USDA Feasibility Study for Food and Beverage Processing in Washington

    NAICS 311

    Washington grows the raw material for a food processing economy that most states cannot match. The hub reports that the state produced about 69% of the US apple crop in 2024, leads in sweet cherries and hops, ranks second in potatoes, and set a record $14.0 billion of agricultural production in 2023. Census counts 828 food manufacturing establishments outside meat in 2023, up 8.9% from 2019, at 10.6 per 100,000 residents against 8.1 nationally; 13.6% of them are in non-metro counties. A Business and Industry (B&I) guarantee fits rural processing well, and Washington's SBA loss record in the sector is far better than the national one. What a reviewer will test is whether a new plant has secured supply, customers and the seasonal working capital that fruit and vegetable processing demands.

    Data current as of November 2026.

    When a food plant needs a USDA feasibility study, and which program fits

    For a start-up processor the trigger is a B&I loan above $1,000,000: at that size 7 CFR 5001.306(a)(3)(i) obliges the borrower to file an outside study, and USDA both vets the author and dictates what the report covers. Smaller loans and expansions by operating processors are at the Agency's discretion under (a)(3)(ii). Loans of $600,000 or less can use the streamlined application in 5001.306(b), and Washington's recent food manufacturing 7(a) loans averaged $406,070, so most equipment loans sit there; a new building almost never does.

    B&I carries an 85% guarantee below $5 million and 80% from $5 million to $25 million in fiscal 2026 (91 FR 11272), and a new processor with long-term supply or sales contracts can qualify for the 10% equity test in 5001.105(d)(2). SBA lending is the familiar comparison: 230 Washington food manufacturing 7(a) loans and 22 SBA 504 loans since FY2010. REAP pays up to 25% of an efficiency or renewable project, such as refrigeration, compressed air or heat recovery, once it has run for twelve months under the rule effective 16 October 2026; the hub's precedents show Washington fruit packers using it. Producer-owned processing may also fit the Value-Added Producer Grant, which the site covers on its VAPG feasibility page. Community Facilities money is not for commercial plants.

    Two screens are specific to this sector. The hub reports that USDA paused loan note guarantees for controlled environment agriculture and biodigester projects from 14 April to 31 December 2026, so a greenhouse-integrated or digester-linked plant needs a different timetable. And B&I eligibility rules for agricultural production (5001.105(b)(7), revised in December 2025) mean that a grower's packing or processing operation should be organised and reported separately from the farm. Owner screens in 5001.127(a) and the illegal-products bar in 5001.127(d), which the hub applies to hemp and cannabis inputs, also apply.

    Food processing in Washington: market evidence

    Washington: food manufacturing (excluding meat), supply and rural footprint

    MeasureWashingtonUnited States
    Establishments, 2019 → 2023760 → 828 (+8.9%)24,589 → 27,414
    Per 100,000 residents (2023)10.68.1
    Average employees per establishment37.842.0
    Average annual pay per employee$58,203$58,248
    Share of establishments in non-metro counties13.6% (114 in 14 counties)
    Share of state population in non-metro counties (2025)10.2%

    Non-metro counties with the most food manufacturing (excluding meat) (2023): Grant County (17); Adams County (11); Pacific County (10); Clallam County (9); Klickitat County (9); Lewis County (9).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Washington has about 30% more food plants per resident than the country, which is what the hub's crop base would predict. Growth was solid at 8.9% but slower than the national +11.5%, so new entrants are adding to an established sector rather than filling a void, and a study should identify the specific product, customer or capacity gap it serves.

    Wages are at the national level, $58,203 against $58,248, which makes the Washington plant easier to benchmark than most of the state's industries. With 37.8 employees on average, payroll runs about $2,201,250 per plant. First-quarter payroll is 24.5% of the year for food manufacturing as a whole, close to flat, because large year-round plants dominate the total; fruit and vegetable lines that run during harvest will be far more seasonal, and their studies need monthly staffing.

