USDA Feasibility Study for General and Advanced Manufacturing in Washington

    NAICS 31-33

    Washington manufacturing pays more and is shrinking faster than the national sector, and both facts change how a USDA plant loan is underwritten. Census counted 6,586 manufacturing establishments in 2023, 351 fewer than in 2019 (-5.1%) against a national decline of 1.1%, while average pay reached $89,335, 22.0% above the US level. Just 750 plants, 11.4%, are in non-metro counties, roughly the 10.2% of residents who live there. A rural plant financed with a Business and Industry (B&I) guarantee therefore competes for skilled workers with metro employers paying Washington wages, and the feasibility study has to show that the products sell, that the labour can be hired, and that the plant covers its debt at that cost.

    Data current as of November 2026.

    When a plant loan needs a USDA feasibility study, and which program fits

    The decisive section is 7 CFR 5001.306(a)(3)(i): for a guaranteed loan above $1,000,000 to a new business, an independent consultant acceptable to the Agency must prepare the study, on the Agency's scope. Two related tests travel with it. A loan above $1,000,000 that is expected to create more than 50 jobs needs Department of Labor concurrence under 5001.306(a)(1), and every application above $600,000 needs a pro forma balance sheet at closing (5001.306(a)(2)). An existing manufacturer expanding a line is not "new" for the study rule, but USDA may still require a study when the file is thin (5001.306(a)(3)(ii)), which it usually is when the expansion depends on a new customer.

    B&I suits a rural plant: an 85% guarantee below $5 million and 80% to $25 million in fiscal 2026 (91 FR 11272), terms matched to the useful life of buildings and equipment up to 40 years (5001.402), and equity tests that reward a new business with signed sales contracts. Under 5001.105(d)(2), a new business whose contracts cover debt service for at least the loan term needs only 10% equity instead of 20% to 25%, which is the single most valuable provision for a contract manufacturer. SBA 504 has long financed Washington plants and equipment, 231 loans since FY2010, with the borrower's share at 10% to 20% under 13 CFR 120.910; 7(a) carried 1,477. REAP can fund efficiency or on-site renewable systems at an operating plant, but under the rule effective 16 October 2026 only after a year of metered results and for at most 25% of cost. The hub adds Washington's Commercial PACER program for energy, water and seismic improvements. A conventional term loan is the benchmark the guarantee fee must improve on.

    Screens before the market: 5001.127(a) bars a borrower or 20%-plus owner with delinquent federal debt or taxes, an outstanding federal court judgment or a debarment, and 5001.127(d) bars income from illegal products, which matters for any contract packager whose customer list includes cannabis or intoxicating hemp products, a risk the hub flags for Washington.

    Manufacturing in Washington: market evidence

    Washington: manufacturing establishments (all), supply and rural footprint

    MeasureWashingtonUnited States
    Establishments, 2019 → 20236,937 → 6,586 (-5.1%)287,626 → 284,452
    Per 100,000 residents (2023)84.084.5
    Average employees per establishment40.243.4
    Average annual pay per employee$89,335$73,202
    Share of establishments in non-metro counties11.4% (750 in 19 counties)
    Share of state population in non-metro counties (2025)10.2%

    Non-metro counties with the most manufacturing establishments (all) (2023): Lewis County (96); Grant County (76); Clallam County (75); Grays Harbor County (75); Island County (64); Jefferson County (63).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Density is at the national level, 84.0 plants per 100,000 residents against 84.5, so Washington is neither under- nor over-industrialised overall. The trend is the caution: a loss of 351 establishments in four years, nearly five times the national rate of decline, tells a reviewer that a new plant's market claims need named buyers rather than sector growth.

    Pay is the defining figure. At $89,335 a worker, Washington manufacturing payroll averages about $3,591,601 per establishment with 40.2 employees, and the hub links the sector to the state's aerospace and agricultural base. A rural plant will not pay metro aerospace wages, but it will lose trained staff to employers that do, so the study's wage line must cite local wage evidence and show the retention cost. First-quarter payroll is 26.4% of the annual total, above an even 25%, which suggests year-end bonuses paid in the first quarter rather than seasonal hiring; food and fruit-packing plants are the seasonal exception.

