USDA Feasibility Study for Sawmills and Wood Products in Washington

    NAICS 321

    Wood products are one of the few Washington industries that lean hard toward rural counties and pay well doing it. Census counted 378 wood product plants in 2023, nearly unchanged from 382 in 2019, and 28.6% of them stand in non-metro counties, almost three times the share of residents who live there. Their workers average $66,824 a year, 16.4% above the national wood products figure. Sawmills proper grew: 103 in 2023 against 97 in 2019, while the national count fell. The hub describes the timber base on the Olympic Peninsula, in the Cascades and in northeastern Washington, and the Business and Industry (B&I) program as a financing route for mills, with REAP for kilns and mill energy systems. What a lender will need from the feasibility study is proof of log supply, a product mix that sells through the lumber cycle, and coverage at Washington wages.

    Data current as of November 2026.

    When a mill needs a USDA feasibility study, and which program fits

    A new mill company borrowing more than $1,000,000 under B&I must supply a feasibility study from an independent consultant acceptable to the Agency, on a scope the Agency sets (7 CFR 5001.306(a)(3)(i)). Washington's recent wood products 7(a) average was $1,054,971, just above that line, and a new or restarted sawmill is usually far above it. An existing mill adding a line or kilns is not a new business, but USDA may still require a study under 5001.306(a)(3)(ii), and if the loan exceeds $1,000,000 and the project adds more than 50 jobs, Department of Labor concurrence is required (5001.306(a)(1)).

    B&I offers 85% coverage below $5 million and 80% from $5 million to $25 million in fiscal 2026 (91 FR 11272), and a mill with signed lumber or chip sales contracts covering debt service for the loan term can use the 10% equity test in 5001.105(d)(2). SBA 504 and 7(a) are the comparison: Washington wood plants took 62 7(a) loans and 12 SBA 504 loans since FY2010. REAP, which the hub highlights for kilns and mill energy systems, now pays at most 25% of cost and only after twelve months of operating data under the rule effective 16 October 2026, so a kiln or biomass boiler must be financed first and reimbursed later. Community Facilities financing does not serve private mills. A conventional equipment loan sets the baseline.

    Every active owner with more than a fifth of the mill company faces the federal debt, tax, judgment and debarment checks in 5001.127(a). Timber harvesting is not processing: if the mill company also owns timberland or a logging operation, the study should report the mill as its own business so that B&I eligibility is judged on the processing activity.

    Sawmills and wood products in Washington: market evidence

    Washington: wood product manufacturing, supply and rural footprint

    MeasureWashingtonUnited States
    Establishments, 2019 → 2023382 → 378 (-1.0%)14,223 → 13,899
    Per 100,000 residents (2023)4.84.1
    Average employees per establishment35.031.1
    Average annual pay per employee$66,824$57,420
    Share of establishments in non-metro counties28.6% (104 in 12 counties)
    Share of state population in non-metro counties (2025)10.2%

    Non-metro counties with the most wood product manufacturing (2023): Grays Harbor County (31); Lewis County (20); Clallam County (12); Mason County (7); Jefferson County (5); Kittitas County (5).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    The sector held steady (-1.0%) while the national count fell 2.3%, and density, 4.8 plants per 100,000 residents against 4.1, confirms that Washington has more wood processing than its population would predict. Plants are larger than average, 35.0 employees against 31.1, and payroll runs about $2,338,831 per plant at $66,824 a worker. That wage premium is the first number a reviewer will compare against the study's labour line.

    Within the sector, sawmills are the growth segment. The 103 Washington sawmills employ 5,131 people at about $71,142 each, and their count rose +6.2% while the national sawmill count changed -2.8%. First-quarter payroll is 23.9% of the annual total, close to an even year, so mill employment is not strongly seasonal even though log supply can be.