    Computed: Washington food manufacturing by number of employees, 2023 (Census CBP state file, all of NAICS 311)

    Employees at the siteFood plants (all of NAICS 311)Share of sized sites
    1 to 430534.5%
    5 to 915617.6%
    10 to 1914716.6%
    20 to 4912213.8%
    50 to 99647.2%
    100 to 249606.8%
    250 to 499202.3%
    500 to 999101.1%

    Small plants are common, 34.5% with fewer than five employees, but 90 plants employ 100 or more. That spread lets a study find comparables at almost any scale, which a reviewer will expect it to do.

    Rural footprint and B&I eligibility in Washington

    Non-metro food manufacturing is led by Grant County (17), Adams (11), Pacific (10), Clallam, Klickitat and Lewis (9 each), and Adams County's 51.2 plants per 100,000 residents is the highest concentration in the state, nearly five times the state rate; the hub places frozen potato processing in the Columbia Basin. The larger fruit and vegetable districts sit in counties OMB classes as metropolitan: Yakima County (44 plants), Whatcom (57), Skagit (26), Franklin (16), Chelan (10) and Walla Walla (8).

    Computed: Washington counties with the most food manufacturing outside meat, 2023 (Census CBP county file; Vintage 2025 population; OMB July 2023 status)

    CountyOMB 2023 statusFood plants, 2023Residents, 2025Food plants per 100k residents
    King CountyMetropolitan2602,344,93911.1
    Snohomish CountyMetropolitan63870,6567.2
    Spokane CountyMetropolitan58558,34410.4
    Whatcom CountyMetropolitan57236,39224.1
    Pierce CountyMetropolitan56946,2885.9
    Yakima CountyMetropolitan44259,18517.0
    Clark CountyMetropolitan41532,1197.7
    Kitsap CountyMetropolitan30283,37410.6
    Skagit CountyMetropolitan26132,97519.6
    Thurston CountyMetropolitan23304,2617.6
    Benton CountyMetropolitan20221,7229.0
    Grant CountyNonmetropolitan17105,72716.1
    Franklin CountyMetropolitan16102,61215.6
    Adams CountyNonmetropolitan1121,48851.2

    That is why the non-metro share understates the opportunity. Under 7 CFR 5001.3, a site is rural if it lies outside cities of more than 50,000 at the 2020 Census and outside the urbanized area adjoining them, regardless of the county's OMB status, and the Agency cannot approve an application that depends on future qualification. The Washington state page screens Wapato, Toppenish, Zillah, Granger, Sunnyside and Grandview in the Yakima Valley, Quincy, Moses Lake, Wenatchee and Mount Vernon as eligible, and lists Yakima, Union Gap, Selah, Moxee and Naches, plus Pasco, Kennewick and Richland, as excluded. A plant in the lower Yakima Valley or the Columbia Basin can therefore be eligible while a plant on the edge of the Tri-Cities is not.

    Financing benchmarks: USDA B&I next to SBA

    Washington: SBA lending to food manufacturing (excluding meat)

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY201690$40.0 million11$10.0 million
    FY2017 to FY201944$25.6 million5$8.7 million
    FY2020 to FY202342$12.5 million4$2.9 million
    FY2024 to FY202654$26.5 million2$2.3 million

    Average 7(a) loan, FY2020 to FY2026: $406,070. Average 504 loan: $870,333. Of the 90 7(a) loans approved in FY2010 to FY2016 for Washington food manufacturing (excluding meat), 2.2% were charged off (national: 7.4% of 3,150), on average 52 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    The loss line is the most favourable fact on this page: two of 90 seasoned Washington food manufacturing 7(a) loans were charged off, 2.2% against 7.4% nationally, and losses came about 52 months in. Loan sizes are small and volatile, averaging $297,988 in fiscal 2020 to 2023 and $490,133 in 2024 to 2026, against a national $484,253 across both periods. SBA has evidently financed equipment and working capital more than plants, which leaves B&I as the natural tool for a new rural building, a line with land, or a cold chain addition, where the 85% guarantee and longer term matter.