    Computed: Washington manufacturing establishments by number of employees, 2023 (Census CBP state file, NAICS 31-33)

    Employees at the siteManufacturing establishmentsShare of sized sites
    1 to 42,53138.4%
    5 to 91,24618.9%
    10 to 1999115.0%
    20 to 4991713.9%
    50 to 994426.7%
    100 to 2493264.9%
    250 to 499781.2%
    500 to 999410.6%
    1,000 or more140.2%

    Most Washington plants are small: 38.4% have fewer than five employees, and only 459 employ 100 or more. A rural plant of 20 to 99 employees, the band most B&I projects fall into, has 1,359 peers statewide, which is enough for wage and productivity benchmarks if the study draws them from the same industry group.

    Rural footprint and B&I eligibility in Washington

    Non-metro manufacturing clusters in Lewis (96), Grant (76), Clallam and Grays Harbor (75 each), Island (64) and Jefferson (63) counties, and density is highest in small counties: San Juan has 199.2 plants per 100,000 residents, Jefferson 185.5 and Klickitat 172.6, against 84.0 statewide. Several metropolitan counties are just as industrial: Walla Walla County carries 219.7 per 100,000 and Chelan 142.8, and their main towns sit below the 50,000 line.

    Computed: non-metro Washington counties with the most manufacturing establishments, 2023 (Census CBP county file; Vintage 2025 population)

    CountyOMB 2023 statusPlants, 2023Residents, 2025Plants per 100k residents
    Lewis CountyNonmetropolitan9688,062109.0
    Grant CountyNonmetropolitan76105,72771.9
    Clallam CountyNonmetropolitan7578,20295.9
    Grays Harbor CountyNonmetropolitan7578,14496.0
    Island CountyNonmetropolitan6485,65774.7
    Jefferson CountyNonmetropolitan6333,970185.5
    Klickitat CountyNonmetropolitan4224,331172.6
    Mason CountyNonmetropolitan4171,16557.6
    Kittitas CountyNonmetropolitan4048,80382.0
    San Juan CountyNonmetropolitan3718,577199.2
    Okanogan CountyNonmetropolitan3445,23075.2
    Pacific CountyNonmetropolitan2824,357115.0

    Eligibility follows 7 CFR 5001.3, not the county label: the site must lie outside every city of more than 50,000 at the 2020 Census and outside the urbanized area contiguous and adjacent to it, and the Agency will not approve an application conditioned on a site qualifying later. The Washington USDA page screens Wenatchee, Walla Walla, Mount Vernon, Moses Lake, Quincy and the lower Yakima Valley towns as eligible and lists Richland, Olympia, Lacey and Burien as excluded on population, with West Richland, Tumwater, Ferndale, Arlington and Lake Stevens excluded by contiguity. For an industrial site, the hub also notes that rural Growth Management Act rules often require a plant to sit inside a small-town urban growth area.

    Financing benchmarks: USDA B&I next to SBA

    Washington: SBA lending to manufacturing establishments (all)

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY2016634$270.4 million116$108.5 million
    FY2017 to FY2019309$175.5 million42$50.8 million
    FY2020 to FY2023272$188.9 million51$79.4 million
    FY2024 to FY2026262$131.1 million22$23.0 million

    Average 7(a) loan, FY2020 to FY2026: $599,281. Average 504 loan: $1.4 million. Of the 634 7(a) loans approved in FY2010 to FY2016 for Washington manufacturing establishments (all), 4.4% were charged off (national: 6.4% of 27,078), on average 61 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Computed: average manufacturing loan size by period (SBA FOIA, pack JSON)

    PeriodWashington average 7(a) loanUS average 7(a) loanWashington average 504 loan
    Fiscal 2010 to 2016$426,487$471,192$935,147
    Fiscal 2017 to 2019$568,053$536,937$1,208,786
    Fiscal 2020 to 2023$694,586$719,259$1,557,549
    Fiscal 2024 to 2026$500,338$658,980$1,044,045

    The SBA record is broad and better than average. Washington manufacturers took 1,477 7(a) loans and 231 504 loans in seventeen years, and 4.4% of the seasoned 7(a) cohort was charged off against 6.4% nationally, with losses about five years in. Loan size is modest and recently fell, from $694,586 in fiscal 2020 to 2023 to $500,338 in 2024 to 2026, against a national $658,980; 504 loans, which carry real estate, average $1,402,795. For B&I that means a typical equipment loan falls under the $600,000 streamlined line, while a new building or a new rural plant moves into the territory where the study is mandatory and the guarantee earns its fee.

