 10% for a new business with debt-covering contracts as long as the loan; otherwise 20% balance-sheet or 25% of cost | Contracts can cut equity by two-thirds |
| Construction | Equity in before guaranteed funds; fixed-price contract; independent budget check (5001.205(e)(2)) | Refrigeration systems make contingency important |
| Term | Useful life, 40 years at most, no balloon | Insulated buildings last; compressors and controls do not |
| Study | Required for a new business borrowing over $1 million | Almost any new warehouse crosses it |
B&I terms summarised from 91 FR 11272 and 7 CFR 5001.105(d), 5001.205(e), 5001.306(a)(3) and 5001.402.
Worked example (illustrative)
Inputs: a $1,425,000 loan, the national FY2020 to FY2026 average refrigerated warehousing 7(a) loan rounded, since Tennessee has a single loan; an illustrative 7.50% fixed rate; 25 years; and a newly formed company building a 6,000-position first-mile facility near a cluster of processors.
| Input or result | Value | Basis |
|---|---|---|
| Loan amount | $1,425,000.00 | National FY2020 to FY2026 average refrigerated warehousing 7(a) loan ($1,424,256), rounded; Tennessee has one loan |
| Interest rate (illustrative, fixed) | 7.50% | Negotiated between lender and borrower (7 CFR 5001.401) |
| Term | 25 years, monthly payments, fully amortizing | Useful life, 40 years at most, no balloon (5001.402) |
| FY2026 B&I guarantee | 85% | 91 FR 11272 |
| Guaranteed amount | $1,211,250.00 | Loan x guarantee percentage |
| Unguaranteed amount (lender's own risk) | $213,750.00 | Loan minus guaranteed amount |
| Upfront guarantee fee (3.00%) | $36,337.50 | Guaranteed amount x fee rate (5001.454) |
| Upfront fee if the guarantee issues before construction is complete (+0.50%) | $42,393.75 | 91 FR 11272 |
| First annual retention fee (0.55%) | $6,567.55 | Guaranteed share of the balance after 12 payments x rate (5001.455) |
| Monthly payment | $10,530.62 | Level amortization |
| Annual debt service | $126,367.49 | 12 x monthly payment |
| NOI needed for 1.25x coverage | $157,959.36 | Annual debt service x 1.25 |
| Coverage on that NOI if the rate were 2 points higher | 1.06x | Debt service at 9.50%: $149,402.13 |
| New business, 25% of project cost route: equity / total cost | $475,000.00 / $1,900,000.00 | 5001.105(d)(4) |
| New business, 20% balance-sheet equity route (this loan the only debt) | $356,250.00 | 5001.105(d)(4), debt-to-equity 4:1 |
| Existing business, 10% of project cost: equity / total cost | $158,333.33 / $1,583,333.33 | 5001.105(d)(1) |
Computed in Python from the inputs shown; guarantee, fee and retention rates from 91 FR 11272; equity tests from 7 CFR 5001.105(d). Illustrative, not a quote or a commitment.
Per-pallet test. At 85 percent average utilisation the 1.25x NOI of $157,959.36 means $2.58 of NOI per occupied pallet position per month, after power, labour, maintenance, insurance and handling costs; at 70 percent it rises to $3.13. The 0.25x cushion is $31,591.87, and with the first-year retention fee of $6,567.55 the target becomes $166,168.80. At a rate two points higher, 9.50%, coverage on the same NOI drops to 1.06x.
Contract route. If anchor customers sign storage agreements covering debt service for the loan term, the new company's equity falls to $158,333.33 on a $1,583,333.33 project, $316,666.67 less than the 25 percent route's $475,000.00.