    TermB&I ruleWhat it means for a Washington processor
    Guarantee85% under $5 million; 80% from $5 million to $25 million (91 FR 11272)Large potato or fruit lines can exceed $5 million and fall to 80%
    Fees3.0% upfront on the guaranteed portion (3.5% if the guarantee precedes construction completion); 0.55% annual retentionFold the fee into project cost
    TermUseful life to 40 years, no balloon (5001.402)Equipment-heavy loans often 10 to 15 years; buildings longer
    Equity with contracts10% if sales contracts cover debt service for the loan term (5001.105(d)(2))Co-packing and grower supply agreements can qualify
    Equity, other new plants20% balance sheet equity (4:1) or 25% of cost (5001.105(d)(4))The default for a speculative brand launch
    Credit evaluationQuarterly cash flow for seasonal borrowers (5001.202)Harvest-season inventory and payables must be modelled
    CollateralAppraisal over $250,000; specialised equipment discounted (5001.203)Single-purpose plants appraise below cost

    Worked example (illustrative)

    Inputs. Loan A is $400,000, Washington's FY2020 to FY2026 food manufacturing 7(a) average of $406,070 rounded, amortised over 15 years as an equipment loan. Loan B is an illustrative $2,500,000 new rural plant over 20 years. Both assume 7.50% fixed with monthly payments (an assumption within 5001.401 and 5001.402). The retention fee is computed on principal outstanding after the first year's twelve payments; equity rows count the guaranteed loan as the only debt.

    Computed: B&I terms on two Washington food processing loans (Python, exact to the cent)

    LineLoan A: Washington 7(a) average, 15 yearsLoan B: illustrative new plant, 20 years
    Loan amount$400,000.00$2,500,000.00
    Guarantee (fiscal 2026 notice)85%85%
    Guaranteed amount$340,000.00$2,125,000.00
    Lender's unguaranteed share$60,000.00$375,000.00
    Upfront guarantee fee$10,200.00 (3.0%)$63,750.00 (3.0%)
    Balance after 12 payments$384,994.56$2,443,920.32
    First annual retention fee$1,799.85 (0.55%)$11,425.33 (0.55%)
    Monthly principal and interest$3,708.05$20,139.83
    Annual debt service$44,496.59$241,677.96
    NOI for 1.00x (break-even)$44,496.59$241,677.96
    NOI for 1.25x$55,620.74$302,097.45
    Coverage if NOI falls 15%1.06x1.06x
    Coverage if the rate is 2 points higher1.11x1.08x
    Debt service as a share of average Washington plant payroll2.0%11.0%
    Application path under 5001.306Streamlined (loan of $600,000 or less)Full application; study compulsory if the borrower is new
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$11,900.00$74,375.00
    New business, 5001.105(d)(4): 25% of project cost$133,333.33 on $533,333.33$833,333.33 on $3,333,333.33
    New business, 5001.105(d)(4): 20% balance sheet equity (4:1)$100,000.00$625,000.00
    Existing business, 5001.105(d)(1): 10% of project cost$44,444.44 on $444,444.44$277,777.78 on $2,777,777.78
    SBA 7(a) on the same loan: guaranteed / fee ceiling$300,000.00 / $9,000.00$1,875,000.00 / $67,812.50

    The ratios show where the risk lies. Loan A's annual debt service, $44,497, is only 2.0% of the average Washington food plant's payroll, so a lender will look past coverage to working capital, raw material cost and customer concentration. Loan B needs $302,097.45 of NOI for 1.25x, and a new business must show $833,333.33 of equity on the 25% of cost test, or $277,777.78 if long-term sales contracts qualify it under 5001.105(d)(2). If the guarantee issues before construction is finished, the new-business equity test becomes 25%, $833,333.33, and the upfront fee rises to $74,375.00.

