Solar in rural Washington is financed by the farms, packers and small businesses that use the power, not by solar companies, and the Rural Energy for America Program (REAP) is the federal tool that matters. USAspending records 156 REAP grants and no REAP guaranteed loans in Washington from FY2024 to FY2026, against just four solar generation businesses with payroll in the 2023 Census data. The rule effective 16 October 2026 changed the economics: a REAP grant now covers at most 25% of cost, a project must be built and running with twelve months of data before it applies, and grant plus guaranteed loan cannot exceed 75% of cost. The hub adds that ground for financing solar through Business and Industry (B&I) has narrowed. A Washington solar feasibility study therefore has to support the loan that builds the system, prove the energy load and payback, and treat the grant as a later, competitive reimbursement.
Data current as of November 2026.
What the October 2026 REAP rule means for a Washington solar project
The current REAP terms date from a final rule with comment period printed at 91 FR 62600 on 1 October 2026 and in force from 16 October; it replaced the FY2025 to FY2027 funding notice that USDA withdrew in April 2026, so any Washington applicant without a signed financial assistance agreement had to start over. The terms below come from the rule text as recorded in this site's verified summary.
| Topic | Rule effective 16 October 2026 | What it means in Washington |
|---|---|---|
| Timing | Project period must end 12 to 24 months before the application (12 to 36 in the first window) | Build first, with a loan or cash; apply for the grant later |
| Data | 12 months of actual production or savings and 12 months of pre-installation data | Keep utility bills from before installation |
| Award size | $1,500 minimum; $500,000 maximum for renewable systems; $250,000 for efficiency | Large packing-house arrays hit the cap |
| Cost share | Grant at most 25% of project cost | The owner or lender carries 75% or more |
| Combined funding | Grant plus REAP guaranteed loan at most 75% of cost | Caps the loan when a grant is planned |
| Cropland | Ground-mount solar or wind on Cropland (7 CFR 718.2) ineligible; no retrofits of such systems | Orchard and field sites need screening; rooftops and non-cropland are safer |
| Foreign components | Systems with any component from a foreign adversary under 15 CFR 791.4 ineligible, except those installed before publication | A country-of-origin list for every component |
| Sizing | Ground-mount systems need commensurate historical energy use; storage at most 120% of prior annual use | Load analysis from bills, not from the roof area |
| Economics | Simple payback must not exceed useful life | Payback is an eligibility test |
| Locations | One location per application; one application per fiscal year per highest-level owner | Multi-orchard operations choose one site a year |
| Exclusions | EV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projects | Keep these out of the REAP budget |
| Installers | Licensed in the state with at least three similar installations; procurement under 2 CFR 200.318 to 200.327 | Installer qualifications go in the file |
| Competition | One competition for requests of $20,000 or less and one national competition; no state competitions | Washington applicants compete nationally |
No application window under the new rule had been announced in the Federal Register by 7 November 2026, so the next Washington filing date is unknown. The REAP guaranteed loan under 7 CFR 5001 is available for up-front costs, and under the fiscal 2026 notice (91 FR 11272) it carries an 80% guarantee, a 1.0% guarantee fee and 0.25% annual retention.
Which program fits, and when a study is required
For a REAP guaranteed loan, Part 5001's feasibility rule applies as it does to B&I: a guaranteed loan above $1,000,000 to a new business requires an independent study by a consultant the Agency accepts, on its scope (5001.306(a)(3)(i)); smaller loans are at its discretion. REAP grant applications carry their own technical and economic documentation. B&I has been a route for renewable systems, but the Washington hub states that "since an August 2025 USDA letter, wind and solar projects are ineligible for B&I"; that letter is not among the verified sources for this page, and the site's national renewable page cites a B&I provision for renewable systems, so confirm with the lender before planning a B&I solar loan. SBA 7(a) has financed two Washington solar generation businesses since FY2010. The hub also describes Washington's Commercial PACER program, under RCW 36.165 and adopted by King, Pierce, Snohomish, Spokane, Clark, Thurston and Whatcom counties, which finances energy, water and seismic improvements and can pay for solar where a county has adopted it. Community Facilities financing can serve a public or nonprofit facility's own solar.
Screens: the hub reports that under the new REAP rule any gambling income, including lottery or pull-tab revenue, makes an applicant ineligible; that statement is not in this site's verified rule summary, so confirm it. For REAP and B&I guaranteed loans, owners above 20% must clear 5001.127(a).
Solar and renewable generation in Washington: market evidence
Washington: solar and other renewable power generation, supply and rural footprint
| Measure | Washington | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 4 (n/a) | 405 → 942 |
| Per 100,000 residents (2023) | 0.1 | 0.3 |
| Average employees per establishment | 5.8 | 12.3 |
| Average annual pay per employee | $210,478 | $138,631 |
| Share of state population in non-metro counties (2025) | 10.2% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Four solar generation businesses with 23 employees in total is not a market in the sense a feasibility study usually measures; the $210,478 pay figure rests on so few workers that it means little. The count rose from none in 2019, while the national count more than doubled, from 405 to 942. The finding is that Washington solar is overwhelmingly behind-the-meter: a farm, packer, winery or store installs a system to cut its own power bill. The relevant evidence is that business's energy use and tariff, not a supply of competing generators.