How the numbers scale
| B&I loan | FY2026 guarantee | Guaranteed amount | Upfront fee (3.0%) | Annual debt service | NOI for 1.25x | Study rule for a new business (5001.306(a)(3)) | New-business equity at 25% of cost |
|---|---|---|---|---|---|---|---|
| $1,425,000 | 85% | $1,211,250.00 | $36,337.50 | $126,367.49 | $157,959.36 | Required, independent consultant | $475,000.00 |
| $4,000,000 | 85% | $3,400,000.00 | $102,000.00 | $354,715.77 | $443,394.71 | Required, independent consultant | $1,333,333.33 |
| $8,000,000 | 80% | $6,400,000.00 | $192,000.00 | $709,431.53 | $886,789.41 | Required, independent consultant | $2,666,666.67 |
Computed in Python at the same illustrative rate and term; guarantee tiers and fees from 91 FR 11272; study rule from 7 CFR 5001.306(a)(3). At $4,999,999 the guarantee would be $4,249,999.15; at $5,000,000 it falls to $4,000,000.00.
What a lender-grade cold storage feasibility study in Tennessee must prove
With no local comparables, the study must assemble primary evidence:
- Named customers: letters of intent or signed storage and throughput agreements from processors, growers or distributors, with volumes, rates and terms.
- Product flows: what is stored, at which temperatures, for how long, and how seasonal volumes change through the year.
- Utilisation built from customers, not from a national occupancy figure, with a ramp from opening to stabilisation.
- Rates from quotes: storage, handling and blast-freezing charges benchmarked to facilities in Georgia, Kentucky or Arkansas where Tennessee has none.
- Power cost and supply: the utility's rate schedule, demand charges and backup generation, since energy is a leading cost.
- Refrigerant and safety compliance, with the system design and its regulatory requirements.
- Construction and equipment costs from a contractor and refrigeration vendor, with useful lives by component.
- Labour availability and wages around the $51,396 state average.
- Site eligibility under 5001.3 and truck access.
Risks and mitigants in Tennessee
Customer concentration is the main risk for a small market: losing one processor can cut utilisation by a third. Power cost is the second; a rate change can move NOI faster than storage prices can be raised. Construction risk is the third, because refrigeration systems are specialised. Mitigants are multi-year contracts with creditworthy customers, pass-through clauses for power, a fixed-price contract with an experienced builder and phased capacity.
Process, documents and why studies come back
Cold storage files go through the lender to the Rural Development state office serving Tennessee (in Nashville, per the hub). The sponsor supplies customer agreements or letters of intent, product and temperature requirements, the design and equipment specification, the construction contract or bids, utility rate confirmations, management résumés and owners' financial statements. Cold storage studies come back when utilisation is assumed rather than contracted, when power cost is estimated without the tariff, or when metro distribution rents are used for a rural first-mile facility.
National program example (outside Tennessee)
The hub lists no Tennessee cold storage financing. The site's national cold storage page cites Origo Cold Storage in Madera County, California: a $35 million USDA guaranteed loan paired with $17 million of C-PACE financing for a 254,000 square foot temperature-controlled facility, made under the since-discontinued Food Supply Chain program. It is a public financing reported by the site, outside Tennessee, and not presented as an engagement of this firm.
Hiring a USDA cold storage feasibility study consultant in Tennessee
Under 7 CFR 5001.306(a)(3)(i), a new business borrowing more than $1,000,000 with a B&I guarantee must provide a study by an independent, qualified consultant acceptable to the Agency, scoped by it. The $1,425,000 example crosses that line, and nearly any purpose-built cold storage facility will.
The site's cost page treats limited comparable data as a mark of a complex engagement, priced at $10,500 to $14,500 over seven to nine weeks; a standard B&I study runs $6,900 to $12,500 over six to seven weeks, and a three to four-week rush adds 20 to 35 percent. The fee includes the five Part 5001 components, customer and demand analysis, competitive supply, operator benchmarks drawn regionally where Tennessee has none, the projection and Excel model with sensitivity tables, one revision round and the written acceptance guarantee. Refrigeration engineering, environmental work and appraisals are separate.
A cold storage feasibility study consultant should be able to explain before you sign how utilisation will be evidenced without local comparables. The homepage introduces the role of a USDA feasibility study consultant for sponsors and lenders, and the national cold storage feasibility study for USDA financing page covers refrigerated warehousing in every state. Send the site, capacity, temperature zones, anchor customers, project cost and lender status through the contact page; you will get a reply within one business day.
Last updated 2026-11-08