    Washington risks a food processing study has to carry

    • Raw material and weather. Tree fruit, cherries and potatoes are exposed to frost, heat and price swings; supply agreements and alternative sourcing need to be documented.
    • Seasonal working capital. Harvest inventory builds payables and stock in a few months; 5001.202 requires quarterly cash flow for seasonal borrowers.
    • Labour in harvest season. Plants compete with orchards and packers for the same workers; the hub notes thin childcare capacity in these labour sheds.
    • Program pauses. Controlled environment agriculture and biodigester projects face the guarantee pause the hub reports through 31 December 2026.
    • Illegal products. The hub's guidance under 5001.127(d) covers cannabis and intoxicating hemp, relevant to beverage and edible co-packers.
    • Intake window. A processor aiming to apply this autumn should note the hub's report that the B&I system closes to new files on 20 November 2026 while USDA moves to a replacement portal.

    What a lender-grade food processing feasibility study in Washington must prove

    1. Site eligibility under 5001.3, zoning for processing, and wastewater, water and power capacity.
    2. Supply: acreage, grower contracts or purchase history, with prices and alternatives in a short crop year.
    3. Demand: customer contracts, letters of intent or distributor commitments, and the share of sales each represents.
    4. A throughput model from equipment capacity, yields and operating days, by month.
    5. Labour at Washington wages benchmarked against $58,203, with seasonal staffing by month.
    6. Working capital for harvest inventory and receivables, and the line of credit that funds it.
    7. Food safety, certifications and buyer audit requirements, with their cost.
    8. Capital budget with quotes and contingency, and the construction draw schedule if the guarantee issues before completion.
    9. Coverage of at least 1.25x at stabilisation, with stresses on raw material price, volume and interest rate.

    Hiring a USDA food processing feasibility study consultant in Washington

    A newly formed processor seeking a B&I loan above $1,000,000 must commission an independent study whose scope the Agency sets; established processors and smaller loans face the Agency's and lender's discretion, which they exercise when the plan depends on new supply or new buyers. The USDA feasibility study consultant a processor hires must stand apart from the grower contracts, the equipment vendor, the builder and the bank.

    The site's cost page lists what the engagement includes: all five Part 5001 components, a five to ten year projection with sensitivity tables, market and competitive analysis, operator benchmarks, a management assessment, the report in PDF and Word with the Excel model, a kickoff and a midpoint call, a revision round, and a written acceptance guarantee. Process engineering, Phase I site work, the appraisal, legal documents and the lender's credit package are separate purchases. The cost page names value-added food processing among the classes that require primary research, so a new-product plant tends toward the top of the standard B&I band ($6,900 to $12,500, six to seven weeks) or into the complex band ($10,500 to $14,500, seven to nine weeks). A three-to-four-week rush is priced 20% to 35% higher.

    Have the process flow and equipment quotes, supply and sales agreements, three years of statements for an existing company, the capital and working capital budget, the staffing plan, owner résumés and the lender's term sheet ready. The national USDA food processing feasibility guide goes deeper on method. For a Washington plant, ask for a scoped proposal on the contact page; a senior analyst responds within one business day.

    Washington precedents (program evidence, not the firm's work)

    The hub reports REAP grants for energy upgrades at Borton & Sons and the Borton Fruit plant in Zillah, and at dairies including Royal Dairy, without award amounts; these were made under the earlier REAP rules. The site's engagements page lists a cold storage and dairy processing study in Washington in the $5 million to $25 million band and a value-added winery working capital study, as the site presents them. The Wisconsin dairy processing case study is an out-of-state analysis.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a Washington food processing plant need a feasibility study for a USDA loan?

    A processing start-up asking for more than $1,000,000 of B&I credit has no choice: the independent study is required by 7 CFR 5001.306(a)(3)(i), on USDA's terms of reference. Expansions by operating processors and loans of $1,000,000 or less are at USDA's discretion, and most Washington food manufacturing 7(a) loans, averaging about $406,000, would also qualify for the streamlined application. Lenders still ask for a study when a new product line or new supply base drives the projection.

    What does a food processing feasibility study consultant charge?