    TermB&I ruleWhat it means for a Washington plant
    Guarantee85% under $5 million; 80% from $5 million to $25 million (91 FR 11272)Most rural plant expansions stay in the 85% tier
    Fees3.0% of the guaranteed share; 3.5% if the guarantee issues before construction is complete; 0.55% annual retentionReduced fee of 1.0% and 0.50% at 80% where 5001.454(d) criteria apply
    TermUseful life up to 40 years, no balloon (5001.402)Blend building and equipment lives; 15 to 25 years is common
    Equity, new plant with contracts10% balance sheet equity or 10% of cost if sales contracts cover debt service for the loan term (5001.105(d)(2))Offtake contracts can halve the equity requirement
    Equity, other new plants20% balance sheet equity (4:1) or 25% of cost; 25% if the guarantee issues before completion (5001.105(d)(3) and (4))Typical for a speculative product launch
    Equity, existing manufacturer10% under 5001.105(d)(1); may be reduced with guarantees and RMA-median ratios (5001.105(d)(5))Expansions by operating firms
    JobsDOL concurrence if over $1,000,000 and more than 50 jobs (5001.306(a)(1))Build into the schedule for larger plants
    ConstructionFirm fixed-price contract, equity injected first, bonding or contractor vetting when the guarantee issues before completion (5001.205(e)(2))Construction cash flow and contingency must be in the study

    Worked example (illustrative)

    Inputs. Loan A is $600,000, the Washington FY2020 to FY2026 manufacturing 7(a) average of $599,281 rounded; it sits exactly at the $600,000 streamlined limit. Loan B is an illustrative $3,500,000 expansion with building and equipment. Both assume 7.25% fixed over 20 years with monthly payments (an assumption within 5001.401 and 5001.402, not a quote). The retention line uses the balance after twelve monthly payments, and equity lines assume the loan is the plant's only debt.

    Computed: B&I terms on two Washington manufacturing loans (Python, exact to the cent)

    LineLoan A: Washington 7(a) averageLoan B: illustrative plant expansion
    Loan amount$600,000.00$3,500,000.00
    Guarantee (fiscal 2026 notice)85%85%
    Guaranteed amount$510,000.00$2,975,000.00
    Lender's unguaranteed share$90,000.00$525,000.00
    Upfront guarantee fee$15,300.00 (3.0%)$89,250.00 (3.0%)
    Balance after 12 payments$586,138.33$3,419,140.25
    First annual retention fee$2,740.20 (0.55%)$15,984.48 (0.55%)
    Monthly principal and interest$4,742.26$27,663.16
    Annual debt service$56,907.07$331,957.91
    NOI for 1.00x (break-even)$56,907.07$331,957.91
    NOI for 1.25x$71,133.84$414,947.39
    Coverage if NOI falls 15%1.06x1.06x
    Coverage if the rate is 2 points higher1.08x1.08x
    Debt service in jobs at the state average wage0.6 jobs3.7 jobs
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$17,850.00$104,125.00
    New business, 5001.105(d)(4): 25% of project cost$200,000.00 on $800,000.00$1,166,666.67 on $4,666,666.67
    New business, 5001.105(d)(4): 20% balance sheet equity (4:1)$150,000.00$875,000.00
    Existing business, 5001.105(d)(1): 10% of project cost$66,666.67 on $666,666.67$388,888.89 on $3,888,888.89
    SBA 7(a) on the same loan: guaranteed / fee ceiling$450,000.00 / $13,500.00$2,625,000.00 / $95,937.50

    Loan B needs $414,947.39 of net operating income for 1.25x coverage. Expressed in Washington terms, its annual debt service of $331,958 equals the pay of 3.7 average manufacturing workers, so a plant adding ten jobs at state wages carries its debt only if those jobs produce well above their cost. If the guarantee issues before construction is finished, the upfront fee on Loan B rises to $104,125.00, and 5001.105(d)(3) raises a new company's equity to 25%. If Loan B's borrower is a new business with sales contracts covering debt service for the full term, 5001.105(d)(2) cuts the equity test to 10% of project cost, $388,888.89 instead of $1,166,666.67.