    Computed: Washington sawmills by number of employees, 2023 (Census CBP state file, NAICS 321113)

    Employees at the siteSawmills (NAICS 321113)Share of sized sites
    1 to 42524.5%
    5 to 92019.6%
    10 to 191615.7%
    20 to 49109.8%
    50 to 9998.8%
    100 to 2492221.6%

    The size table shows a split industry: 45 mills with fewer than ten employees and 22 with 100 to 249. A small mill seeking B&I will be compared with the first group, and a reviewer will expect its productivity and margins to reflect small-mill economics rather than those of large commodity mills.

    Rural footprint and B&I eligibility in Washington

    At 2.8 times the population's rural share, wood products are among the most rural Washington industries in the state data file. Grays Harbor County has 31 plants, 39.7 per 100,000 residents; Lewis 20; Clallam 12; Mason 7; and Jefferson, Kittitas, Klickitat and San Juan five each. Several metropolitan counties are also timber counties: Stevens (11 plants, 22.1 per 100,000), Cowlitz (13) and Skagit (15).

    Computed: Washington counties with the most wood product plants, 2023 (Census CBP county file; Vintage 2025 population; OMB July 2023 status)

    CountyOMB 2023 statusWood plants, 2023Residents, 2025Wood plants per 100k residents
    Pierce CountyMetropolitan41946,2884.3
    Snohomish CountyMetropolitan41870,6564.7
    King CountyMetropolitan362,344,9391.5
    Grays Harbor CountyNonmetropolitan3178,14439.7
    Whatcom CountyMetropolitan25236,39210.6
    Lewis CountyNonmetropolitan2088,06222.7
    Clark CountyMetropolitan18532,1193.4
    Spokane CountyMetropolitan18558,3443.2
    Skagit CountyMetropolitan15132,97511.3
    Cowlitz CountyMetropolitan13114,88511.3
    Clallam CountyNonmetropolitan1278,20215.3
    Stevens CountyMetropolitan1149,66822.1

    The governing test is 7 CFR 5001.3: outside any city above 50,000 at the 2020 Census and outside its contiguous urbanized area, with no approval granted on the hope that a site will qualify. Most mill sites in Grays Harbor, Lewis, Clallam, Mason and Stevens counties are far from such cities, but mills near Tacoma, Everett or Bellingham can fall inside excluded urbanized areas; the Washington state page lists Ferndale and Arlington as excluded by contiguity even though both are under 50,000. The hub also notes that under the Growth Management Act a rural plant may need to sit inside a small-town urban growth area, which matters for a new mill more than for an existing one.

    Financing benchmarks: USDA B&I next to SBA

    Washington: SBA lending to wood product manufacturing

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY201634$12.6 million2$1.8 million
    FY2017 to FY201911$4.7 million8$9.9 million
    FY2020 to FY20238$3.1 million2$2.7 million
    FY2024 to FY20269$14.8 million0$0

    Average 7(a) loan, FY2020 to FY2026: $1.1 million. Average 504 loan: $1.3 million. Of the 34 7(a) loans approved in FY2010 to FY2016 for Washington wood product manufacturing, 2.9% were charged off (national: 7.1% of 1,015), on average 151 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Two things stand out. Losses have been rare and very late: one of 34 seasoned loans, 2.9% against 7.1% nationally, charged off on average 151 months after approval. And loan size has jumped: the 2024 to 2026 average was $1,648,933 across nine loans, against $386,762 across eight in 2020 to 2023, which suggests that recent SBA borrowers financed mills and lines rather than single machines. For B&I, those figures put a typical modernisation well inside the 85% tier and over the $1,000,000 study line for a new company.

    TermB&I ruleWhat it means for a Washington mill
    Guarantee85% under $5 million; 80% from $5 million to $25 million (91 FR 11272)A saw line or kiln project stays at 85%; a new mill often drops to 80%
    Fees3.0% upfront on the guaranteed share (3.5% before construction completion); 0.55% annual retention$114,750 at closing on a $4.5 million loan
    TermUseful life up to 40 years, no balloon (5001.402)Saw lines and kilns usually justify 10 to 15 years; buildings longer
    Equity with contracts10% when lumber, chip or residual sales contracts cover debt service for the loan term (5001.105(d)(2))Long-term offtake can cut equity sharply
    Equity, other new mills20% balance sheet equity (4:1) or 25% of cost; 25% if the guarantee issues before completion (5001.105(d)(3) and (4))Restarts and greenfield mills
    JobsDOL concurrence above $1,000,000 with more than 50 jobs (5001.306(a)(1))Large mills need this in the schedule
    CollateralAppraisal over $250,000; specialised equipment discounted; going-concern value deducted (5001.203)Used mill equipment has thin resale markets

