Census County Business Patterns shows no refrigerated warehousing establishments with paid staff in Montana in either 2019 or 2023, against 1,367 across the country, and the SBA FOIA file records no Montana cold storage loans since FY2010. That does not mean Montana has no cold storage; it means the state's chilled and frozen capacity sits inside meat plants, food processors, grocery distributors and general warehouses rather than in stand-alone public refrigerated warehouses. For a USDA cold storage feasibility study in Montana, the absence is the finding: a stand-alone facility would be a first of its kind in the published data, with no local comparables for rates or occupancy, and a lender will want the demand proved by named customers before anything is built.
Cold storage in Montana: market evidence
Montana: refrigerated warehousing, supply and rural footprint
| Measure | Montana | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 0 (n/a) | 1,350 → 1,367 |
| Per 100,000 residents (2023) | 0.0 | 0.4 |
| Share of state population in non-metro counties (2025) | 44.7% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
What zero means for underwriting. With no Montana establishments, the pack has no pay, size or county data, and nationally the industry is small (0.4 establishments per 100,000 residents) and made of large operations. A reviewer will read the zero three ways. First, demand may be met in-house by the food businesses that need it, so a new facility must offer them something cheaper or better than their own coolers. Second, there may be unserved demand from smaller processors and producers who cannot justify their own freezer space. Third, distribution may run through refrigerated warehouses in neighbouring states. The study has to establish which of these is true for the site's market, with evidence rather than assumption.
Where Montana's cold chain demand comes from
The other Montana packs locate the customers. The state has 66 meat and poultry plants, up 43.5 percent since 2019 and averaging 9.9 employees, many too small to hold large frozen inventories; 111 food manufacturers outside meat, averaging 17.5 employees; and 260 grocery stores, 54 percent of them in non-metro counties per the hub facts. Add direct-marketing livestock and produce growers, hunters' game processing in season, and food banks, and the demand base is real but fragmented. A study converts it into pallet positions by temperature zone and month.
Regional comparison
Each column is that state's own pack; none shows SBA cold storage lending.
| Measure (each state's pack) | Montana | Idaho | North Dakota | South Dakota | Wyoming |
|---|---|---|---|---|---|
| Refrigerated warehouses with paid staff, 2019 → 2023 | 0 → 0 | 13 → 13 | 0 → 3 | 4 → 3 | 0 → 0 |
| Per 100k residents, 2023 | 0.0 | 0.7 | 0.4 | 0.3 | 0.0 |
| Average employees per warehouse | n/a | 57.3 | 10.7 | 48.3 | n/a |
| Average pay per employee | n/a | $50,196 | $49,531 | $56,386 | n/a |
| SBA 7(a) and 504 loans, fiscal 2010 to 2026 | 0 | 0 | 0 | 0 | 0 |
Idaho's 13 facilities, four of them in non-metro Cassia County, show what an agricultural cold chain hub looks like: large, rural and tied to processing. North Dakota's three new facilities average 10.7 employees, the closest in scale to a Montana start-up. Wyoming, like Montana, reports none. For a Montana project, Idaho's pay ($50,196) and North Dakota's ($49,531) are the best available wage benchmarks, labelled as theirs.
National benchmarks
Nationally, SBA recorded 76 refrigerated warehousing 7(a) loans worth $97.7 million and 49 504 loans worth $114.6 million from FY2010 to FY2026. In FY2020 to FY2026, 7(a) loans averaged $1,424,256 and 504 loans $3,038,875. Of 38 national 7(a) loans approved in FY2010 to FY2016, 2 were charged off (5.3 percent), on average 76 months after approval; the sample is small, so the rate is a rough guide. Those are the comparables a reviewer will reach for in the absence of Montana data.
Rural footprint and B&I eligibility in Montana
With no establishments, there is no non-metro share to report; 44.7 percent of Montanans live in non-metro counties. B&I's test in 7 CFR 5001.3 requires the warehouse to sit outside the four Montana cities above 50,000, Billings, Missoula, Great Falls and Bozeman, and outside the urbanized land attached to each. Cold storage tends to locate near distribution hubs, and the obvious Montana hubs are those four cities, so a site on an industrial park just outside an urbanized area, or in Helena, Butte-Silver Bow or a rail and highway town, is the likely B&I candidate. SPUR, USDA's meat and poultry guarantee, covers cold storage that is part of a meat, poultry or seafood processing facility and has no geographic restriction, according to the site's national cold storage page. Site-by-site confirmation is explained in the Montana state guide.