    Washington risks a manufacturing study has to carry

    • Labour competition. Average pay of $89,335 is set partly by metro aerospace and technology employers; rural plants need a wage and retention plan with local evidence.
    • Sector contraction. A 5.1% loss of establishments since 2019 means customer concentration and contract terms matter more than market growth rates.
    • Siting. The hub's Growth Management Act point: an eligible rural parcel may not be zoned for industry outside an urban growth area.
    • Illegal-product exposure. Contract manufacturers must screen customers for cannabis and intoxicating hemp products under 5001.127(d), as the hub advises for Washington.
    • Paused categories. Any plant built around a digester or a greenhouse should check the hub's report that USDA suspended guarantees for those two project types between 14 April and 31 December 2026.
    • Intake timing. According to the hub, the B&I platform stops accepting new applications on 20 November 2026 ahead of a new portal.

    What a lender-grade manufacturing feasibility study in Washington must prove

    1. Site eligibility under 5001.3 with a dated determination, plus zoning and utility capacity for the process.
    2. The product's market: named customers, contracts or letters of intent, pricing evidence and the share of sales each customer represents.
    3. A capacity and throughput model that links equipment specifications to output, yield and shifts.
    4. A labour plan priced at local wages and benchmarked against the $89,335 state average, with hiring sources and training costs.
    5. Raw material supply, freight and energy costs, including the effect of any REAP or PACER-funded efficiency measures only after they are secured.
    6. Capital costs with quotes, a contingency, and a construction schedule and draw plan if the guarantee issues before completion.
    7. Quarterly cash flow through start-up, working capital, and coverage of at least 1.25x at stabilisation with stress cases.
    8. A job count by year, so the lender knows early whether the Labor Department sign-off for big hiring projects applies.
    9. Management depth: plant manager, quality systems and the owners' record in the industry.

    Hiring a USDA manufacturing feasibility study consultant in Washington

    For a new manufacturing company borrowing above $1,000,000 under B&I, the independent study is a condition of the guarantee and its scope is the Agency's; for an existing manufacturer or a smaller loan it is at the Agency's or lender's discretion. Work with a USDA feasibility study consultant who has no stake in the equipment sale, the construction, the customer contracts or the loan.

    Per the site's cost page, the fee covers all five Part 5001 components, a five to ten year projection with sensitivities, market and competitive analysis, comparable benchmarks, a management assessment, the report in PDF and Word with an Excel model, a kickoff and a midpoint call, a revision round, and revisions at no extra charge until USDA or the lender accepts the report. Engineering, environmental assessments, appraisals, legal work and lender packaging are not included. Single-site loans of $1 million to $10 million in an established industry are priced in the standard B&I band of $6,900 to $12,500 over six to seven weeks; loans over $10 million, unusual products, multi-site or phased plants go to the complex band of $10,500 to $14,500 over seven to nine weeks. For an urgent submission, a three-to-four-week schedule adds 20% to 35%.

    Gather the process description and equipment quotes, customer contracts or letters of intent, three years of statements for an existing company, a capital budget and schedule, the staffing plan, owner résumés and the lender's term sheet. The national USDA industrial feasibility guide and the US manufacturing USDA financing report set out the method and national context. For a Washington plant, start with a proposal request on the contact page; the site commits to a reply from a senior analyst within one business day.

    Program evidence, honestly labelled

    The Washington hub names no B&I-financed manufacturing plant. Its closest in-state precedent is a 2023 REAP award of $979,000 to Sakata Seed America in Skagit County for an energy upgrade, reported from USDA Rural Development releases; it predates the October 2026 REAP rule, under which such grants are paid only after a year of operation. The site's Alabama manufacturing case study is an out-of-state analysis of a B&I plant expansion, not a Washington project.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    When does a Washington manufacturer need a USDA feasibility study?