    Worked example (illustrative)

    Inputs. Loan A is $1,050,000, the Washington FY2020 to FY2026 wood products 7(a) average of $1,054,971 rounded. Loan B is an illustrative $4,500,000 modernisation (saw line, kilns, planer). Both assume 7.50% fixed over 15 years, monthly, reflecting equipment lives (an assumption within 5001.401 and 5001.402). Output of 12,000 and 40,000 thousand board feet (MBF) a year is illustrative. Retention uses the balance after a year of payments, and equity rows assume no other debt.

    Computed: B&I terms on two Washington mill loans (Python, exact to the cent)

    LineLoan A: Washington 7(a) averageLoan B: illustrative mill modernisation
    Loan amount$1,050,000.00$4,500,000.00
    Guarantee (fiscal 2026 notice)85%85%
    Guaranteed amount$892,500.00$3,825,000.00
    Lender's unguaranteed share$157,500.00$675,000.00
    Upfront guarantee fee$26,775.00 (3.0%)$114,750.00 (3.0%)
    Balance after 12 payments$1,010,610.71$4,331,188.77
    First annual retention fee$4,724.61 (0.55%)$20,248.31 (0.55%)
    Monthly principal and interest$9,733.63$41,715.56
    Annual debt service$116,803.56$500,586.67
    NOI for 1.00x (break-even)$116,803.56$500,586.67
    NOI for 1.25x$146,004.45$625,733.34
    Coverage if NOI falls 15%1.06x1.06x
    Coverage if the rate is 2 points higher1.11x1.11x
    Debt service as a share of average Washington wood-plant payroll5.0%21.4%
    NOI per thousand board feet for 1.25x (illustrative output)$12.17 (12,000 MBF a year)$15.64 (40,000 MBF a year)
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$31,237.50$133,875.00
    New business, 5001.105(d)(4): 25% of project cost$350,000.00 on $1,400,000.00$1,500,000.00 on $6,000,000.00
    New business, 5001.105(d)(4): 20% balance sheet equity (4:1)$262,500.00$1,125,000.00
    Existing business, 5001.105(d)(1): 10% of project cost$116,666.67 on $1,166,666.67$500,000.00 on $5,000,000.00
    SBA 7(a) on the same loan: guaranteed / fee ceiling$787,500.00 / $27,562.50$3,375,000.00 / $124,062.50

    Loan B needs $625,733.34 of net operating income for 1.25x, which at 40,000 MBF of annual output is $15.64 per MBF; Loan A needs $12.17 per MBF at 12,000 MBF. Those are the margins, after log cost, labour, energy and overhead, that a study must show the mill earns across the lumber price cycle. Loan B's debt service is 21.4% of the average Washington wood plant's payroll, a reminder that the loan is small next to the operating risk.

    Computed: stress test for the two mill loans

    ScenarioLoan ALoan B
    Base case: NOI at 1.25x$146,004.45 / 1.25x$625,733.34 / 1.25x
    NOI down 10%$131,404.00 / 1.13x$563,160.01 / 1.13x
    NOI down 20%$116,803.56 / 1.00x$500,586.67 / 1.00x
    NOI down 30%$102,203.11 / 0.88x$438,013.34 / 0.88x
    Rate 1 point higher, re-amortised1.18x (debt service $124,077.18)1.18x (debt service $531,759.36)
    Rate 2 points higher, re-amortised1.11x (debt service $131,572.31)1.11x (debt service $563,881.33)
    Rate 3 points higher, re-amortised1.05x (debt service $139,280.26)1.05x (debt service $596,915.42)

    A 20% fall in NOI takes either loan to break-even; in lumber, a weak price year can do that, which is why reviewers ask for a downturn scenario and the cash reserve that carries the mill through it.