Program fit and eligibility rules
B&I can finance construction, expansion, purchase and equipment for a rural refrigerated warehouse, with the FY2026 85 percent guarantee under $5 million and 80 percent from $5 million to $25 million. For the rest of the stack, SBA 504 fits an owner-occupied building, SBA 7(a) fits equipment and working capital, and REAP can fund refrigeration efficiency or solar once the warehouse has a year of operating data. The most important cold storage rule, as the national page reads Part 5001, is the bar on properties used primarily for commercial rental when the borrower has no control over tenants and services: a public warehouse that receives, stores and ships customers' product is an operating business, while a building leased in full to one tenant looks like rental real estate and should be tested with the state office first. Agricultural cooperatives are a natural borrower for shared cold storage.
Financing benchmarks: USDA B&I terms
Montana has no SBA cold storage lending to tabulate, so the national figures above stand in for the state's SBA history.
| Term | USDA B&I, fiscal 2026 | Source |
|---|---|---|
| Guarantee, loans under $5 million | 85% | 91 FR 11272 |
| Guarantee, $5 million to $25 million | 80% | 91 FR 11272 |
| Upfront guarantee fee | 3.0% of the guaranteed amount | 91 FR 11272; 7 CFR 5001.454 |
| Annual retention fee | 0.55% of the guaranteed share of principal outstanding on December 31 | 91 FR 11272; 7 CFR 5001.455 |
| Reduced-fee loans (criteria in 5001.454) | 1.0% fee, 0.50% retention, 80% guarantee | 91 FR 11272 |
| Guarantee issued before construction is complete | additional 0.50% fee | 91 FR 11272; 7 CFR 5001.454 |
| Maximum loan per borrower | $25 million | 7 CFR 5001.406(c) |
| Term | useful life of the collateral, 40 years at most, no balloon | 7 CFR 5001.402 |
| Interest rate | negotiated, fixed or variable, no higher than the lender's similar non-guaranteed loans | 7 CFR 5001.401 |
| Equity, existing business | 10% balance sheet equity (or debt to equity of 9:1), or 10% of project cost | 7 CFR 5001.105(d)(1) |
| Equity, new business | 20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) when the guarantee issues before construction is complete | 7 CFR 5001.105(d)(3), (d)(4) |
| Independent feasibility study | required above $1,000,000 for a new business; at the Agency's discretion otherwise | 7 CFR 5001.306(a)(3) |
| SBA 7(a), for comparison | 85% guarantee up to $150,000, 75% above | 13 CFR 120.210 |
| SBA 504, for comparison | borrower injection 10%; 15% if new or single purpose; 20% if both | 13 CFR 120.910 |
What it means for a Montana project. At the national 7(a) average a project is a small cooler and freezer building in the 85 percent tier; at twice the national 504 average it becomes a regional facility near or above $5 million, where the guarantee drops to 80 percent. Because there are no Montana comparables, USDA may raise the equity requirement under 5001.105(d)(5) for industry status, collateral and the strength of the feasibility study, and the study's quality becomes part of the credit case. Montana recorded one B&I loan award across all industries in FY2024 to FY2026 on USAspending (counts may be incomplete).
Worked example (illustrative)
Montana has no SBA cold storage loans, so Loan A uses $1,425,000, rounding the national FY2020 to FY2026 7(a) average of $1,424,256, and Loan B is an illustrative $6,000,000 regional facility above the $5 million tier line. Both use an illustrative 7.50 percent fixed rate over 25 years.