    A study is compulsory when the borrower is a new business and the B&I loan exceeds $1,000,000, under 7 CFR 5001.306(a)(3)(i); USDA then sets the scope and must accept the consultant. An existing Washington manufacturer expanding a line is not covered by that rule, but the Agency may ask for a study when the file lacks information, and lenders usually want one when the expansion depends on a new customer or product.

    What does a manufacturing feasibility study consultant cost?

    On the site's published fee schedule, a single-site B&I study for a loan of $1 million to $10 million in an established industry costs $6,900 to $12,500. A plant above $10 million, a new or unusual product, or a multi-site or phased project falls in the complex band of $10,500 to $14,500. Engineering reviews, environmental reports and appraisals are separate costs that the sponsor buys from other professionals.

    How long does a manufacturing study take?

    The cost page schedules an ordinary plant study at six to seven weeks and a complex one at seven to nine; compressing either to three or four weeks adds a 20% to 35% premium. Manufacturing studies move fastest when equipment quotes and customer letters are ready at kickoff; the slowest part is usually confirming demand with buyers. Plan the Department of Labor concurrence for large job-creating plants in parallel, because it is a separate step.

    Who can prepare a B&I manufacturing feasibility study?

    An independent consultant that USDA accepts as qualified, with no financial interest in the borrower, the equipment vendor, the builder or the lender. Equipment suppliers' throughput claims and customers' letters are inputs, not the study. The preparer must connect process capacity to sales, cost the labour at Washington wages and show coverage under stress in a form the Agency's reviewer can follow.

    How long does a manufacturing feasibility study remain usable?

    There is no regulatory expiry in Part 5001, but USDA reviewers generally expect market data inside about 18 months, according to the site's cost page, and the real estate appraisal must be no more than a year old under 5001.203. A lost customer, a change in input prices or a delay in equipment delivery can make the study stale sooner, so refresh the contract and cost sections before submission if the schedule slips.

    Can a single study serve an SBA 504 lender and a B&I lender?

    Yes, if it is prepared to the USDA standard with all five components and stressed projections; SBA may require a feasibility study under 13 CFR 120.160(b) and the USDA-grade report covers it. Washington plants have used both programs, 1,477 7(a) and 231 504 loans since FY2010, so presenting coverage under a B&I term and under a 504 structure helps the lender choose.

    Do sales contracts reduce the equity a new Washington plant needs?

    They can. Paragraph (d)(2) of 7 CFR 5001.105 treats a start-up differently when buyers have already signed: if the contracts produce enough to pay the loan and run at least as long as it does, 10% equity suffices, against 20% to 25% for a start-up selling on hope. On the illustrative $3.5 million loan above, that is $388,888.89 rather than $1,166,666.67. The study must show the contracts and test the buyers' credit.

    Does a plant that adds more than 50 jobs face extra steps?

    Yes. For a guaranteed loan above $1,000,000 that will create more than 50 jobs, 7 CFR 5001.306(a)(1) requires Department of Labor concurrence before the guarantee. The feasibility study should state the expected job count by year and the wage levels, which in Washington average $89,335 in manufacturing, so the reviewer can see both the economic benefit and the payroll the plant must carry.

    Can REAP or Washington's PACER program fund a plant's energy systems?

    REAP can, but only after the efficiency or renewable system has run for twelve months, and the grant covers at most 25% of cost under the rule effective 16 October 2026. The hub also describes Washington's Commercial PACER program, enacted under RCW 36.165 and adopted by several counties, which finances energy, water and seismic improvements. Neither should be counted in the plant's base case until it is approved.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates: https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD FY2026 guarantee fee, retention fee and guarantee percentage notice: https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    8. USDA RBCS, REAP final rule with comment period, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    9. USDA Feasibility Study Consultants, Washington state page (sectors, eligibility screens, PACER, program pause and timing, REAP precedent): https://usda-feasibility-study.com/washington
    10. USDA Rural Development releases, as compiled in the Washington page's precedent table (Sakata Seed America, 2023): https://usda-feasibility-study.com/washington
    11. USDA Feasibility Study Consultants, cost and timeline page and contact page: https://usda-feasibility-study.com/usda-feasibility-study-cost ; https://usda-feasibility-study.com/contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.