    Washington risks a sawmill study has to carry

    • Log supply. Federal, state, tribal and private timber sales, haul distances and log prices drive feasibility; supply agreements and alternative sources must be documented.
    • Lumber price cycle. Margins swing with commodity prices; the projection needs a downturn year, not just a stabilised one.
    • Wages. At $66,824 a worker for wood products and about $71,142 for sawmills, labour cost is above national norms.
    • Residuals. Chips, sawdust and bark need buyers or on-site use; their value and disposal cost belong in the model.
    • Energy and REAP timing. Kiln and boiler upgrades qualify for REAP only after a year of operation under the October 2026 rule, and the hub reports any gambling income bars REAP.
    • Filing window. Mill sponsors hoping to file before year end should note the hub's report that USDA's B&I system takes no new applications after 20 November 2026 while a new portal is built.

    What a lender-grade sawmill feasibility study in Washington must prove

    1. A dated USDA eligibility determination and zoning for industrial use, including any urban growth area question.
    2. Log supply by source and species, with volumes, haul distances, contracts and price history.
    3. A product and market plan: lumber grades, specialty products and residuals, with named buyers and contract terms.
    4. Production modelled from equipment capacity, recovery rates, shifts and downtime.
    5. Labour priced at Washington mill wages and benchmarked against the $66,824 sector average.
    6. Energy, kiln and residual handling costs, with any REAP or PACER funding shown only once approved.
    7. Capital budget with vendor quotes, installation, contingency and the construction or installation schedule.
    8. Quarterly cash flow, working capital for log inventory, 1.25x coverage at stabilisation, and a price-downturn stress case.
    9. Management: mill manager and owners' record in sawmilling.

    Hiring a USDA sawmill feasibility study consultant in Washington

    A new mill company borrowing above $1,000,000 under B&I must deliver an independent study scoped by USDA; an operating mill or a smaller loan falls under the Agency's and lender's discretion, which they often exercise when a modernisation changes the product mix. The USDA feasibility study consultant for a mill must be free of any interest in the timber, the equipment sale, the installation or the loan.

    For a mill, the cost page's standard deliverable means a report on the five Part 5001 components backed by a five to ten year model with price and volume sensitivities, peer-mill benchmarks, a review of the management team, two scheduled calls, a round of revisions and a written promise to keep revising until USDA or the lender signs off; the report arrives in PDF and Word with the Excel workbook. Mill engineering, the equipment appraisal, Phase I work and legal or lender-package preparation are bought elsewhere. A single-site mill loan of $1 million to $10 million prices in the standard B&I band of $6,900 to $12,500 over six to seven weeks; a new or restarted mill above $10 million, a phased project or limited comparables moves to $10,500 to $14,500 over seven to nine weeks. Where a mill purchase has a closing date, a three-to-four-week schedule is available at 20% to 35% extra.

    Prepare log supply agreements or history, equipment quotes and layout, three years of mill statements if operating, product and buyer information, the capital budget, owner and manager résumés and the lender's term sheet. The national USDA sawmill feasibility guide covers the method in depth. To scope a Washington mill, use the contact page to request a proposal; the site promises a reply from a senior analyst within one business day.

    National program examples (outside Washington)

    The Washington hub names no USDA-financed mill in the state. This site's national sawmill page reports Pacific Northwest examples from Rural Development releases and lender announcements, repeated as the site states them and not as the firm's work: a 2026 Timber Production Expansion and B&I package of $30,000,000 to Clatskanie Scion LLC for a new sawmill in Clatskanie, Oregon, and a 2026 Timber Production Expansion award of $9,000,000 to Tamarack Mill LLC in New Meadows, Idaho. The Pennsylvania hardwood mill case study is an out-of-state analysis.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a Washington sawmill need a feasibility study for a B&I loan?

    A start-up mill company asking for more than $1,000,000 of guaranteed credit cannot avoid it: 7 CFR 5001.306(a)(3)(i) makes the independent report a condition, with USDA approving both the author and the outline. Washington's recent wood products 7(a) loans averaged about $1.05 million, and a new or restarted mill typically costs far more. Operating mills adding equipment can be asked for a study at the Agency's discretion, and lenders usually ask when the product mix or log supply changes.