The REAP award count is the better market indicator: 156 Washington REAP grants in FY2024 to FY2026, according to USAspending, set against 14 B&I loans and 41 Community Facilities awards in the same period. Those counts may be incomplete, and they include efficiency as well as renewable projects.
Regional comparison
Neighbouring packs show the same pattern. Oregon reports 9 solar generation businesses in 2023 (3 in 2019) and no SBA loans; Idaho 5 (4 in 2019) and two SBA 7(a) loans; Montana none. Across the four states there are 18 solar generation employers, so a REAP solar study in any of them rests on the applicant's own load data and installer quotes rather than on regional comparables. The national SBA line is a caution for any stand-alone generation business: 12.9% of 31 seasoned solar 7(a) loans were charged off, on average 51 months after approval.
Rural footprint and eligibility in Washington
REAP grants and guaranteed loans serve agricultural producers anywhere and rural small businesses in rural areas; the guaranteed loan uses the 7 CFR 5001.3 test, which excludes cities above 50,000 at the 2020 Census and their contiguous urbanized areas and does not allow approval on future qualification. The Washington state page screens Wenatchee, Quincy, Moses Lake, Walla Walla, Mount Vernon and the lower Yakima Valley towns as eligible and places Yakima, Union Gap, Selah, Moxee and Naches inside the Yakima urbanized area. With 10.2% of Washington residents in non-metro counties and the hub estimating that only 28% to 31% live in B&I-eligible areas, a rural business near a metro edge should confirm the parcel before designing the system. For farms, the cropland exclusion is the bigger constraint: ground-mounted solar on cropland is now ineligible for REAP, so orchard and field operations will usually look to rooftops, packing-house roofs or non-cropland ground.
Financing benchmarks: REAP and SBA
Washington: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 0 | $0 | 0 | $0 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 0 | $0 | 0 | $0 |
| FY2024 to FY2026 | 2 | $3.7 million | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $1.9 million. Washington had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
Two loans are not a benchmark. Across the country, the 138 SBA 7(a) loans to solar generation businesses in FY2020 to FY2026 averaged $478,591. For a farm or rural business adding solar, the financing is usually part of the owner's own credit, a REAP guaranteed loan, PACER where available, or equipment financing, and the feasibility question is whether the energy savings cover the debt.
| Term | REAP guaranteed loan | What it means for a Washington system |
|---|---|---|
| Guarantee | 80% (91 FR 11272) | Lower than B&I's 85% under $5 million |
| Fees | 1.0% upfront on the guaranteed share; 0.25% annual retention | $3,200 at closing on a $400,000 loan |
| Combined cap | Grant plus guaranteed loan at most 75% of project cost | At least 25% of cost is owner money |
| Term and rate | Useful life, no balloon (5001.402); negotiated rate (5001.401) | Match to panel and inverter life; inverters may need replacement within the term |
| Study | Independent study above $1,000,000 for a new business (5001.306(a)(3)(i)) | Most farm systems are smaller and discretionary |
| Grant timing | Grant only after 12 months of operating data | Bridge the 25% with cash or a short loan |
Worked example (illustrative)
Inputs. An illustrative $800,000.00 rooftop system at a rural Washington packing shed, financed two ways with a REAP guaranteed loan at an assumed 7.00% fixed over 20 years (illustrative; 5001.401 and 5001.402). Case A plans to apply for the maximum 25% grant, $200,000.00, after a year of operation, so grant plus loan is held to 75% of cost. Case B plans no grant and borrows 75% of cost. A 25-year useful life is assumed for the payback test. Retention is charged at 0.25% on the guaranteed part of the balance left after the first year's payments.