    Published fees run from $6,900 to $12,500 for an ordinary B&I engagement and from $10,500 to $14,500 when the project is complex, and the figure is locked in the proposal. Value-added food processing is one of the classes the site says needs primary research, such as buyer and supplier interviews, so a new product or a new plant usually sits toward the top of the standard band or in the complex band. Engineering and environmental work are separate.

    How long does a food processing study take?

    The site's schedule is six to seven weeks for standard work and seven to nine for complex studies, with a three to four week rush for 20% to 35% more. Processing studies move fastest when supply and customer letters are in hand at kickoff. If the plant processes a harvest crop, schedule the study so that grower and buyer interviews happen before contracting season rather than during harvest.

    Who can prepare a USDA food processing feasibility study?

    Someone USDA judges competent who gains nothing from the plant's ownership, its equipment order or its financing. Equipment vendors' capacity figures, grower supply letters and buyer commitments are evidence the consultant tests; they are not the study. The preparer must connect supply, throughput and sales by month and show coverage and working capital under stress.

    How long is a food processing feasibility study valid?

    Part 5001 sets no expiry date, but reviewers judge evidence by its age: the site's cost page says USDA generally expects market data inside about 18 months, and appraisals must be no more than a year old under 5001.203. A crop failure, a lost buyer or a change in commodity prices can date a Washington study within a season, so update the supply and pricing sections if the application slips.

    Can the same food processing study be used for SBA and B&I?

    Yes, if it is written to the USDA standard, with all five components and stressed projections; that also meets what SBA may require under 13 CFR 120.160(b). Washington processors have used SBA 230 times for 7(a) loans since FY2010, mostly for equipment and working capital, so a study that shows coverage under both a B&I term and an SBA structure helps the lender pick the better fit.

    Is a plant in the lower Yakima Valley or the Columbia Basin eligible for B&I?

    Usually, according to the hub's screen: Wapato, Toppenish, Zillah, Granger, Sunnyside and Grandview in the Yakima Valley, and Quincy and Moses Lake in the Basin, screen as eligible, while Yakima, Union Gap, Selah, Moxee and Naches sit in the Yakima urbanized area and Pasco, Kennewick and Richland exceed 50,000. Yakima and Franklin counties are metropolitan under OMB, so county status is not the test; the parcel needs a dated USDA determination.

    Can a fruit grower's packing or processing operation get a B&I loan?

    It can, if the processing business is set up and reported as a business in its own right. B&I treats agricultural production under 5001.105(b)(7), revised by the December 2025 technical amendments, so the study should separate the processing entity's revenue, costs and contracts from the orchard's. Long-term supply and sales contracts can also lower a new processor's equity requirement to 10% under 5001.105(d)(2).

    Will REAP pay for refrigeration or energy upgrades at a Washington plant?

    REAP can fund efficiency and renewable systems, and the hub cites past grants at Borton Fruit's Zillah plant and at Royal Dairy. Since 16 October 2026, though, a processor applies only after the upgrade has run for a year with metered results, receives no more than a quarter of the cost, and cannot combine grant and REAP loan above three quarters of it. According to the hub, a processor with any gambling receipts, even a lottery terminal in a farm store, cannot receive REAP. Underwrite the upgrade without the grant.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates: https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 90 FR 57351, OneRD guaranteed loan technical amendments (11 Dec 2025): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    7. 91 FR 11272, OneRD FY2026 guarantee fee, retention fee and guarantee percentage notice: https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    8. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USDA RBCS, REAP final rule with comment period, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    10. USDA Feasibility Study Consultants, Washington state page (crop statistics citing NASS and WSU, REAP precedents, eligibility screens, CEA and biodigester pause, program timing): https://usda-feasibility-study.com/washington
    11. USDA Feasibility Study Consultants, cost page, contact page and engagements index: https://usda-feasibility-study.com/usda-feasibility-study-cost ; https://usda-feasibility-study.com/contact ; https://usda-feasibility-study.com/engagements

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.