| Input or result | Loan A | Loan B |
|---|---|---|
| Loan amount | $1,425,000.00 | $6,000,000.00 |
| Guarantee percentage (fiscal 2026 tier) | 85% | 80% |
| Guaranteed amount | $1,211,250.00 | $4,800,000.00 |
| Upfront guarantee fee (3.0% of the guaranteed amount) | $36,337.50 | $144,000.00 |
| Upfront fee if the guarantee issues before construction is complete (+0.50%) | $42,393.75 | $168,000.00 |
| First annual retention fee (0.55% of the guaranteed share of the balance after 12 payments) | $6,567.55 | $26,026.20 |
| Interest rate (illustrative, fixed) | 7.50% | 7.50% |
| Amortization (years, no balloon) | 25 | 25 |
| Monthly payment | $10,530.62 | $44,339.47 |
| Annual debt service (NOI for 1.00x, break-even on debt) | $126,367.49 | $532,073.65 |
| NOI for 1.25x coverage | $157,959.36 | $665,092.06 |
| Coverage at that NOI if the rate is 2 points higher | 1.06x | 1.06x |
| Coverage at that NOI if the term is 5 years shorter | 1.15x | 1.15x |
| Equity, new business, 25% of total project cost (5001.105(d)(4)) | $475,000.00 | $2,000,000.00 |
| Total project cost on that basis | $1,900,000.00 | $8,000,000.00 |
| Equity, new business, 20% balance sheet route if this loan is the only liability | $356,250.00 | $1,500,000.00 |
| Equity, existing business, 10% of project cost (5001.105(d)(1)) | $158,333.33 | $666,666.67 |
| Independent feasibility study (5001.306(a)(3)) | required for a new business (5001.306(a)(3)(i)) | required for a new business (5001.306(a)(3)(i)) |
Per-pallet-position test. If Loan A builds an illustrative 3,000 pallet positions, 1.25x coverage needs $52.65 of net operating income per position per year, about $4.39 a month; Loan B over an illustrative 12,000 positions needs $55.42 a year, about $4.62 a month, after energy, labour and maintenance. The study translates those figures into the occupancy and storage and handling rates required, and tests them against contracted volumes. Loan B also shows the cost of the 80 percent tier: $4,800,000 guaranteed, $1,200,000 unguaranteed, and a $144,000.00 upfront fee. Push the rate up two points and coverage falls to 1.06x; shorten amortization to 20 years and it is 1.15x.
Evidence the study must build when local comparables are thin
- Letters of intent or storage contracts from anchor customers (meat plants, food processors, distributors, cooperatives), with pallet volumes by temperature and season.
- Interviews with Montana food businesses on where they store product now, at what cost, and what would make them move it.
- Rates and terms from refrigerated warehouses in neighbouring states that Montana shippers currently use, with freight costs.
- A temperature-zone and seasonality model: harvest, fall livestock and hunting seasons, holiday inventory build.
- Utility tariffs and a confirmed electrical service capacity from the provider.
- A site analysis of truck access, rail if relevant, and distance to customers.
Risks, regulators and how the study tests them
Anchor customer loss is the largest risk for a facility with few customers; contract terms and a downside without the largest client mitigate it. Energy cost is the biggest controllable expense and depends on utility tariffs. Ammonia systems above 10,000 pounds fall under EPA's risk management program and OSHA's process safety management, and from 1 January 2026 new cold storage systems of 200 pounds or more may not use refrigerants with a global warming potential of 150 or more, according to the site's national cold storage page; refrigerant choice changes equipment cost. Power outages risk product loss, so backup generation and insurance belong in the budget. Construction overruns call for a fixed-price contract and, if the guarantee is wanted early, the 5001.205(e)(2) conditions. Special-purpose buildings appraise below cost under 5001.203.
Process, documents and what gets a study returned
The lender submits the study with its application to USDA's Rural Development state office for Montana. Cold storage sponsors should prepare customer letters or contracts, the design with temperature zones and refrigeration system, the construction budget, utility confirmation, the operating plan and fee schedule, financial statements, and the 20 percent owners' guarantees (5001.204). Studies come back when demand is inferred from population or national data, when a single tenant leases the whole building, or when energy costs are underestimated.
National program example (outside Montana)
The site's national cold storage page cites Origo Cold Storage in Madera County, California: a $35 million USDA guaranteed loan paired with $17 million of C-PACE financing for a 254,000 square foot temperature-controlled facility, made under USDA's since-discontinued Food Supply Chain program. It is reported here as that page states it, and it is outside Montana. The site's Arkansas protein-chain case study is linked below.
Hiring a USDA cold storage feasibility study consultant in Montana
For a new company borrowing more than $1,000,000 under B&I, an independent cold storage feasibility study consultant acceptable to the Agency must prepare the study (5001.306(a)(3)(i)). Because Montana has no published comparables, the first thing to settle with a USDA feasibility study consultant is where its occupancy and rate evidence will come from: contracts, interviews and out-of-state operators. Montana cold storage fits the cost page's description of complex B&I work, unusual asset classes and limited comparable data, priced at $10,500 to $14,500 over seven to nine weeks; the scope runs from customer and supply research and a temperature-zone demand model to an occupancy- and energy-stressed projection, technical, management and economic chapters, and the report and spreadsheet with one revision. Refrigeration engineering and environmental work are separate.
Send the project outline through the contact page: location, program (B&I or SPUR), cost range and lender status. The page commits to a senior analyst's reply within one business day.
Last updated 2026-11-08