Computed: funding split for an illustrative $800,000 system under the October 2026 REAP rule
| Line | Case A: with a REAP grant | Case B: without a grant |
|---|---|---|
| Project cost (illustrative) | $800,000.00 | $800,000.00 |
| REAP grant (at most 25% of cost and $500,000) | $200,000.00 | $0.00 |
| REAP guaranteed loan | $400,000.00 | $600,000.00 |
| Grant plus loan as a share of cost (cap 75%) | 75.0% | 75.0% |
| Owner cash at closing | $400,000.00 | $200,000.00 |
| Owner cash after the grant is paid | $200,000.00 | $200,000.00 |
| Simple payback test: savings needed so payback is under a 25-year life | $32,000.00 a year | $32,000.00 a year |
Computed: REAP guaranteed loan terms for the two cases (Python, exact to the cent)
| Line | Case A: grant planned, loan at the 75% combined cap | Case B: no grant, loan at 75% of cost |
|---|---|---|
| Loan amount | $400,000.00 | $600,000.00 |
| REAP guarantee (fiscal 2026 notice) | 80% | 80% |
| Guaranteed amount | $320,000.00 | $480,000.00 |
| Lender's unguaranteed share | $80,000.00 | $120,000.00 |
| Upfront guarantee fee | $3,200.00 (1.0%) | $4,800.00 (1.0%) |
| First annual retention fee | $780.97 (0.25%) | $1,171.45 (0.25%) |
| Monthly principal and interest | $3,101.20 | $4,651.79 |
| Annual debt service | $37,214.35 | $55,821.52 |
| Annual savings or revenue for 1.25x | $46,517.94 | $69,776.90 |
| Coverage if output falls 15% | 1.06x | 1.06x |
| Coverage if the rate is 2 points higher | 1.08x | 1.08x |
Case A's owner must put $400,000.00 into the project at closing and wait at least a year to recover $200,000.00 through a competitive national grant; until then the grant is not cash. Case B needs $69,776.90 of annual energy savings or revenue for 1.25x coverage on the larger loan; Case A needs $46,517.94. Both comfortably exceed the $32,000.00 a year that a 25-year simple payback test requires, which shows that for a financed system the coverage test, not the payback test, sets the minimum savings. A system that cannot document savings of that size from twelve months of prior bills should be downsized.
Evidence a Washington solar feasibility study must build
- Energy use: at least twelve months of utility bills before installation, load profile by month, and the tariff and net metering terms that apply.
- System design: size justified by historical use (and storage within 120% of prior annual use), production estimate, degradation and inverter replacement.
- Site screening: rooftop or ground; if ground, evidence that the land is not Cropland under 7 CFR 718.2.
- Components: country of origin for every component, to clear the foreign-adversary exclusion.
- Installer: proof the contractor holds a Washington licence and has finished three or more comparable systems, plus the procurement record the rule requires.
- Economics: simple payback against useful life, coverage of any loan at 1.25x, and a case without the grant.
- Ownership and site control: at least 12 months of ownership or lease before the project period, and the one-application-per-year rule across related owners.
- Interconnection: the utility's interconnection approval and any upgrade costs.
Washington risks a solar study has to carry
- Grant timing and competition. The grant comes after a year, from one national competition; underwrite without it.
- Cropland and siting. Orchard and field ground-mounts are out; packing-house and shop roofs are the usual sites.
- Tariffs. Savings depend on the serving utility's rates and net metering terms, which differ across Washington's utilities and can change.
- B&I availability. The hub reports B&I is closed to wind and solar after an August 2025 USDA letter; confirm before relying on it.
- Gambling income. The hub reports any gambling income bars REAP; a farm store with lottery sales should check first.
- Funding notice. No REAP notice under the new rule had appeared as of 7 November 2026; timing of the next window is uncertain.
Hiring a USDA solar feasibility study consultant in Washington
A REAP guaranteed loan above $1,000,000 to a new business requires an independent study scoped by the Agency; smaller REAP loans and grant applications need technical and economic documentation that lenders and reviewers test closely under the new rule. The USDA feasibility study consultant for a solar project should be independent of the installer, the equipment supplier and the lender.
The site's cost page prices REAP work in two bands: studies for projects with a REAP loan under $600,000 at $4,900 to $8,500 over four to five weeks, and studies supporting a REAP guaranteed loan over $600,000 at $7,500 to $11,500 over five to seven weeks, the latter including full financial projections, coverage analysis and interconnection and utility rate modelling. Every engagement includes the five Part 5001 components where they apply, sensitivity analysis, the PDF and Word report with the Excel model, two scheduled calls, a revision round and the written acceptance guarantee; engineering, environmental work, appraisal and grant application drafting are excluded. Owners with an interconnection or construction deadline can shorten delivery to three or four weeks for 20% to 35% more.
Gather twelve months or more of utility bills, the installer's design and quote, component origin information, site ownership or lease documents, the interconnection application, financial statements and the lender's terms. The national renewable energy feasibility guide and the site's REAP feasibility page cover the program in depth. To scope a Washington system, request a proposal on the contact page; a senior analyst replies within one business day.
Washington REAP precedents (earlier rules; program evidence, not the firm's work)
The hub's precedent table lists a 2023 REAP award of $979,000 to Sakata Seed America in Skagit County for an energy upgrade, and its text reports REAP-funded energy upgrades at Borton & Sons, the Borton Fruit plant in Zillah, Royal Dairy and Leonetti Cellar in Walla Walla. All were made under the rules in force before 16 October 2026, when grants could fund projects before construction; the same projects would now be built first and reimbursed later, for at most 25% of cost. The site's Pennsylvania REAP solar case study is an out-of-state analysis of commercial rooftop solar.
Last updated 2026-11-08
USDA Feasibility, Inc.