    What does a sawmill feasibility study consultant charge?

    On the site's fee schedule, a single-site mill study for a loan of $1 million to $10 million costs $6,900 to $12,500, and a complex study, such as a new mill above $10 million, a phased restart or a project with few comparables, costs $10,500 to $14,500. The fee is fixed in a written proposal. Engineering, equipment appraisal and environmental work are separate.

    How long does a sawmill study take?

    Plan on six or seven weeks for an ordinary mill study and up to nine when the project is complex; a compressed three-to-four-week version costs a fifth to a third more. Log supply evidence takes the longest to assemble; if timber sale records, purchase agreements and haul data are ready at kickoff, the study moves faster. Equipment lead times should be planned alongside the study, not after it.

    Who can prepare the feasibility study for a mill loan?

    An independent consultant USDA accepts as qualified, with no financial interest in the mill, its timber supply, the equipment vendor, the installer or the lender. Foresters, equipment suppliers and engineers provide inputs that the consultant tests. The preparer must model recovery, product mix and prices across the lumber cycle and present coverage under stress for the Agency's reviewer.

    How long does a mill feasibility study remain valid?

    Part 5001 sets no expiry. Market evidence older than roughly eighteen months tends to draw comment from USDA, by the cost page's account, and an appraisal past its first birthday fails 5001.203. Lumber and log prices move quickly, so a Washington mill study more than a few quarters old should be refreshed with current prices and supply terms before the lender submits it.

    Can the same mill study serve SBA and USDA?

    Yes, if it is prepared to the USDA standard with all five components and stressed projections, which also covers what SBA may require under 13 CFR 120.160(b). Washington wood plants used SBA 7(a) 62 times and 504 12 times since FY2010, with a seasoned charge-off rate of 2.9%. A study that shows coverage under both structures helps the lender decide which fits.

    Are mill sites in Grays Harbor, Lewis or Stevens counties eligible for B&I?

    Usually, because most sites there lie far from any city above 50,000 and its urbanized area, the test in 7 CFR 5001.3. Grays Harbor and Lewis are non-metro counties; Stevens is classed metropolitan under OMB but holds 11 wood plants at 22.1 per 100,000 residents, so the county label is not the test. Mills near Tacoma, Everett or Bellingham need closer checks. Every parcel needs a dated USDA determination.

    Can REAP pay for a kiln or biomass boiler at a Washington mill?

    It can, and the hub points to REAP for kilns and mill energy systems, but the rule effective 16 October 2026 changes the timing: the system must be built and operating with twelve months of data before the application, the grant is at most 25% of cost, and grant plus REAP guaranteed loan cannot exceed 75%. A further limit, reported by the hub, is that gambling receipts of any size now exclude a REAP applicant. Finance the kiln first; treat REAP as a possible later reimbursement.

    What log supply evidence does USDA expect in a Washington mill study?

    Enough to show the mill can buy the volume it needs at the price the model assumes for the life of the loan. That usually means a supply study by source (federal, state, tribal and private), species and haul distance, purchase agreements or a record of past purchases, price history, and an analysis of competing mills drawing on the same wood basket. Without it, a reviewer will treat the output projection as unsupported.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files (NAICS 321 and 321113): https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates: https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD FY2026 guarantee fee, retention fee and guarantee percentage notice: https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    8. USDA RBCS, REAP final rule with comment period, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    9. USDA Feasibility Study Consultants, Washington state page (timber regions, B&I and REAP roles, eligibility screens, growth-boundary rule, program timing): https://usda-feasibility-study.com/washington
    10. USDA Feasibility Study Consultants, national sawmill page (Oregon and Idaho examples as reported there), cost page and contact page: https://usda-feasibility-study.com/sawmill-feasibility-study-usda ; https://usda-feasibility-study.com/usda-feasibility-study-cost ; https://usda-feasibility-study.com/contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.